ML20065G271
| ML20065G271 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/22/1982 |
| From: | Wells D DETROIT EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, EF2-59396, NUDOCS 8210040084 | |
| Download: ML20065G271 (1) | |
Text
,
Donald A. Wells Manaw ouw Awance Detroit Edison in""D5m-September 22, 1982 EF2-59396 i
Mr. James G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Camdssion 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Interim Report of the potential 10CFR50.55(e) Item on Deficiency in the Ioad-Carrying Capability of Certain Drywell Structural Steel (#78)
Dear Mr. Keppler:
On August 24, 1982, Detroit Edison's Mr. T.A. Alessi, Director-Project Quality Assurance, telephoned Mr. H. Westcott of NRC Region III, to report on a problem with load-carrying capability of certain drywell structural steel at the Fermi 2 site.
(
An evaluation by Edison Engineering of the loads carried by structural steel members in the drywell has revealed instances where the present l
loads exceed the design limit. A fix involving the reinforcing of affected members is being considered.
Another report on this item, either interim or final, is scheduled to be sent to you on or before January 20, 1983.
If you have questions concern-ing this matter, please contact Mr. G.M. Trahey, Assistant Director-Project Quality Assurance.
Very truly yours, DAW /DF/cp l
cc: Mr. Richard DeYoung, Director l
Office of Inspection and Enforcement Division of Reactor Inspection Programs Washington, D.C. 20555 j
Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccmnission 6450 North Dixie Highway Newport, Michigan 48166
__ i S h 8210040084 820922 PDR ADOCK 05000341 gp 3 'l N S
_