ML20065G200
| ML20065G200 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek, Crane |
| Issue date: | 04/06/1994 |
| From: | Mascari C GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20065G207 | List: |
| References | |
| 6000-94-026, 6000-94-26, C311-94-2050, C321-94-2049, NUDOCS 9404120222 | |
| Download: ML20065G200 (2) | |
Text
i GPU Nuclear Corporation Nuclear
- ""da-d Parsippany, New Jersey 07054 201-316 7603 C.A. Mascari j
Vice President and Director Nuclear Assurance Division l
l April 6, 1994 C311-94-2049 C321-94-2050 6000-94-026 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:
l
Subject:
Three Mile Island Nuclear Generating Station, Unit I (TMI-1)
Docket No. 50-289 Oyster Creek Nuclear Generating Station (OCNGS)
Dncket No. 50-219 Operat'. anal Quality Assurance Plan Revision During a meeting on February 24, 1994 GPU Nuclear presented an outline of a i
proposed Quality Assurance (QA) reorganization.
The GPU Nuclear Operations Quality Assurance (00A) Plan has been revised to reflect this reorganization of functional responsibilities.
All functions currently performed by the QA Department will be retained.
In accordance with the provisions of 10 CFR 50.54(a) GPUN conducted a formal review of the changes to the 00A Plan.
That review concluded that the proposed changes do not constitute a reduction of commitment and continue to be consistent with Appendix 'C' of the 00A Plan and Reg. Guide 1.28/ ANSI N45.2-1977.
Many of the functions currently performed by the Quality Assurance Department will be incorporated into a new Nuclear Safety Assessment Department.
The few remaining functions will be transferred to existing line organizations.
Independent assessments of the effectiveness of these groups and the adequacy of the programs will be performed by the Assessment organization.
In addition, those positions which require certification will be qualified to the same standards.
On the basis of that analysis, GPU Nuclear intends to implement the reorganization effective April 30, 1994.
I
'1
--[-
9404120222 940406 PDR ADOCK 05000219 P
I h>
PDR GPU Nuclear Corporabon rs a suosaary of General Pubhc Utilibes Corporabon
6000-94-026 i
i Page 2 A copy of the revised 00A Plan is attached for your information.
Should you have any questions or desire additional information regarding the changes to the 00A Plan or our determination that there is no reduction in commitment, GPUN will gladly meet with the NRC staff.. To arrange a meeting please contact Dennis Kelly (201-316-7885) of our Licensing Department.
Sincerely,
- c. A. L C.A. Mascari Vice President and Director cc: Administrator, Region 1 TM1 Senior Resident Inspector Oyster Creek Senior Resident inspector i
TMI Senior Project Manager Oyster Creek Senior Project Manager I
l i
1 e
= -
. m-.
m e
,,,_,,m,..,,,,,,,_._.-,.,yy.
7-3..y g7.,y y,yy,,,-
n,.
..y_,7y, i