ML20065G105
| ML20065G105 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/23/1982 |
| From: | TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Atomic Safety and Licensing Board Panel |
| Shared Package | |
| ML20065G093 | List: |
| References | |
| NUDOCS 8210040026 | |
| Download: ML20065G105 (5) | |
Text
_ - -. e m o _ -, -
.s.
-,m.--
)
6 0
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of:
)
)
TEXAS UTILITIES GENERATING
)
Docket Nos.
50-445 COMPANY, _e t _al.
)
50-446 (Comanche Peak Steam Electric
)
Station, Units 1 and 2)
)
APPL IC ANTS ' STATEMENT OF MATERIAL FACTS NOT GENUINELY IN ISSUE 1.
The Comanche Peak Steam Electric Station ("CPSES")
Emergency Plan identifies all state authorities having responsibility for emergency planning.
CPSES Emergency Plan 1.3.2. See Affidavit of Richard A. Jones.
2.
The CPSES Plan identifies all regional authorities responsible for emergency planning.
CPSES Emergency Plan $ 1.3.1.
See Af fidavit of Richard A. Jones.
3.
Texas Utilities Generating Company ("TUGCC") has obtained Letters of Agreement from Hood General Hospital, Hood County Sherif f, Hood General Ambulance Service, Somervell County Sheriff, Glen Rose-Somervell County Voluntaer Fire Department and Rescue-Ambulance Service, Radiation
\\
-eoa.c w 65YM L.
8210040026 82092?
PDR ADOCK 05000445 G
~
.w.m
,-mm
,m_ m -
-w _. -.
.- ~ om%
~. -
---e
-_---~m~
_2 Management Corporation, Texas Department of Health, Texas Department of Public Safety, U.S.
Department of Energy, and Squaw Creek park, Inc.
regarding warning and evacuation of the public and conduct of operations in the event of an emergency at CPSES.
CPSES Emergency Plan $ 15.0, Appendix H.
See Af fidavit of Richard A. Jones.
4.
Letters of Agreement obtained by TUGCO identify the principal of ficials responsible for warning and evacuation by title and agency.
CPSES Emergency Plan 5 15.0, Appendix H.
See Affidavit of Richard A. Jones.
5.
A Letter of Agreement with the Granbury Volunteer Fire Department is being renegotiated and will be included in the CPSES Emergency Plan when avail-able.
CPSES Emergency Plan { 15.0, Appendix H.
6.
Sections 1.3.1.3, 1.3.1.4, and 10.0 of the CPSES Emergency Plan describe arrangements for medical s uppo rt, including the services of physicians qualified to handle radiation emergencies and arrangements for transportation of injured or contaminated individuals beyond the site bounda ry.
These arrangements are further l
k
- ~ - - ~. -
._-_nn-m --
, n-l I
described in the Letters of Agreement between TUGCO and Hood General Hospital, Hood General Ambulance Service, Glen Rose-Somervell County i
Volunteer Fire Department and Rescue-Ambulance Service, and Radiation Management Corporation.
CPSES Emergency Plan $15.0, Appendix H.
Arrangements for handling of radiological patients are detailed in the Af fidavit of Roger E.
Linnemann, M.D.
I i
7.
The CPSES Emergency Plan adequately describes plans for testing of emergency plans by annual exercises i
and periodic drills.
CPSES Emergency Plan $ 12.0.
I' See Affidavit of Bobby La,ncaster.
l l
8.
The CPSES Emergency Plan provides for participation of state and local emergency authorities in i
emergency drills and exercises.
CPSES Emergency f
Plan $ 12.0.
Participation of state and local l
authorities is described in Letters of Agreement i
j with the responsible agencies.
CPSES Emergency Plan $ 15.0, Appendix H.
i h
)
i i
t l
l
't
,--a 9.
Arrangements for medical support include the immediate vicinity of the site and the City of Glen Rose.
CPSES Emergency Plan I 1.3.1.4, i 15.0, Appendix H.
See Affidavit of Roger E.
Linnemann, M.D.
10.
The City of Glen Rose-Somervell County Emergency Operations Plan, Fixed Nuclear Facility Response Plan, and Manual of Procedure for Incidents Involving the Comanche Peak Steam Electric Station provide for emergency planning in the City of Glen Rose.
See Somervell County Emergency Operations Plan {I III, IV, Annex F ( Attached to Jones Af fidavit as Attachment B).
11.
The Dallas /Forth Worth Metroplex lies outside the ten-mile plume exposure pathway emergency planning zone ("EPZ ").
CPSES Emergency Plan $ 15.0, Appendix G.
See Affidavit of Richard A. Jones.
12.
Much of Tarrant County and a small portion of Dallas County lie within the fifty-mile Ingestion Exposure Pathway EPZ.
l l
~ ~ - - - -, - - =
_. _ ~, _ -
r l
l 13.
The State is responsible for emergency planning in j
6 l
the Ingestion Exposure Pathway EPZ.
NUREG-0654, Rev. 1, II.J.ll.
j 14.
The Texas Emergency Management Plan provides for I
l emergency planning in the Ingestion Exposure s
j Pathway EPZ.
Texas Emergency Management Plan, Annex L, Appendix 7, Tab 1, Sections II.A.5, 5
II.2.,
II.D.1,.2, II.E.1, II.G.
(Attached to 1
0 Jones' Affidavit as Attachment C).
i 4
l i
2 1
A 1
i f
~%.
6 wmmmehem +, me -
-4 a.