Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20247J666 + (20:31:13, 16 March 2025)
- ML20247J622 + (20:31:18, 16 March 2025)
- PMNS20201022, Pre-application Review Meeting with Louisiana Energy Services D.B.A. Urenco USA (Uusa) + (20:31:39, 16 March 2025)
- L-98-098, Requests NRC Review & Approval of Listed Proposed Alternative Requests for Bvps,Units 1 & 2,ten-yr ISI Programs.Revised Requests Provide Alternative to 10CFR50.55a(g)(6)(11)(A) + (20:31:51, 16 March 2025)
- ML20247J245 + (20:31:58, 16 March 2025)
- ML20247J221 + (20:32:07, 16 March 2025)
- TAC:53983 + (20:33:12, 16 March 2025)
- ML20247J116 + (20:33:13, 16 March 2025)
- TAC:73157 + (20:34:11, 16 March 2025)
- ML20247H879 + (20:34:25, 16 March 2025)
- IR 05000232/2021001 + (20:34:43, 16 March 2025)
- IR 05000219/1989006 + (20:34:52, 16 March 2025)
- TAC:71145 + (20:35:44, 16 March 2025)
- ML20247H706 + (20:35:50, 16 March 2025)
- IR 05000193/1980001 + (20:36:10, 16 March 2025)
- ML20247H621 + (20:36:12, 16 March 2025)
- IR 05000498/1989036 + (20:36:50, 16 March 2025)
- IR 05000260/1989031 + (20:36:55, 16 March 2025)
- L-98-099, Informs of Change in Scheduled Completion Date for Commitment Contained in Response to Violations Noted in Insp Repts 50-334/97-08 & 50-412/97-08.Change Due to Rescheduling of Unit 2 Seventh Refueling Outage + (20:36:59, 16 March 2025)
- IR 05000266/1989001 + (20:37:09, 16 March 2025)
- 05000382/LER-1998-008, :on 980414,potential Concurrent Degraded Ecw Sys Trains a & B Was Noted.Cause Was Indeterminate. Affected Circuits Have Been Corrected (within Design Parameters) to Address Condition + (20:37:13, 16 March 2025)
- TAC:67046 + (20:37:30, 16 March 2025)
- ML20247H403 + (20:37:37, 16 March 2025)
- IR 05000361/1997024 + (20:37:40, 16 March 2025)
- IR 05000305/1989009 + (20:37:43, 16 March 2025)
- ML20247H336 + (20:37:58, 16 March 2025)
- IR 05000232/1963001 + (20:38:04, 16 March 2025)
- ML20247H317 + (20:38:10, 16 March 2025)
- IR 05000335/1989011 + (20:38:18, 16 March 2025)
- ML20247H196 + (20:38:40, 16 March 2025)
- ML20247H189 + (20:38:43, 16 March 2025)
- TAC:57744 + (20:38:52, 16 March 2025)
- ML20247H126 + (20:38:58, 16 March 2025)
- IR 05000313/1989022 + (20:39:13, 16 March 2025)
- ML20247H076 + (20:39:25, 16 March 2025)
- TXX-8907, Nonproprietary Suppl 1 to Addl Info in Support of Evaluation of Thermal Stratification for Comanche Peak Unit 1 Pressurizer Surge Line + (20:39:49, 16 March 2025)
- ML20247G978 + (20:39:59, 16 March 2025)
- IR 05000348/1989018 + (20:40:05, 16 March 2025)
- IR 05000317/1989200 + (20:42:35, 16 March 2025)
- IR 05000298/1989024 + (20:43:07, 16 March 2025)
- 05000277/LER-1989-007, Corrected LER 89-007-00:on 890411,green Discoloration Discovered in Grease on Stabs of Control Fuses in Switchgear.Root Cause of Event Under Investigation.Stabs Lubricated W/Different Type of Approved Grease + (20:43:19, 16 March 2025)
- ML20247G825 + (20:43:27, 16 March 2025)
- ML20247G787 + (20:43:36, 16 March 2025)
- 05000382/LER-1998-009, :on 980415,inadvertent ESF Actuation Occurred. Caused by Inadequate Configuration Control.Restored Incorrectly Lifted Lead to Terminal Point & Made Maint Personnel Aware of Drawing Discrepancy + (20:43:44, 16 March 2025)
- IR 05000219/1988033 + (20:43:47, 16 March 2025)
- ML20247G714 + (20:43:53, 16 March 2025)
- ML20247G701 + (20:43:57, 16 March 2025)
- IR 05000416/1989019 + (20:44:03, 16 March 2025)
- ML20247G666 + (20:44:10, 16 March 2025)
- L-98-102, Requests Written Interpretation from NRR Re Intent of TS Requirements for Channel Calibr of Resistance Temp Detectors & Thermocouples.Method for Clarifying TS Requirements Described in Info Notice 97-080 + (20:44:34, 16 March 2025)