Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000245/1996009 + (18:10:03, 16 March 2025)
- ML20248J673 + (18:10:05, 16 March 2025)
- ML20248J669 + (18:10:08, 16 March 2025)
- IR 05000312/1989004 + (18:10:14, 16 March 2025)
- IR 05000483/1998006 + (18:10:17, 16 March 2025)
- NSD-NRC-98-5646, Forwards Proprietary Results of AP600 Design Assurance Review,Per Commitment Contained in W Response to Violations Noted in Insp Rept 99900404/97-02. Proprietary Portion of Document Was Sent to Westinghouse + (18:10:18, 16 March 2025)
- ML20248J635 + (18:10:24, 16 March 2025)
- IR 05000458/1998005 + (18:10:26, 16 March 2025)
- ML20248J626 + (18:10:30, 16 March 2025)
- IR 05000445/1997018 + (18:10:31, 16 March 2025)
- ML20248J622 + (18:10:34, 16 March 2025)
- IR 05000327/1998001 + (18:10:35, 16 March 2025)
- ML20248J609 + (18:10:39, 16 March 2025)
- IR 05000298/1998012 + (18:10:43, 16 March 2025)
- 05000220/LER-1998-011-01, :on 980503,inadvertent Actuation of RPS Circuitry Occurred Due to Personnel Error.Fuse Was Replaced & SDC Was Placed Into Svc + (18:10:55, 16 March 2025)
- TAC:L32014 + (18:11:16, 16 March 2025)
- NRC-89-0052, Supplemental Reload Licensing Submittal for Fermi Plant Unit 2,Reload 1,Cycle 2 + (18:11:21, 16 March 2025)
- IR 05000331/1998004 + (18:11:35, 16 March 2025)
- 05000341/LER-1989-007, :on 890307,increasing Trend Observed in Vibration of Number 8 Bearing on Main Turbine Generator. Cause Undetermined.Turbine Balanced in Subsequent Outage. Disassembly &/Or Insp of Portions Planned + (18:11:39, 16 March 2025)
- IR 05000482/1998007 + (18:11:49, 16 March 2025)
- ML20248J413 + (18:11:56, 16 March 2025)
- IR 05000395/1998003 + (18:12:26, 16 March 2025)
- 05000313/LER-1998-002-03, :on 980505,automatic Actuation of CREVS Occurred Due to Higher than Normal Radiation at Detector When Filtration/Vacuum Assembly Was Moved in Adjacent Area. Revised Procedures to Add Noted Precautions + (18:12:33, 16 March 2025)
- ML20248J283 + (18:12:47, 16 March 2025)
- TAC:M98441 + (18:12:57, 16 March 2025)
- 05000313/LER-1989-008, :on 890122,determined That When Bypass Valve GCH-29 Normally Open,Ability of Radiation Monitors to Perform Required Functions Not Ensured.Caused by Error in Design Change in Bypass Line & Valve + (18:13:00, 16 March 2025)
- TAC:67016 + (18:13:01, 16 March 2025)
- ML20248J228 + (18:13:06, 16 March 2025)
- ML20248J224 + (18:13:10, 16 March 2025)
- ML20248J217 + (18:13:14, 16 March 2025)
- ML20248J215 + (18:13:16, 16 March 2025)
- NUREG-0683, Provides EPA W/Final Suppl 3 to Programmatic EIS Which Addresses Environ Considerations Under Natl Environ Policy Act of 1969 + (18:13:17, 16 March 2025)
- ML20248J207 + (18:13:23, 16 March 2025)
- ML20248J198 + (18:13:32, 16 March 2025)
- 05000361/LER-1998-009, :on 980429,discovered That CST Was Outside Design Basis Due to Procedure Error.Caused by Individual Error.Replaced Steps That Had Been Inadvertently Deleted from Aoi + (18:13:36, 16 March 2025)
- 05000361/LER-1996-012, :on 960229,discovered That CST Was Outside Design Basis.Cause Under Investigation.Compensatory Measures Were Put in Place to Administratively Increase Tanks Water Volume & to Procedularize Operator Actions + (18:13:42, 16 March 2025)
- ML20248J097 + (18:14:06, 16 March 2025)
- 05000324/LER-1989-014-02, :on 890910,primary Containment Local Leak Rate Testing Revealed Leakage Which Degraded Primary Containment Safety Barrier.Cause Under Investigation for Root Cause Determination.Leak Rate Testing Continuing + (18:14:10, 16 March 2025)
- 05000220/LER-1998-007-02, :on 980424,SRO Was Not in CR for Two Minutes. Caused by Insufficient Awareness of Assistant Station SS Role & Actions on Nuclear Safety.Counseled Assistant Station SS & Relieved Supervisor of Licensed Duties + (18:14:21, 16 March 2025)
- ML20248J060 + (18:14:29, 16 March 2025)
- 05000395/LER-1998-005, :on 980430,inadequate ASME Code Relief Valve Surveillance Testing Was Determined.Caused by Failure to Upgrade IST Implementing Procedures to Address Addl Test Requirements.Initiated Review + (18:14:36, 16 March 2025)
- 05000271/LER-1998-012, :on 980430,six Primary Containment Isolation Valves Were Declared Inoperable.Caused by Failure to Adequately Define Standards for Reducing Contact Forces Caused by Sharp Edges.Event Rept Initiated + (18:14:45, 16 March 2025)
- 05000458/LER-1989-032, :on 890907,unplanned ESF Actuation Occurred During Surveillance Test Procedure STP-207-4536.Caused by Technician Failure to Properly Lift Lead.Trip Signal Reset, Sys Restored & Procedure Completed + (18:14:52, 16 March 2025)
- 05000304/LER-1989-009-06, :on 890903,vent Stack Sping Flow Monitor 2LP084 Failed,Rendering Auxiliary Bldg Stack Radiation Monitor Inoperable.Caused by Personnel Error.Required Surveillance Performed + (18:15:08, 16 March 2025)
- 05000339/LER-1989-008-01, :on 890806,ESF Valve 2-RS-MOV-201B Closed Inadvertently During Initial Performance of 2-PT-36.5.3A. Caused by Misidentification of Interlock for 2-RS-MOV-201B. Tech Spec 3.0.3 Entered & Deviation Rept Done + (18:15:13, 16 March 2025)
- 05000456/LER-1989-008-09, :on 890905,Sargent & Lundy Engineers Evaluation Determined That W/Uncorrected Setpoints,Allowable Tech Spec Value Would Have Been Exceeded.Caused by Unclear Design Documents.Analysis of Setpoints Performed + (18:15:18, 16 March 2025)
- ML20248H926 + (18:15:30, 16 March 2025)
- ML20248H909 + (18:15:35, 16 March 2025)
- 05000293/LER-1998-009, :on 980430,incorrect Specification of Seismic Requirements for Safety SRV Line Vacuum Breakers,Were Discovered.Caused by Incorrect Use of Seismic Input Criteria.Problem Rept & Engineering Evaluation Written + (18:15:42, 16 March 2025)
- ML20248H854 + (18:15:58, 16 March 2025)
- ML20248H853 + (18:16:04, 16 March 2025)