Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20201032, Notice of Meeting with Southern Nuclear Operating Company + (17:00:05, 16 March 2025)
- 05000331/LER-2020-001, Notice of Unusual Event and Unit Trip Due to Loss of Offsite Power Due to High Winds + (17:00:13, 16 March 2025)
- IR 05000313/2020410 + (17:00:19, 16 March 2025)
- ML20258A091 + (17:00:38, 16 March 2025)
- ML20255A257 + (17:01:04, 16 March 2025)
- ML20255A253 + (17:01:09, 16 March 2025)
- ML20255A225 + (17:01:12, 16 March 2025)
- 05000529/LER-2020-001-01, Reactor Trip on Low Steam Generator Level Signal + (17:01:28, 16 March 2025)
- ML20255A129 + (17:02:11, 16 March 2025)
- EPID:L-2020-LLR-0062 + (17:02:19, 16 March 2025)
- 05000410/LER-2020-002-01, Failure to Meet Technical Specification MSIV Stroke Times + (17:02:26, 16 March 2025)
- EPID:L-2019-LLA-0052 + (17:03:00, 16 March 2025)
- ML20255A048 + (17:03:02, 16 March 2025)
- ML20255A042 + (17:03:06, 16 March 2025)
- ML20255A038 + (17:03:10, 16 March 2025)
- SECY-20-0093, Enclosure 2 Possible Near-Term Licensing Approaches for Micro-Reactors + (17:03:22, 16 March 2025)
- VR-SECY-18-0106, Consideration in the Rulemaking Process of Issue Raised in Petition for Rulemaking on Applicability of Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Pwr Reactors (PRM-50-110; NRC-2 + (17:03:45, 16 March 2025)
- ASLBP 17-953-02-LA-BD01, Initial Decision (Ruling on the Reformulated Contention) (LBP-20-09) + (17:03:55, 16 March 2025)
- ML20254A293 + (17:04:09, 16 March 2025)
- ML20254A217 + (17:04:16, 16 March 2025)
- ML20254A091 + (17:04:38, 16 March 2025)
- 05000390/LER-2020-003, Control Room Emergency Ventilation System Inoperable Due to Main Control Room Door Being Left Open + (17:04:47, 16 March 2025)
- EPID:L-2019-LLR-0034 + (17:05:24, 16 March 2025)
- ML20253A154 + (17:05:28, 16 March 2025)
- ML20252A248 + (17:05:44, 16 March 2025)
- EPID:L-2020-LLO-0006 + (17:05:50, 16 March 2025)
- ML20252A171 + (17:05:53, 16 March 2025)
- ML20249C845 + (17:06:05, 16 March 2025)
- ML20249C843 + (17:06:07, 16 March 2025)
- ML20249C826 + (17:06:12, 16 March 2025)
- IR 05000482/1998099 + (17:06:16, 16 March 2025)
- TAC:MA1205 + (17:06:50, 16 March 2025)
- ML20249C736 + (17:07:23, 16 March 2025)
- ML20249C733 + (17:07:32, 16 March 2025)
- ML20249C724 + (17:07:37, 16 March 2025)
- ML20249C721 + (17:07:39, 16 March 2025)
- 05000333/LER-1998-005, :on 980529,declared HPCI Inoperable Due to Observed Lower than Normal Output Signal on Flow Controller. Replaced Flow Controller & Declared HPCI Sys Operable on 980530 + (17:07:47, 16 March 2025)
- ML20249C716 + (17:07:56, 16 March 2025)
- IR 05000245/1998207 + (17:09:48, 16 March 2025)
- IR 05000285/1998009 + (17:09:49, 16 March 2025)
- ML20249C685 + (17:09:56, 16 March 2025)
- 05000373/LER-1997-026-01, :on 970715,inadequate Channel Functional Test of Refueling Interlocks Was Discovered.Caused by Procedural Deficiencies.Procedure to Perform Logic Sys Functional Test on Rod Block Logic Will Be Developed + (17:10:03, 16 March 2025)
- 05000306/LER-1998-003-02, :on 980526,discovered Inadequate App R Fire Barriers & Unsealed Fire Barrier Penetrations.Caused by Lack of Adequate Separation of Safe Shutdown Equipment.Firewatch Has Been Established as Compensatory Measure + (17:10:06, 16 March 2025)
- NUREG-0619, Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable + (17:10:09, 16 March 2025)
- IR 07100219/2012024 + (17:10:16, 16 March 2025)
- ML20249C642 + (17:10:28, 16 March 2025)
- ML20249C640 + (17:10:33, 16 March 2025)
- 05000354/LER-1998-004-03, :on 980522,EDG B Declared Inoperable.Caused by Contamination W/Lubrication Oil in Delivered Fuel Oil. EDG Drained,Cleaned,Refilled & Sampled + (17:10:34, 16 March 2025)
- TXX-9815, Forwards Response to Request for Addl Info Re Section 3.6 of Proposed TS Changes in NRC Ltr .Suppl to Ltr to NRC Will Be Provided at Later Date + (17:10:40, 16 March 2025)
- NUREG-1520, Recommends That 980504 Avlis Licensing Process License Application Be One Document W/O Part I/Part II Distinction. Staff Recommended Example of Application & Environ Rept Format,Encl + (17:10:45, 16 March 2025)
- 0CAN069804, Forwards Scenario Package for ANO 1998 Radiological Emergency Preparedness Exercise (REX-98) IAW 60-day pre-exercise Schedule Specified by NRC IP 82302,Exhibit 1. Encl Withheld Until 980819,date of Exercise + (17:10:49, 16 March 2025)