Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069C306 + (16:07:24, 16 December 2024)
- ML20069C292 + (16:07:25, 16 December 2024)
- ML20069C295 + (16:07:25, 16 December 2024)
- ML20069C287 + (16:07:26, 16 December 2024)
- ML20069C288 + (16:07:26, 16 December 2024)
- ML20069C286 + (16:07:27, 16 December 2024)
- 05000369/LER-1982-011-03, /03L-0:on 820120,maint Personnel Working on Spent Fuel Pool Cooling Sys (Kf) Heat Exchanger 1A Discharge Throttle Bypass Relief Valve Discovered That Kf Mechanical Snubber Was Removed Rendering Snubber Inoperable + (16:07:29, 16 December 2024)
- ML20069C281 + (16:07:30, 16 December 2024)
- ML20069C280 + (16:07:33, 16 December 2024)
- ML20069C279 + (16:07:34, 16 December 2024)
- 05000373/LER-1983-011-03, /03L-0:on 830208,during LIS-NB-01,LIS 1B21-NO24B Setpoint Found Out of Tolerance in Nonconservative Direction.Cause Undetermined.Switch Recalibr.Itt Barton Model 288A Trended to Assist in Determining Further Action + (16:07:36, 16 December 2024)
- 05000369/LER-1982-011, Forwards LER 82-011/03L-0 + (16:07:37, 16 December 2024)
- ML20069C269 + (16:07:38, 16 December 2024)
- ML20069C265 + (16:07:44, 16 December 2024)
- 05000373/LER-1983-011, Forwards LER 83-011/03L-0 + (16:07:45, 16 December 2024)
- ML20069C255 + (16:07:45, 16 December 2024)
- ML20069C251 + (16:07:49, 16 December 2024)
- ML20069C250 + (16:07:50, 16 December 2024)
- ML20069C248 + (16:07:52, 16 December 2024)
- 05000254/LER-1983-011-03, /03L-0:on 830225,during Low Condenser Vacuum Calibr & Functional Tests,Pressure Switch PS-1-503A Tripped at 20.9 Inches Hg Vacuum.Caused by Setpoint Drift.Switch Recalibr & Functionally Tested + (16:07:54, 16 December 2024)
- ML20069C241 + (16:07:55, 16 December 2024)
- 05000325/LER-1982-010-03, /03L-0:on 820118,following Power Decrease, Surveillance Requirements for Reactor Coolant Sampling Not Performed.Caused by Personnel Error.Personnel Counseled + (16:07:57, 16 December 2024)
- 05000254/LER-1983-011, Forwards LER 83-011/03L-0 + (16:07:58, 16 December 2024)
- ML20069C230 + (16:07:59, 16 December 2024)
- 05000260/LER-1982-006-03, /03L-0:on 820125,while Performing SI 4.1.A-7,low Water Level Switch LIS-3-203B,switch 1 Found 3% Out of Tolerance.Caused by Setpoint Drift.Switch Recalibr + (16:08:01, 16 December 2024)
- 05000325/LER-1982-010, Forwards LER 82-010/03L-0 + (16:08:03, 16 December 2024)
- ML20069C214 + (16:08:04, 16 December 2024)
- ML20069C216 + (16:08:04, 16 December 2024)
- 05000324/LER-1982-015-03, /03L-0:on 820117,intermediate Range Monitor (IRM) C Declared Inoperable Due to Erratic Indication & IRM E,When on Range 9,indicated Downscale.Caused by Tear in Detector Signal Cable in IRM E & Defective Detector in IRM C + (16:08:06, 16 December 2024)
- 05000260/LER-1982-006, Forwards LER 82-006/03L-0 + (16:08:07, 16 December 2024)
- 05000327/LER-1982-012-03, /03L-0:on 820122,when Divider Barrier Equipment Hatch 3 Was Opened,Seal Gasket Discovered Missing.Probably Caused by Personnel Failure to Verify Gasket Reinstallation on 811016.Gasket Installed.Engineers Reinstructed + (16:08:12, 16 December 2024)
- 05000324/LER-1982-015, Forwards LER 82-015/03L-0 + (16:08:13, 16 December 2024)
- ML20069C194 + (16:08:14, 16 December 2024)
- ML20069C197 + (16:08:14, 16 December 2024)
- 05000327/LER-1982-012, Forwards LER 82-012/03L-0 + (16:08:15, 16 December 2024)
- 05000346/LER-1983-010-03, /03L-0:on 830207,during Performance of Auxiliary Feedwater Sys Channel Functional Test,Isolation Valve MS106A Failed to Close Electrically.Caused by Dirty & Improperly Lubricated Valve Stem.Valve Stem & Drive Nut Cleaned + (16:08:17, 16 December 2024)
- ML20069C181 + (16:08:20, 16 December 2024)
- 05000325/LER-1982-015-03, /03L-0:on 820122,accumulator Low Pressure/High Level Annunciator Received for Hydraulic Control Unit to Control Rod 38-47.Caused by Failed Open Switch Contacts in Switch C11-LDSH-129 & Switch C11-PDL-130 Out of Calibr + (16:08:21, 16 December 2024)
- 05000325/LER-1982-015, Forwards LER 82-015/03L-0 + (16:08:22, 16 December 2024)
- ML20069C160 + (16:08:23, 16 December 2024)
- 05000346/LER-1983-010, Forwards LER 83-010/03L-0 + (16:08:24, 16 December 2024)
- ML20069C159 + (16:08:24, 16 December 2024)
- ML20069C155 + (16:08:25, 16 December 2024)
- ML20069C154 + (16:08:25, 16 December 2024)
- ML20069C153 + (16:08:26, 16 December 2024)
- 05000321/LER-1994-005-01, :on 940501,unplanned ESF Sys Actuations Occurred Due to Loose Connections in Power Distribution Panel.Loose Connections Checked & Tightened + (16:08:28, 16 December 2024)
- ML20069C151 + (16:08:29, 16 December 2024)
- ML20069C145 + (16:08:32, 16 December 2024)
- ML20069C143 + (16:08:33, 16 December 2024)
- ML20069C139 + (16:08:34, 16 December 2024)
- ML20069C136 + (16:08:35, 16 December 2024)