Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071E445 + (11:46:51, 15 December 2024)
- ML20071E442 + (11:46:52, 15 December 2024)
- JAFP-83-0263, Forwards Monthly Operating Rept for Feb 1983 + (11:46:53, 15 December 2024)
- ML20071E435 + (11:46:53, 15 December 2024)
- ML20071E426 + (11:46:54, 15 December 2024)
- ML20071E428 + (11:46:54, 15 December 2024)
- ML20071E422 + (11:46:55, 15 December 2024)
- ML20071E424 + (11:46:55, 15 December 2024)
- ML20071E421 + (11:46:56, 15 December 2024)
- ML20071E417 + (11:46:57, 15 December 2024)
- 05000338/LER-1983-007-03, /03L-0:on 830202,during Mode 5,high Head Safety Injection Throttle Valve Found Out of Alignment by 7/8 of Turn.Caused by Miscount of Valve Handle Turns During Type C 821109 Test or 821108 Valve Verification Procedure + (11:46:59, 15 December 2024)
- ML20071E406 + (11:47:00, 15 December 2024)
- ML20071E402 + (11:47:00, 15 December 2024)
- ML20071E400 + (11:47:02, 15 December 2024)
- ML20071E401 + (11:47:02, 15 December 2024)
- ML20071E398 + (11:47:03, 15 December 2024)
- ML20071E397 + (11:47:03, 15 December 2024)
- 05000338/LER-1983-007, Forwards LER 83-007/03L-0 + (11:47:04, 15 December 2024)
- ML20071E390 + (11:47:05, 15 December 2024)
- 05000321/LER-1983-017-03, /03L-0:on 830128,insp of Secondary Containment Walls Revealed Breached Fire Barrier in 164 Ft Elevation Reactor Bldg Airlock.Caused by Design Change Which Did Not Provide for Sealing of Fire Barrier Penetrations + (11:47:06, 15 December 2024)
- ML20071E385 + (11:47:07, 15 December 2024)
- ML20071E383 + (11:47:08, 15 December 2024)
- LD-83-019, Forwards Amended CESSAR-F Section 15.3.3, Single Reactor Coolant Pump Rotor Seizure W/Loss of Offsite Power, in Response to NRC 820115 Request & SER Comfirmatory Item 16 + (11:47:09, 15 December 2024)
- L-83-128, Informs That Discussion Topics for Evaluation of Control Room Habitability Per post-TMI Requirements Expected by 830831.Completion of Mods Expected by 830701 + (11:47:10, 15 December 2024)
- ML20071E378 + (11:47:10, 15 December 2024)
- ML20071E375 + (11:47:11, 15 December 2024)
- 05000321/LER-1983-017, Forwards LER 83-017/03L-0 + (11:47:12, 15 December 2024)
- ML20071E370 + (11:47:12, 15 December 2024)
- ML20071E369 + (11:47:13, 15 December 2024)
- ML20071E366 + (11:47:14, 15 December 2024)
- ML20071E364 + (11:47:15, 15 December 2024)
- ML20071E365 + (11:47:15, 15 December 2024)
- ML20071E356 + (11:47:16, 15 December 2024)
- ML20071E359 + (11:47:16, 15 December 2024)
- ML20071E350 + (11:47:17, 15 December 2024)
- ML20071E355 + (11:47:17, 15 December 2024)
- 05000317/LER-1983-010-03, /03L-0:on 830127,boric Acid Storage Tank 11 Rendered Inoperable Due to High Boron Concentration.Caused by Inadequate Procedures.Procedures Modified & Chemistry Technicians Informed + (11:47:19, 15 December 2024)
- ML20071E341 + (11:47:21, 15 December 2024)
- ML20071E342 + (11:47:21, 15 December 2024)
- 05000259/LER-1983-009, Forwards LER 83-009/01T-0 + (11:47:22, 15 December 2024)
- ML20071E336 + (11:47:22, 15 December 2024)
- 05000280/LER-1983-009-03, /03L-0:on 830204,during 85% power,PT-2.26 Revealed That MOV-1535 & MOV-1536 Would Not Fully Cycle.Cause Undetermined.Valves Will Be Inspected During Current Outage + (11:47:24, 15 December 2024)
- 05000317/LER-1983-010, Forwards LER 83-010/03L-0 + (11:47:25, 15 December 2024)
- ML20071E323 + (11:47:26, 15 December 2024)
- ML20071E314 + (11:47:27, 15 December 2024)
- RBG-14-530, Forwards Rev 3 to Training & Qualification Plan.Rev Withheld (Ref 10CFR2.790).Affidavit Encl + (11:47:27, 15 December 2024)
- 05000280/LER-1983-008-03, /03L-0:on 830204,during 85% Power,Results of PT-2.26 Indicated That PCV-1455C Would Not Cycle.Caused by Apparent Valve Binding.Valve Will Be Inspected & Repaired as Necessary During Current Outage + (11:47:29, 15 December 2024)
- JAFP-83-0189, Responds to NRC Re Violations Noted in IE Insp Rept 50-333/82-28.Corrective Actions:Component Disassembled, Welding & QC Insp Performed & Documented & Work Procedures Revised + (11:47:30, 15 December 2024)
- ML20071E311 + (11:47:30, 15 December 2024)
- ML20071E287 + (11:47:31, 15 December 2024)
- ML20071E274 + (11:47:32, 15 December 2024)
- 05000280/LER-1983-007-03, /03L-0:on 830204,at 85% Power,Latch Mechanism of Fire Door 20 Taped Over,Causing Fire Barrier to Be Inoperable.Caused by Const Personnel Error.Tape Removed & Door Returned to Operable Status + (11:47:34, 15 December 2024)