Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases 1999-10-01
[Table view] Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC
MONTHYEARML20245D9851989-06-22022 June 1989 Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also Prepared ML20245C7071989-06-16016 June 1989 Urges Intervention of NRC to Block Application to Transfer License from Lilco to State of Ny for Decommissioning & Dismantling of Plant.Plant Should Not Be Destroyed as Provided in Deal W/State of Ny ML20247P9411989-05-17017 May 1989 FOIA Request for Final Open Item Transmittal Ltrs Per NRC Insp Procedure 94300B for Listed Plants ML20196E7141988-01-18018 January 1988 FOIA Request for Documents on Problems at Plant During 1987 Re Insp Item 322/82-30-03 or Safety Problems Prompting Review of E Brabazon to Wj Museler ML20147G1091988-01-18018 January 1988 FOIA Request for Documents Re 830125 Meeting at Plant W/Nrc, Util,S&W & Others ML20147G0741988-01-18018 January 1988 FOIA Request for All Documents Re NRC Investigation of Wg Dick Allegations About S&W & Lilco Re Performing NRC Instructions to Bring Facility Up to Fuel Load Stds ML20235A1251987-12-16016 December 1987 Forwards Info Re Resource Technical Svcs,Inc,Including Summary of NRC Contract Work,Nrc Form 26 for Three Existing Contracts,Audit Info,Work History & Lists of Expertise Available for Special Insps & of Current Resource Svcs ML20196K2671987-12-14014 December 1987 FOIA Request for Documents Re 830218 Meeting at Plant W/Nrc Representatives,Util S&W Engineering & Others ML20147B2111987-12-14014 December 1987 FOIA Request for Documents Re Vendor Lists for Facility as Compiled by Util Contractors Between 1975 & 1978,including Documentation Re Use of E-BRITE ML20236U5221987-10-19019 October 1987 FOIA Request for LERs for Listed Plants,Including All Attachments & Encls from Original Documents ML20235V1321987-08-28028 August 1987 Forwards EGG-NTA-7471, Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28.... Based on Licensee Responses,Plants Reviewed Conform W/Exceptions Listed in Section 14 ML20235G5131987-08-20020 August 1987 FOIA Request for Div of Reactor Licensing 691124 Rept to ACRS Re CP Review of Util Facility,Prepared for Use at ACRS 116th Meeting on 691111-13 ML20237K1961987-08-0505 August 1987 FOIA Request for Documents Re Sser Filed W/Nrc by Lilco Between 830203 & 0630 ML20236N9821987-07-28028 July 1987 Forwards Corrected Page 371 to 870310 Transcript Re Emergency Planning Exercise ML20237K1851987-07-22022 July 1987 FOIA Request for Documents Re Seismic Qualifications of Facility Between 830218 & 0630 ML20236E7061987-07-21021 July 1987 Requests That Encl E Lieberman,Of Kld Assoc, to K Christman,Of Hunton & Williams,Be Attached to Original 870623 Deposition of E Lieberman in Hauppauge,Ny.Related Correspondence ML20235Y1171987-06-29029 June 1987 FOIA Request for Documents Re Safety Insp Rept 50-322/83-11 on 830405-16 ML20237G6121987-06-29029 June 1987 FOIA Request for Documents Re 830218 Meeting W/Nrc,Lilco & S&W at Facility ML20235J6061987-06-10010 June 1987 FOIA Request for Documents Re 830218 Meeting of Nrc,Lilco & S&W Engineering Concerning Findings of NRC Readiness Assessment Team Insp of Plant in Jan 1983 ML20235D5351987-05-12012 May 1987 FOIA Request for All Util,S&W & NRC Documents Re Category Ii,Seismic I,safety-related Components & Structures at Plant for 830115-0630 ML20234B6211987-05-12012 May 1987 Requests That Listed Plants Be Added to Encl 870508 FOIA Request Re 94300 Region Input on Plant Readiness ML20234B6571987-05-0808 May 1987 FOIA Request for Placement,In Pdr,Region Input to NRC Headquarters,Nrr Re Status of Listed Plants in Terms of Plant Readiness for OL IE Manual,Chapter 94300 ML20214R4051987-05-0808 May 1987 FOIA Request for Region Input to NRR Re Status of Listed Plants Readiness for Ol,Per IE Manual Chapter 94300 ML20215H6371987-04-17017 April 1987 Forwards Pages 2,250-2,252 of Transcript for 870331 Hearing & Pages 2,252.1-2,252.3 of Transcript of 870401 Hearing ML20213D8991986-11-0404 November 1986 Forwards Corrected Cover,Title & Index Pages for Transcript of 860926 Limited Appearance Statement ML20195C5951986-03-14014 March 1986 FOIA Request for Structural Integrity Test Repts for Shoreham,Limerick-1,Nine Mile Point-2 & Susquehanna ML20141N2961985-11-22022 November 1985 FOIA Request for Two Categories of Documents Re Facility PRA & Source Term Code Package Per BMI-2104/NUREG-0956 ML20137A6851985-09-27027 September 1985 FOIA Request for Summaries & Evaluations of LERs from Fuel Loading to Declaration of Commercial Operation for Listed Nuclear Power Plants ML20128E7461985-05-21021 May 1985 Forwards Addl & Replacement Pages to Transcript of 841101 Proceeding & Addl Pages to Transcripts of 841102 & 15 Proceedings ML20129A4091985-03-30030 March 1985 FOIA Request for Info on Results of Concrete Cylinder Tests & Concrete Test Borings Made During Plant Const ML20107M5291985-02-27027 February 1985 Forwards Page 26,422.11,omitted from Transcript of 841113 Meeting Covering Crack Propagation ML20099L9931984-11-28028 November 1984 Forwards Corrected Pages to Transcript of 841116 Proceeding ML20099M1811984-11-13013 November 1984 Forwards Corrected Pages for Transcripts of 840910,11,18,19, 26 & 1002,02,03 & 04 Hearings in Hauppauge,Ny ML20094B0681984-11-0101 November 1984 Forwards Corrected Transcript for 840919 Proceeding & Corrected Pages for 840924 & 25 Proceedings.W/O Corrected Transcript for 840919 Proceeding ML20093P0161984-10-30030 October 1984 Forwards Corrected Transcript of 840910-18 Hearings.Only 840910 Transcript Encl ML20094B3651984-10-25025 October 1984 Forwards Rev 1 to Transcript of 841022 Hearing in Hauppauge, Ny,Consisting of Replacement Pages to Be Inserted Into Original Transcript ML20106D3661984-10-19019 October 1984 Forwards Corrected Transcript of 840920 Hearing ML20096F9171984-09-0606 September 1984 Forwards Transcripts of Ja Scalice & EP Stergakos 840824 Depositions in Hauppauge,Ny.Related Correspondence ML20094N0591984-06-26026 June 1984 Forwards Applicant Exhibits 38-47 from 840605-08 Hearings. Related Correspondence ML20094N1961984-06-26026 June 1984 Forwards Intervenor Exhibits 67-74.Related Correspondence ML20094N2121984-06-15015 June 1984 Forwards NRC Staff Exhibit 1 from 840424 Hearing.Related Correspondence ML20084P6481984-05-0808 May 1984 Forwards Suffolk County Exhibit EP22A-G Received on 840425 & New York State Exhibit EP8A-E Received on 840501.Related Correspondence ML20087Q0591984-03-0606 March 1984 Forwards Applicant Exhibits 10 & 11 of Hearing Record on 840223.Related Correspondence ML20085D8881983-07-26026 July 1983 Forwards Books 1-3 of Independent Design Review for Shoreham Nuclear Power Station, Final Technical Rept ML20072P0341983-07-12012 July 1983 Forwards Test Review,Data Analysis & Review of Emergency Diesel Generator Operational/Reliability Problems at Shoreham,Unit 1, Final Rept.Rept Incorporates NRC Comments Provided at 830629 Meeting at Region I Ofcs ML20072J9371983-06-30030 June 1983 Forwards Executive Summary of Final Rept, Independent Design Review for Shoreham Nuclear Power Station. Final Rept Will Be Submitted by 830731 ML20072K0101983-06-29029 June 1983 Forwards Rev 1 to Independent Design Review,Shoreham Nuclear Power Plant. Final Classification of Listed Items Included ML20079Q9771983-06-17017 June 1983 Forwards Matl Presented at Anderson,Greenwood & Co (Agco) Vacuum Breaker Test Program Owners Group 830607 Meeting W/ NRC Re Dynamic Testing & Analysis of Agco Vacuum Breaker Valve Assemblies ML20071J4391983-05-20020 May 1983 Forwards Final Classification of ICR 5633-18 Re Pipe Support Design Calculations from Independent Design Review.Item Closed ML20071G7041983-05-0606 May 1983 Forwards Minutes of 830421 Meeting W/Util & S&W Re Clarification of Addl Items in Independent Design Review 1989-06-22
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20112E8911996-05-24024 May 1996 FOIA Request to Inspect & Copy Original OL Issued by Aec/Nrc for Util & EPP Issued as App B to Plant OL SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank1995-05-15015 May 1995 Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank ML20082B9131995-03-13013 March 1995 Submits Corrected Page for Insertion Into Final Rept Re Confirmatory Survey of RB & Phase 4 Systems at Plant ML20081A9321995-03-0707 March 1995 Forwards Final Rept Orise 95/B-81, Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6531995-03-0707 March 1995 Forwards Final Rept Orise 95/B-80, Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081B5801995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys Shoreham Nuclear Power Station Brookhaven,Ny ML20081A6841995-02-21021 February 1995 Forwards Final Rept Confirmatory Survey of Radwaste Bldg, Suppression Pool,Phase 2 & Phase 3 Sys,Shoreham Nuclear Power Station,Brookhaven,Ny ML20081A7111995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Reactor Bldg & Phase 4 Sys,Shoreham Nuclear Power Station, Brookhaven,Ny ML20081A7001995-01-30030 January 1995 Forwards Rev 1 to Draft Rept Confirmatory Survey of Radwaste Bldg,Suppression Pool,Phase 2 & Phase 3 Sys, Shoreham Nuclear Power Station,Brookhaven,Ny SNRC-2188, Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey1995-01-20020 January 1995 Responds to NRC Request for Addl Info Re Certain Elevated Levels Found During Phase 4 Confirmatory Survey SNRC-2189, Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 19941995-01-20020 January 1995 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program,Annual Radiological Environ Operating Rept, Jan-June 1994 SNRC-2187, Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring1995-01-11011 January 1995 Forwards Snps Annual Man-Rem Rept, Including Individuals for Whom Personnel Monitoring Provided During CY94,per 10CFR20.407(a) & (B).Rept Also Includes Individuals Identified in 10CFR20.202(a),who Require Monioring SNRC-2182, Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning1994-11-0101 November 1994 Forwards Final Annual Radioactive Effluent Release Rept for Cy 1994, Including Last Revised Copies of ODCM & Pcp.Rept Prepared for Closeout Purposes as Part of Completion of Plant Decommissioning ML20077L3331994-10-25025 October 1994 Forwards Revised Proposed Confirmatory Survey Plan for Reactor Bldg Shoreham Nuclear Power Station Brookhaven,Ny ML20077M8351994-10-20020 October 1994 Forwards Draft Rept, Confirmatory Survey of Radwaste Bldg, Suppression Pool & Phase 2 Systems,Shoreham Nuclear Power Station,Brookhaven,Ny ML20076K3881994-10-20020 October 1994 Forwards Proposed Confirmatory Survey Plan for Reactor Bldg, Shoreham Nuclear Power Station,Brookhaven,Ny,For Review & Comment SNRC-2184, Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld1994-10-12012 October 1994 Forwards Shoreham Decommissioning Project Termination Survey Final Rept Phase 4. Portions Withheld SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-10-0404 October 1994 Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20076F9251994-09-26026 September 1994 Forwards Final Rept Orise 94/I-80, Confirmatory Survey of Turbine Bldg,Site Grounds & Site Exteriors Shoreham Nuclear Power Station Brookhaven,Ny SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-871994-09-23023 September 1994 Forwards Amend 6 to Indemnity Agreement B-87 SNRC-2181, Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 11994-09-14014 September 1994 Notifies of Equipment Changes to Shoreham Facility Which Have Occurred Subsequent to Rept on Phase I Final Survey Status,Provided in Util .Equipment Changes Described in Encl Table 1 SNRC-2180, Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-021994-09-0101 September 1994 Forwards 940829 Memo Entitled, Technical Evaluation of Dusting from Concrete Blocks, Addressing Issue Discussed in Insp Rept 50-332/94-02 SNRC-2179, Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl1994-09-0101 September 1994 Proposes That Release Criterion for Soil Be Applied to Certain Other Bulk Matls Which Will Remain at Plant Upon Completion of Decommissioning.Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl ML20072P1591994-08-17017 August 1994 Forwards Revised, Confirmatory Survey Plan for Radwaste Bldg & Suppression Pool for Plant SNRC-2178, Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4))1994-08-17017 August 1994 Forwards Proprietary Response to NRC Concerns Re Survey Instruments Used for Termination Survey.Extensive Discussion Provided in Interest of Rapidly Bringing Outstanding Concerns to Close.Response Withheld (Ref 10CFR2.790(a)(4)) SNRC-2176, Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-821994-08-0404 August 1994 Informs of near-term Completion of Decommissioning of Shoreham Nuclear Power Station & Hereby Respectfully Requests Support in Achieving Timely Termination of Facility possession-only License NPF-82 SNRC-2177, Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld1994-08-0404 August 1994 Forwards Rev 3 to Shoreham Decommissioning Project Termination Survey Plan. Portions of Rept Withheld ML20071L8741994-07-29029 July 1994 Forwards Confirmatory Survey Plan for Radwaste Building & Suppression Pool for Review & Comment SNRC-2175, Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively1994-07-18018 July 1994 Provides Notification of Survey Location Changes to Shoreham Facility Which Have Occurred Subsequent to Repts on Phases 1,2 & 3 Final Survey Status Provided in Refs 1,2 & 3 Respectively SNRC-2173, Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790)1994-06-14014 June 1994 Forwards Termination Survey Final Rept Phase 3. Proprietary Pages to Rept Also Encl.Proprietary Pages Withheld (Ref 10CFR2.790) SNRC-2172, Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-821994-06-0707 June 1994 Certifies That All SNM as Irradiated Fuel Permanently Removed from Site & That Decommissioning/Decontamination Work on Biological Shield Wall Complete,In Accordance W/Nrc Approving Amend 11 to Pol NPF-82 SNRC-2171, Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel1994-06-0202 June 1994 Submits Resolution of Items Identified by NRC Region I Project Inspector,Pertaining to Planned Final Draindown & Discharge of Spent Fuel Storage Pool,Following Complete Removal of Irradiated Fuel SNRC-2170, Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan1994-05-20020 May 1994 Requests Approval of Proposed Change to Shoreham Decommissioning Plan for Addl Remedial Decontamination of Shoreham Spent Fuel Storage Pool Beyond That Originally Specified in Decommissioning Plan SNRC-2168, Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc1994-05-13013 May 1994 Notification to NRC of Transfer of Device Containing 30 Uci Cs-137 Source.Device Transferred to JW Merkel,Terra Analytics,Inc SNRC-2169, Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project1994-05-11011 May 1994 Advises of Listed Clarification to Util Re Resignation of Jc Brons from Position of Executive Vice President of Shoreham Decommissioning Project ML20029E1731994-05-11011 May 1994 Informs That Based on Recent Discussions Between Officials, Licensee Decided to Retain Organizational Position at Least Until Fuel Removed from Site ML20029D1991994-04-29029 April 1994 Forwards Shoreham Nuclear Power Station Radiological Environ Monitoring Program Annual Radiological Environ Operating Rept Jan-Dec 1993. ML20029D2571994-04-28028 April 1994 Advises That Jc Brons Resigned to Pursue Employment W/ Another Util Co,Effective 940429 ML20029C7111994-04-22022 April 1994 Submits Technical Info on Biological Shield Wall Blocks to Be Surveyed SNRC-2163, Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util1994-04-21021 April 1994 Provides Notification of Equipment Changes to Facility Which Have Occurred Subsequent to Report on Phase I Final Survey Status Provided in Util ML20065M3701994-04-20020 April 1994 Responds to NRC Verbal Request for Info Re Estimated Cost for Decommissioning SNRC-2160, Forwards Financial Info Required by 10CFR50.71(b)1994-03-30030 March 1994 Forwards Financial Info Required by 10CFR50.71(b) SNRC-2161, Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station1994-03-30030 March 1994 Forwards 1994 Internal Cash Flow Projection for Shoreham Nuclear Power Station SNRC-2148, Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases1994-03-0808 March 1994 Forwards Info Supporting Licensee Proposed Amend,Submitted on 941104.Specifically,info Supports Estimates & Conclusions Re Small Quantity of Remaining Radioactive Matl & Low Radiological Significance of Potential Accident Releases SNRC-2145, Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination1994-03-0808 March 1994 Provides Comments Prepared by Util on Draft NUREG/CR-5849, Manual for Conducting Radiological Surveys in Support of License Termination SNRC-2157, Forwards 1993 Rept of Personnel & Man-Rem by Work & Job Function. 1993 Personnel Exposures Extremely Low as Majority of Radioactivity Removed from Site1994-02-28028 February 1994 Forwards 1993 Rept of Personnel & Man-Rem by Work & Job Function. 1993 Personnel Exposures Extremely Low as Majority of Radioactivity Removed from Site SNRC-2158, Submits Notification of Pending Change to Decommissioning Plan Submitted 901229.Safety Evaluation for Change Encl1994-02-28028 February 1994 Submits Notification of Pending Change to Decommissioning Plan Submitted 901229.Safety Evaluation for Change Encl SNRC-2156, Forwards Annual Radioactive Effluent Release Rept for 1993. Latest Revised Copies of Offsite Dose Calculation Manual & Process Control Program Also Encl as Apps to Rept1994-02-25025 February 1994 Forwards Annual Radioactive Effluent Release Rept for 1993. Latest Revised Copies of Offsite Dose Calculation Manual & Process Control Program Also Encl as Apps to Rept ML20067C9271994-02-22022 February 1994 Forwards Fitness for Duty Program Performance Data for Period of Jul-Dec 1993 SNRC-2144, Forwards Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept. Twenty Proprietary Pages of Rept Withheld (Ref 10CFR2.790)1994-02-0404 February 1994 Forwards Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept. Twenty Proprietary Pages of Rept Withheld (Ref 10CFR2.790) 1996-05-24
[Table view] |
Text
1
'RTELEDYNE ENGNEERING SERVICES 130 SECOND AVENUE WALTH AM, M ASSACHUSETTS 02254
)
(617) 8%3350 TWX (710) 324-7580 March 11, 1983 5633-51 6 0-322 Mr. Harold Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20114
Subject:
Independent Design Review for the Shoreham Nuclear Power Station
Dear Mr. Denton:
Please find enclosed the latest classification of items from the subject design review.
TES has received responses from LILC0 to items originally classified as Findings and the results of our review of these responses is enclosed.
With respect to the classification of Additional Concern, we expect a further response from LILC0 to such items prior to a final TES classification.
If you have any questions or comments, please do not hesitate to contact Mr. James P. King or the writer.
Very truly yours, TELEDYNE ENGINEERING SERVICES 044dM Donald F. Landers Senior Vice-President DFL/lh Enclosures cc: J. A. Flaherty (TES)
J. P. King (TES)
J. H. Malonson (TES)
TES Document Control h$h3b0 A
00 l ENGINEERS AND METALLURGISTS
5 ,
@ Tr nsmitt:1 - Please Sign and Return Acknowledgement TN O Request for Information (RFI) g When Requested Assign Control Number Page._I_.o f I O Receipt (TES use Only) Control No.
Originator D. F. Landers Transmit To: H. R. Denton Project No. 5633 USNRC Date 3/11/83 7920 Norfolk Ave.
Client PO 363981 Bethesda, MD 20112 Transmitted Under Separate Cover To: M. Milligan (LILC0)
NOTE: Furnish complete identification for items transmitted (below).
O O
QTY TYPE ITEM IDENT NO. REV DESCRIPTION - Title and Number of Sheets /Paaes N 6 ICR 5633-2 6 ICR 5633-9 6 ICR 5633-13 6 ICR 5633-14 6 ICR 5633-15 6 ICR 5633-17 6 ICR 5633-18 6 ICR 5633-20 6 ICR 5633-21 ACKNOWLEDGEMENT OF RECEIPT BY TITLE DATE DISPOSITION FOR PREVIOUS REVISIONS O Return to TES O Mark Void ODestroy O Uncontrolled NOTE _T_O ADDRE_SSEE: Unless stated otherwise the listed items are furnished to you as Controlled Documents. Please sign and return the number 2 copy to:
TELEDYNE ENGINEERING SERVICES 130 Second Avenue Waltham, Massachusetts 02254 Attention: Document Control, Project 5633 OISTRil3UTION: I and 2-Addressee 3-Document Control 4-Originator / Project Manager 4/81
' 'A'TELEDYNE ENGINEERING SERVICES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTROLLED DOCUMENT ICR NO.
5633 21 RRF No. 5633 40, Rev. I Date: 3/10/83
Reference:
PMR No. 5633 40, Rev.1 Classification of Item: Additional Concern h
RdviewerSignature
~G i .h n bh CommitteeChairmanSignadre
.E 6 dss Project Manager Signature 1
1
"RTA FrT(NE ICR No. 5633-21
1.0 INTRODUCTION
TES issued ICR-5633-21 on January 6, 1983 which was a Finding against the SWEC design process with respect to data extraction and comparison to allowable values for the dynamic qualification of motor operated valves. A disposition response froia LILC0 and SWEC was received by TES on February 17, 1983. This response indicate the following:
(1) The TES Finding had an erroneous valve identification.
(2) The updating of SWEC SQRT (Equipment Dynamic Qualification) documentation is a continuous process to reflect revisions to AX's (SWEC pipe stress analysis packages).
(3) SWEC SQRT documentation typically addresses a group of similar valves for which the largest bounding acceleration values are considered.
(4) SWEC uoes not transform global coordinate system accelerations into the valve's local coordinate system.
(5) Tne Shoreham basis for combining peak values of uncorrelated dynamic event is SRSS rather than absolute sum method.
(6) A summary status of each valve indicated in the TES Finding.
Discussion of the SWEC and LILC0 dis?osition response is presented in an examination of each of the above items in the following sections.
l l
"MTF1 FnYNE ICR No. 5633-21 2.0 CONCURRENCE WITH DISPOSITION RESPONSE TES concurs with disposition response items 1, 2, 3 and 5. A review of each of these disposition response statements follows:
(1) TES acknowledges SWEC's c.orrection made to proper valve identification. It is indeed IE41*M0V-031, not IE21*MOV-0318, that is represented by Nodes 88 and 89 in AX-11A.
(2) TES agrees that there is a time consideration with respect to the updating of the SQRT documentation to reflect revisions to the AX packages.
(3) TES agrees with SWEC's design process of enveloping maximum accelerations for a group of similar valves.
(5) TES also concurs with the Shoreham basis for combining peak values of uncorrelated dynamic event by SRSS rather than absolute sum.
3.0 NONCONCURRENCE WITH DISPOSITION RESPONSE TES is in disagreement with disposition response items 6 and 4. A review of each of these disposition response statements follows:
(6) The disposition response summary status in IE41*M0V-031 indicates that the SWEC calculated acceleration of (10.4 g) exceeds the test qualification level of (10.0 g) and that a more refined SWEC analysis is ongoing to address this high acceleration level. It is the concern of TES that the (10.4 g) calculated acceleration level is not the most severe condition and is not justifiably used in comparison to the (10.0 g) allowable. This concern is examined in greater detail in the review of item 4.
8 ICR No. 5633-21 (4) Review of SWEC SQRT 88AD forms indicate that dynamic qualification of the valve operator is performed by single axis testing. Thus, allowable acceleration values reported in the valves local coordinate system are the result of three independent tests. Since seismic vibratory motion seen by the valve is a simultaneous combination of three directions, calculated individual components of acceleration must be considered when acting in combination. Since individual local coordinate system allowables are known, it is appropriate to consider the interaction of global accelerations resolved upon the local axes when making the dynamic evaluation of the valve body and operator. Therefore, field orientation is critical to the acceptability of each valve. For valves field orientated normal to the global coordinate system, the SWEC method of comparison of the largest individual component of
, global acceleration vs. each of the three local coordinate system allowables is appropriate. Valves field orientated skewed to the global coordinate system should be examined on an individual basis since the determination of applied accelerations applied along the local valve coordinate system axes are dependent upon (1) the magnitude of the individual global accelerations, and (2) the angle at which the valve is orientated.
4.0 REC 0f0ENDATION It is recomended that all motor operated valves be reviewed to determine worst case applied accelerations per the preceding guidelines.
This new data should be reported in revised SQRT documentation for comparison to vendor tested allowables.
To e.pedite the analysis, an SRSS of the two horizontal global components of acceleration vs. each of the two horizontal local components individually is conservative.
i "RTELEDYNE ENGINEERING SERVICES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTROLLED DOCUMENT ICR N0.
5633- 20
Reference:
RRF No. 5633 35 Date: 3/10/83 PMR No. 5633- 35 Final Classification of Item: Closed af E &n Reviewer Signature
%. 0.9AM '
Committee Chairmd Signature l
. T45 Project Manager Signature 1
i 1
l
- "RTF1 prVNE ICR No. 5633-20 1.0 SIMtARY During the initial review of pipe stress package AX-100-2 the TES reviewer generated RRF 5633-35, Rev. 1. This RRF indicated that the
, worksketch and NUPIPE computer run R1649W22 (May 27, 1982) had modeled a tie-back (PSA 5205) from 3" line. (3WR-26-151-2) Node 67 to 3/4" line (3/4 WR-119-301-2-1) Node 327.
However, this tie-back was not shown on the as-built isometric IC-66 and, from information gathered during the TES initial field walk-down of June 14 to 18,1982, it was determined that the small bore tie-back PSA-5205 was not installed. On September 3,1982 a subsequent field survey indicated the support was still missing.
As a result of RRF 5633-35, Rev. 1, a Finding, ICR No. 5C33-20 was issued on January 11, 1983.
The LILC0/SWEC response to ICR No. 5633-20 indicates the following:
(1) The apparent discrepancy involved a design change that was in the process at the time of the TES field walk-downs.
(2) The SWEC analyst determined the need for the tie-back by evaluating the NUPIPE output R1649W22 (May 27, 1982)
(3) On June 8,1982 the need for the tie-back was transmitted to the SWEC pipe support design personnel by interoffice corre-spondence PCA No. 50.
l (4) On June 9, 1982 the SWEC pipe support design personnel acknowledged that the tie-back would be installed; and this was subsequently included in E&DCR F-39716, by which the design is issued to construction for installation.
l
, '#PTF1 FTVNE ICR No. 5633-20 -2 (5) Installation was completed Novemoer 30, 1982. SWEC Field Quality Control verified completion of the installation on December 15, 1982.
Revisions of the SWEC large bore isometric IC-66 and applicable small bore isometric P-1034-1 were received by TES on February 17,.1983.
TES reviewers acknowledged the installation of the tieback during a field survey on February 16, 1983.
Based on the above additional information supplied by SWEC and the TES field survey of February 16, 1983, TES reviewer is satisfied with the SWEC response to ICR No. 5633-20 and therefore this item can be closed.
SPTELEDYNE ENGINEERING SERVICES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTROLLED D0cjMENT ICR N0.
5633- 18
Reference:
RRF No. 5633 65, Rev. 1 Date: 3/10/83 PMR No. 5633- 65, Rev. 1 Classification of Item: Additional Concern fd-[eviewerSignature D: /...
. A CommitteeChairmhSignature f
Y.wOAAktLS Project Manager Signature l
' '#TF1 FnYNE ENGINEERING SERVICES ICR No. 5633-18 -1_
1.0 INTRODUCTION
TES issued ICR No. 5633-18 on December 8, 1982 which was a Finding on the improper combination of loads in that the time-history load was not included as part of the " Upset" design load. A response was received from LILCO and SWEC on February 2, 1983. This response indicated that although the time-history load was not included in the Normal / Upset design load summary, a conservative " umbrella" load combination was used, and resulting stresses were compared to the normal condition (lowest) allowables. TES agrees with this response for the particular support in question, IE21-PSR-020-4. As a result of this response, TES performed a review of the method of load combination for each support, with particular attention to how the time-history loads were considered.
2.0 REVIEW 0F " TIME-HISTORY" LOAD COMBINATIONS In reviewing the method of load combination, it was noted that two time-history cases are reported: one case being Normal, Upset and Faulted (NU/F) and the other Faulted (F). Depending on the particular piping stress model, these are denoted as Case 16 (F) " Injection Flow Pump Start," and Case 17 (NU/F) - Rapid Pump Start /Stop, or Case 34 (NU/F) - " Core Spray Pump Start-Up" and Case 35 (F) " Core Spray Pump Start-Up". Out of approximately 21 rigid supports and snubbers, nine supports had N/U design loads calculated incorrectly in that the N/U
" time-history" load was not included. These are PSR-009, PSST-017, PSR-020, PSST-063, PSR-002, PSR-004, PSR-049, PSR-001 and PSR-050. In addition, four anchors: PSA-023, PSA-024, PSA-059 and PSA-007 also had incorrectly calculated N/U design loads. This represents all of the anchors which TES received to review. The " umbrella load combination" procedure was not used in each of these calculations. In some cases, Normal, Upset, Emergency and Faulted load combinations were used with their respective allowables. The magnitude of the missing time-history 1
l l
ICR No. 5633-18 a loads were relatively small in most cases so that the support designs would probably still be adequate. Also, the fact that the time-history loads are combined by SRSS with SRV and OBE loads diminishes their impact on the total load.
3.0 RECO M NDATION TES found that more than 50% of the snubbers, rigid supports and anchors reviewed did not consider time-history loads properly in the N/U design load combination. In some cases, the " umbrella load" procedure was not used, so specific loads and allowables were used in evaluating the support. It is noted that the magnitude of the missing loads are such that the adequacy of the supports will probably not be effected.
However, this high percentage of supports with incorrectly-calculated loads warrants further attention. It appears that support analysts were not adequately instructed in loads calculation procedures. TES recommends that all piping systems with time-history load cases be reviewed to determined if the loads were correctly considered in the support calculations.
I l
l l
l
\
r _ _ . . _ -
~
"RTELEDYNE ENGINEERING SERVCES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTROLLED DOCUMENT ICR NO.
5633- 17
Reference:
RRF No. 5633-51,52,56 Date: 3/4/83 PMR No. 5633-51,S2,56 Final Classification of Item: Closed ms deviewerSignature i h*'Y ommitteeChairman(nature
. ~. 94.5 Project Manager Signature
WM ENGNEERNG SERVICES ICR No. 5633-17 1.0 SUN 4ARY This item was classified as a Finding because of concern for the lack of control of the interface between revisions to drawings and associated analyses which verify acceptance of the dhwing revisions.
Three RRFs and PMRs were generated addressing this issue and ICR-5633-17 was issued December 8, 1982.
The SWEC response to this ICR stated that it is not uncommon to find a drawing of a later or earlier revision than the corresponding calculation. However, according to SWEC, the current drawing revision will always be supported by the current calculation revision. This was the case for the three pipe supports in question, although SWEC admittedly sent TES the wrong drawing revision for PSSH-003.
In TES's opinion, this response did not adequately address the issue, since it was not clear how the changes required by a calculation were insured to be incorporated in a future revision of the drawing.
For example, if a calculation showed the need to increase a weld size, and the drawing was subsequently revised, what means exists within the design process to insure that the weld is changed, and nothing else is changed, that is not addressed in the current calculation revision, that may effect the design adequacy.
In a meeting at SWEC in Boston on February 15, 1983, the Shoreham pipe support design process was discussed - in particular, the requirements of SWEC EAP 5.4, Page 17 (Attachment 1), shows a sample title block with the corresponding required signatures. The titles (DS, DC, RE, LE, PE) are defined for the EMD organization in the attached chart (Attachment 2). Thus, it is noted that those responsible for the calculations must sign the drawing. The calculations may not be updated to reflect the latest issue of a drawing.
- "#PTri FrVNE ENGINEERING SERVICES ICR No. 5633-17 This signature requirement provides documentation that the necessary review and interfaces exist in this portion of the Design Process. ICR-5633-17 should be Closed based on the above.
l I
ALTERNATE. TITLE BLOCK '
(A.B C SIZE DRAWINGS )
NOTE 2 -THE FOLLOWING APPROVERS SHALL INITIAL THE NOTE 1:-INITIALS SHALL BE LEGIBLE l DRAWING IN THE BLOCKS AS DESIGNATED BELOW AND REPRODUCIBLE THE PROJECT ENGINEER SHALL ALSO DATE THE *DATE* BLOCK.
RESPONSIBLE SUPERVISOR (DESIGN) (DS)
ORIGINATING GROUP (PARA 4.4.3b) ,
DESIGN COORDINATOR (PROJECT) (DC)
(PAR A 4.4.4)
RESPONSIBLE ENGINEER (RE)
(PAR A 4.5.5b)
% RESPONSIBLE LEAD ENGINEER (LE) g (PARA 4.5.6 b) 3- RESPONSIBLE SUPERVISOR % (DESIGN) 3 PROJECT ENGINEER (PE) INITI ALS AND LAST N AME-
$ (PARA 4.5.7) ORIGIN ATING GROUP (PARA. 4.l.8)
-* RESPONSIBLE ENGINEEWS INITIALS b
8 AND LAST NAME (PARA 4.1.1)
COGNIZ ANT PROFESSIONAL ENGINEERS ,
STAMP ( AS REQUIRED) AND METHOD OF INDICATING SUBSEQUENT APPROVAL OF REVISION S (PARA. 3.4.c )
"A* S I Z E DR AWINGS ONLY .
l
~
MARKING Q A CATEGORIES OF NUCLEAR k DR AWINGS (P AR A. 3.6) I
_ _. 3
!__ i ! NOTE 2 !* {
{ i 4 ) {
3 f CHECKER'S' INITIALS AND -
2 L AST NAME(PARA.4.1.3)
[9 INITIALS AND LAST NAME OF THOSE jQ pI ..,,,.., ,,... ,,
es at og E
b w (PAR A.4.1.1)yl.. ' . . .
- 1 INVOLVED IN PREPAR ATION _ ..... ........... .... . . . .
STONE & WEBSTER ENGINEERING CORR DWG. $
i ! Eb. .
j
-oesir,=to si e oma== sv 6 osum caso ev 6 cano er 4 i
i l
, l l
l SHOREHAM NUCLEAR POWER STATION LONG ISLAND LIGHTING COMPANY Correlation Between Shoreham Project EMD Organization and EAP 5.4 Organization Lead Engineer (EMD)
(Lead Engineer) (EAP)
Principal Engineer (EMD)
Resoonsible Engineer (EAP)
Responsible Engineer (EMD)
Resconsible Sucervisor (Desien) (EAP)
Engineers - Performs more Designers - Perform normal complicated pipe pipe support support analysis, design and calculations, previde technical check drawings direction Drafters - Prepare pipe support drawings Attachment 2
' '#TELEDYNE ENGINEERING SERVICES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTROLLED DOCUMENT ICR NO.
5633 15
Reference:
RRF No. 5633 6 Date: 3/10/83 PMR No. 5633 6 Final Classification of Item: Closed Reviewer Signature
.h n CommitteeChairmanSihature
. k$
Project Manager Signature l
"MTF1 mYNE ICR No. 5633-15 1.0 SUMARY During the initial field survey to determine actual plant configuration on June 14, 1982 all valves were checked and the nameplate data for each valve recorded. At this time some of the information on the nameplate fo? valve MOV-318 -seems to have been ground off. When these. numbers were checked against the manufacturer's data report form, Spec. SH1-88AD, Rev.1, and SWEC's Line Designation Table, none of the numbers, for the design conditions of the valve, were in agreement.
Since there was no correlation between these numbers this item could impact the adequacy of the design process, therefore Finding ICR No.
5633-15 was issued on December 8, 1982.
The LILC0/SWEC response indicates the following:
(1) There is no information missing from the nameplate. The original purchase specification dated July 17, 1973 listed the valve operating condition as 25 psi at 225 F, which agrees with the information on the nameplate. SWEC has since revised this spec. The original spec was reviewed during a visit to the plant site on February 16, 1983.
(2) The original specification SH1-88AD contained only operating conditions and not design conditions. Since the design conditions were unavailable the operating conditions were put on the nameplate. However, the vendor used the ANSI B16.5 valve pressure ratings to fill out the manufacturers data form. In .iew of these apparent discrepancies, in 1979 SWEC reviewed all ASME III Class 1, 2 and 3 motor operated gate and globe valves to update the design conditions and specifications.
(3) Letters were sent, to the valve vendors, Velan and Anchor Darling, requesting that they confirm the acceptability of
"#TF1 prVNE ICR No. 5633-15 changes and to supply new nameplates. These letters were received with the response for review.
(4) In 1981 and 1983 SWEC again performed reconciliations of the Line Designation Table and the valve specifications.
(5) On November 4 and 6, 1981, SWEC issued E&DCRs P-3714A and P-3778 to Velan and Anchor Darling for new nameplates. These E&DCRs were received with the response for review.
(6) The values in the Line Designation Table marked "For Piping Only" do not reflect the design condition for the valves.
This is because the design conditions for piping may be exceeded for short durations as allowed in ASME III NC-3612-3 but the design condition for the valves may not be exceeded.
Therefore design conditions in the Line Designation Table marked "For Piping Only" will not agree with the valve spec.
(7) New nameplates have not yet been installed on the valves.
Since the problem of documentation reconciliation has already been identified and corrective action is currently underway, this item should be closed.
I
' 'RTELEDYNE ENGINEERING SERVICES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTR0ttED ICR N0. DOCUtAENT 5633- 14
Reference:
RRF No. 5633 123 Date: 3/10/83 PMR No. 5633 123 Final Classification of Item: Closed
/ t ALUb,/?_6 R'e/kewer Signature
. G ;4 d ,i CommitteeChairmanSkature
- M%
Project Manager Signature t
l l
" ETA pnYNE ICR No. 5633-14 _1 ENGINEERING SERVICES 1.0 StM4ARY During the initial review there was concern with the fact that SWEC NUPIPE analysis was done using all carbon steel pipe up to the Reactor Pressure Vessel nozzle. SWEC Drawing 11600.02-FP-10C-8 showed a short segment of stainless steel pipe existed at the nozzle. Furthermore a TES field inspection indicated that the nozzle was a material other than carbon steel.
In an attempt to clarify this concern TES wrote Request for Information RFI 5633-56 for nozzle details.
SWEC response to RFI 5633-56 did not alleviate TES' concerns so TES generated ICR No. 5633-14 as a Finding.
The SWEC disposition response to ICR No. 5633-14 provided an E&DCR that had been omitted from SWEC's response to RFI 5633-56. This additional documentation satisfied the reviewer that the installed piping and piping drawings were in agreement.
The disposition response, although responding to the concerns of ICR No. 5633-14, raised another question about the incorporation of E&DCRs to their affected drawings. TES was concerned that E&DCRs were not being incorporated into the FP drawings in a timely manner. This subject was discussed at a February 15, 1983 interface meeting at SWEC.
SWEC personnel described the process for revisions to drawings per E&DCRs based on Engineering Assurance Procedure 6.3, including the change in the process per Project Procedure No. 38, whereby (FP) piping drawings are no longer updated and are essentially replaced by (IC) as-built isometrics. At this meeting TES requested that this process description be included in an addendum to the LILC0 response to TES ICR No. 5633-14.
This supplemental response to ICR No. 5633-14 was received by TES on February 25, 1983.
l
c
, 'MTF1 FTWNE ICR fio. 5633-14 Since the additional TES concern involved why the particular FP piping drawing had not been revised per the E&DCR and that the meeting notes and supplemental response from LILC0 described herein present detailed documentation to the change in the SWEC process in this matter, TES is satisfied and this item can be Closed.
"RTELEDYNE ENGINEERING SERVICES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTROLLED DOCUMENT ICR NO.
5633- 13
Reference:
RRF No. 5633- 162 Date: 3/4/83 PMR No. 5633- 162 Final Classification of Item: Closed Reviewer Signature M iY ~
u CommitteeChairmanSignbre
- M N Project Manager Signature i
l
"RTF1 RVNE ICR No. 5633-13 _1 ENGINEERING SERVICES 1.0
SUMMARY
The calculations for support IE21-PSR069-2, which is a small bore support attached to the shield wall, contained a procedure governing the field design of lightly loaded attachments to the primary shield wall.
This procedure-states to "... initiate design at SE0 and forward a copy of E&DCR to Boston Office." In the calculations for supports IE21-PSR-5057 and IE21-PSR-5144 there was no mention of any E&DCR. RFI No. 5633-37 was written to request these E&DCRs. In the response to the RFI SWEC responded that no unique E&DCRs exist. Since this was in violation of the procedure and there appeared to be no controls on attachments to the shield wall, this item was classified as a Finding in ICR no. 5633-13.
In their response to this Finding, SWEC stated "The procedure is not an officially sanctioned project procedure nor does it come within the procedural system of SWEC." Because of this SWEC is removing all references to this procedure from the calculations.
Additionally, the SWEC response to the RFI and subsequent discussions at a meeting with LILC0 and SWEC on February 15, 1983 further clarified this situation. There was concern on TES' part with the effect of small bore support loads on the shield wall. The procedure attached to the original calculations covered this by requiring generation of an E&DCR and subsequent review by the Boston office. Deletion of that procedure raised this concern.
SWEC indicated that a study had been done in 1980 to address this situation. Essentially, small bore supports, by their design, can only transmit a given maximum load. Since large bore supports and pipe whip restraints are also attached to t'le shield wall they control the design capacity. For example, the load from these supports is 4,000 to 6,000 times that of small bore supports.
'RTF1 mVNE ICR no. 5633-13 NNUE O TES was still concerned with local effects on the shield wall and the difference in load cited above would not be appropriate unless large bore supports were also located on panels between stiffeners. A review was performed and some large bore supports are located between stiffeners. For example, support IE21-PSSH036 is not located on stiffeners and the load on the shield wall from this support is 9,500 lbs and a normal smail bore support applies approximately 250 lbs.
The concern of TES with respect to local effect on the shield wall is satisfied.
Also of concern was the design of the small bore support. The calculation packages for PSR 5057 and PSR 5144 show the supports as standard supports, which consist of a baseplate and bolts with back-to-back angles cantilevered off the plate. The actual support is a 3 x 3 tube welded to the shield wall but no unique drawing was generated.
E&DCR F-24523 covers the substitution of the tube for the back-to-back angles. This E&DCR contains standard substitution for which no drawing has to be generated. E&DCR F-16785A covers the deletion of the baseplate and welding to an embedded plate instead.
Since all items have been clarified TES is satisfied this item should be closed.
6 . .
'A'TELEDYNE ENGNEERING SERVICES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTROLLED DOCUMENT ICR NO.
5633- 9
Reference:
RRF No. 5633 164 Date: 3/10/83 PMR No. 5633 164 Final Classification of Item: Closed A
Reviewer Signature S. S. GAA4 CommitteeChairmanSihture
- YW _
Project Manager Signature
, ' ETA pnYNE ENGINEERING SERVICES ICR No. 5633-9 _1_
1.0 SUMARY During the initial review of pipe support calculations for the Core Spray System, an apparent inconsistency in the methnds for calculating friction forces was noted. At this time only two design documents governing the calculation of friction forces on supports were available.
Specificat. ion No. SHI-68, Rev. 2, specification for the design and fabrication of nuclear power plant piping support and pipe stress, pipe support, and duct support criteria document for the Shoreham Nuclear Power Station (DCD). The procedures in the DCD supercede the procedures in Spec. No. SHI-68 which raise the initial concern of why the procedure for calculating friction forces was changed. Also of concern was what forces were used in calculating friction forces. The DCD states "the average value of the frictional force shall be taken as 0.3 times the normal force," but does not explain what loads the normal force is composed of.
Seven supports were reviewed which contained calculations of friction forces. In these calculations two different methods were used for calculating the normal force. For supports IE21-PSR018, IE21-PSR057 and IE21-PSR065 only the deadweight and thermal loads were used to calculate the normal force. Supports IE21-PSR002, IE21-PSR020, IE21-PSR025 and IE21-PSR067 used deadweight, thermal and seismic loads in calculating the normal foce. Since the spec did not specify whether seismic loads were included in the normal force, the discrepancy was a possible violation of the spec and was issued as a Finding on November 30, 1982.
SWEC in their response to this Finding, ICR No. 5633-9, referenced Engineering Division Memorandum No. EMD-80-3 which is titled " Friction Forces for the Design of Pipe Support Guides and Restraints." This document was also made available to TES for review at a meeting on March 15, 1982 at SWEC offices.
\
'W TF1 m(NE ICR No. 5633-9 The friction criteria in the DCD was taken from EMD 80-3 and this replaced Spec. SHI-68 to provide a more exact method for calculating frictional forces and to be more representative of industrial practice.
Spec. SHI-68 is more conservative then EMD 80-3 in both coefficient of friction and definition of normal force. Therefore previous calculations need not be redone and when revisions are made to the calculations the new procedures may be utilized. EMD 80-3 defines what is included in the normal force as " friction forces are only considered significant for signed loads; friction forces from cyclic loads may be neglected." Signed loads are defined as loads acting in one direction such as deadweight and thermal or a dynamic load which does not change sign for a significant portion of its duration, such as a safety relief valve discharge. Based on the information from EMD 80-3, all the support calculations meet the design criteria and those that include all seismic loads or have a higher friction coefficient are conservative.
This procedure agrees with methods currently used in the nuclear industry for pipe support design and is acceptable to TES.
Since EMD 80-3 clarifies the definition of normal force and is a reference for the design criteria originally reviewed this item should be closed.
a
'#TELEDYNE ENGINEERING SERVICES INDEPENDENT DESIGN REVIEW SHOREHAM NUCLEAR POWER STATION CONTROLLED DOCUMENT ICR NO.
5633 2
Reference:
RRF No. 5633- 79 Date: 3/11/83 PMR No. 5633- 79 Classification of Item: Additional Concern
/).
_ (4.) , met deviewerSignature m,0. Y h CommitteeChairmanbgnature l .- i
. ph5 Project Manager Signature l
'MTs 1 pr1YNE ICR No. 5633-2 -1_
ENGINEERING SERVICES 1.0 TNTRODUCTION TES issued ICR No. 5633-2 on November 2,1982 which was a Finding on the selection and use of pads on large bore piping. A disposition response from LILC0 and SWEC was received by TES on January 15, 1983.
This response indicated the following:
(1) Support was vendor designed.
(2) Pad and p.ipe reanalyzed on January 11, 1983 and found acceptable.
(3) All Category I supports with reinforcing pads designed by vendors were reviewed by SWEC.
The calculations of January lith along with other pertinent information were attached to the response for TES review.
A meeting was held at SWEC in Boston on February 15, 1983 to discuss outstanding items requiring additional information. As a result of that meeting TES was supplied with three additional calculation packages for the highest (pipe stress) stressed locations.
2.0 PIPE SUPPORT CALCULATIONS TES has reviewed the revised support calculations 1E21-PSSH021 (Revision 5) submitted with the SWEC response, and the three additional calculation packages received after the meeting at SWEC. These are 1821-PSSH001, 1821-PSSH024 and 1E21-PSSH005.
In reviewing the above calculations additional concerns have been raised by the reviewer. These are:
(1) The supports are all axial type supports. However, the supports are offset and therefore a primary bending load is l
induced in the piping system due to this offset.
l
9
'RTn mYNE ICR No. 5633-2 Beam offsets were not modelled into the piping analysis for any of the following Spring (s) or Rigid (R) Supports.
PSSH021(S) PSSH026(S)
PSR050(R) PSSH010(S)
PSR064(R) PSR011(R)
Support 1E21-PSR-065 was modelled with an offset.
(2) Except for support 1E21-PSSH-21 calculations for pad stresses and weld stresses of pad to pipe are not included in the analysis package.
(3) The allowable stress for A36 steel welded to the pressure boundary is given on Page 17 of . Calculation 1E21-PSSH-21-5 as 12,600 psi. This value is used again on Page 26 for the weld of the pad to the W6X25. However, the allowable stress of the weld to the pipe used the piping allowable (15,000 psi for SA106 Gr B) instead of the lower of the allowables which is required by B31.1 for attachments to the pressure boundary.
Section III 1971 Edition with Winter 1972 Addenda (Code defined in FSAR) states in Paragraph NC-3676.9 that supports conform to the requirements of ANSI B31.1 1967 in accordance with Paragraph 121. The reviewer cannot ascertain what Code (s) and Jurisdictional boundaries have been applied in the design of the supports.
(4) For Support 1E21-PSSH005 the analyst used the fillet weld centerline as the pad edge for qualifying the pipe stresses.
In addition the offset described in (1) above was not included in the calculations.
'WTA m(NE ICR No. 5633-2 (5) The Interoffice Memos contained in 1E21-PSSH021 as Attachment Nos. 1 and 2 serve as the design basis for pad analysis. What are pad size limits (size, shape, thickness) when a trunnion is welded to a pad but not the pipe and therefore pressure is assumed zero and only carried by pipe?
(6) The attachment of pads and/or trunnions directly to elbows changes the flexibility and stress intensification. It does not appear that SWEC accounted for these changes in the analysis.
The above additional concerns apply to both SWEC and vendor designed pads and trunnions. In view of the above additional concerns, this item cannot be Closed at this time.