Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073C590 + (09:01:17, 15 December 2024)
- 05000328/LER-1983-033-03, /03L-0:on 830307,containment Internal Pressure Limit of +.3 Psid Relative to Annulus Exceeded.Caused by Reopening of Annulus Vacuum Fan Exhaust Dampers.Containment Vent Performed + (09:01:19, 15 December 2024)
- 05000395/LER-1983-023, Forwards LER 83-023/03L-0.Detailed Event Analysis Encl + (09:01:20, 15 December 2024)
- ML20073C550 + (09:01:20, 15 December 2024)
- ML20073C548 + (09:01:21, 15 December 2024)
- 05000395/LER-1983-022-03, /03L-0:on 830308,conduit Containing Smoke Detector Circuits Cut During Core Drilling for Plant Mod.Fire Watch Posted.Caused by Failure to See Conduit Embedded in Fireproofing Matl.Conduit & Cable Replaced + (09:01:23, 15 December 2024)
- 05000328/LER-1983-033, Forwards LER 83-033/03L-0 + (09:01:24, 15 December 2024)
- ML20073C527 + (09:01:24, 15 December 2024)
- 05000395/LER-1983-024-03, /03L-0:on 830311,main Steam Line C Radiation Monitor Experienced Spurious Alarms.Caused by Slack Detector Cable Allowing Signal Oscillations.Detector Cable Will Be More Adequately Secured by 830501 + (09:01:26, 15 December 2024)
- 05000395/LER-1983-022, Forwards LER 83-022/03L-0.Detailed Event Analysis Encl + (09:01:27, 15 December 2024)
- ML20073C514 + (09:01:27, 15 December 2024)
- 05000395/LER-1983-024, Forwards LER 83-024/03L-0.Detailed Event Analysis Encl + (09:01:28, 15 December 2024)
- ML20073C506 + (09:01:28, 15 December 2024)
- ML20073C499 + (09:01:29, 15 December 2024)
- ML20073C504 + (09:01:29, 15 December 2024)
- ML20073C496 + (09:01:30, 15 December 2024)
- 05000348/LER-1983-009-03, /03L-0:on 830307,train a RHR Sys Declared Inoperable When RHR Pump 1A Inadvertently Secured.Caused by Misinterpretation of Instructions.Personnel Instructed to Communicate Clearly.Rhr Pump 1A Started + (09:01:31, 15 December 2024)
- 05000287/LER-1983-002-01, /01T-0:on 830225,engineering Evaluation of Reactor Protective Sys Pump Power Monitor Test Revealed Failure to Have One Channel Tripped When Three Channels Operable.Caused by Deficient Procedures.Procedures Revised + (09:01:33, 15 December 2024)
- 05000348/LER-1983-009, Forwards LER 83-009/03L-0 + (09:01:34, 15 December 2024)
- 05000287/LER-1983-002, Forwards LER 83-002/01T-0.Detailed Event Analysis Encl + (09:01:35, 15 December 2024)
- ML20073C473 + (09:01:35, 15 December 2024)
- ML20073C471 + (09:01:36, 15 December 2024)
- 05000395/LER-1983-020-03, /03L-0:on 830305,fire Detector Sys Control Room Alarm Capability Lost for Intermediate Bldg Zones Aa,Bb & CC & for Diesel Generator Bldg Zones DG (427) & DG (436).Caused by Blown Fuse.Fuse Replaced + (09:01:38, 15 December 2024)
- 05000395/LER-1983-020, Forwards LER 83-020/03L-0.Detailed Event Analysis Encl + (09:01:39, 15 December 2024)
- ML20073C454 + (09:01:39, 15 December 2024)
- 05000269/LER-1983-008-01, /01T-0:on 830303,valve & One Independent HPI Train Declared Inoperable When Valve 1HP-25 Failed to Fully Open Electrically.Caused by Component Failure.Valve Operators for HP-24 & 25 Valves Will Be Replaced + (09:01:41, 15 December 2024)
- 05000269/LER-1983-008, Forwards LER 83-008/01T-0.Detailed Event Analysis Encl + (09:01:42, 15 December 2024)
- ML20073C440 + (09:01:42, 15 December 2024)
- ML20073C407 + (09:01:43, 15 December 2024)
- ML20073C430 + (09:01:43, 15 December 2024)
- A09166, Submits Results of Review of Allegation R1-90-A-0208 Re Maint/Weld Repairs on Moisture Separator Reheaters.No Procedural Violations Occurred During Repair Process + (09:01:44, 15 December 2024)
- ML20073C392 + (09:01:45, 15 December 2024)
- ML20073C387 + (09:01:46, 15 December 2024)
- ML20073C388 + (09:01:46, 15 December 2024)
- A09187, Submits Results of Review of Allegation R1-90-A-0205 Re Oil Not Removed from Motor Prior to Removing Motor or Disconnecting Motor Leads.Procedure MP-272OC5 Will Be Clarified + (09:01:47, 15 December 2024)
- ML20073C385 + (09:01:47, 15 December 2024)
- 05000254/LER-1994-009-06, :on 940823,omissions in Inventory & Leak Test Paperwork Discovered During Review of Inventory & Leak Test Program for Sealed Sources.All Sealed Sources That Required Leak Test But Missed Tested + (09:01:49, 15 December 2024)
- ML20073C377 + (09:01:50, 15 December 2024)
- ML20073C376 + (09:01:50, 15 December 2024)
- ML20073C375 + (09:01:51, 15 December 2024)
- TXX-3654, Responds to Generic Ltr 83-10C Re Plan for Resolution of TMI Action Plan Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Revised Westinghouse Criteria Will Ensure Continued Forced RCS Flow for Steam Generator Tubes + (09:01:51, 15 December 2024)
- ML20073C367 + (09:01:53, 15 December 2024)
- A09188, Submits Results of Review of Allegation R1-90-A-0206 Re Low Flow Setpoint on Standby Pump.Caused by Procedural Noncompliance.Valve Setpoint Change Processed + (09:01:54, 15 December 2024)
- ML20073C366 + (09:01:54, 15 December 2024)
- ML20073C360 + (09:01:55, 15 December 2024)
- ML20073C358 + (09:01:55, 15 December 2024)
- ML20073C354 + (09:01:56, 15 December 2024)
- ML20073C348 + (09:01:57, 15 December 2024)
- ML20073C343 + (09:02:00, 15 December 2024)
- ML20073C335 + (09:02:01, 15 December 2024)
- ML20073C336 + (09:02:01, 15 December 2024)