Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000293/LER-1983-013-01, /01T-0:on 830403,field Breaker for B Recirculation Pump Motor Generator Set Did Not Trip While Being Removed from Svc for Maint.Caused by bound-up Mechanism Preventing Breaker Opening.Breaker Linkages Lubricated + (08:27:55, 15 December 2024)
- ML20073P180 + (08:27:56, 15 December 2024)
- 05000271/LER-1983-012-01, /01P-0:on 830412,during Inservice Insp Required by IE Bulletin 83-02,rejectable Indications Discovered on Five Risers to Sweepolet Welds & Two Pipe to safe-end Welds. Rept Will Be Submitted Prior to Resuming Power Operations + (08:28:00, 15 December 2024)
- ML20073P170 + (08:28:02, 15 December 2024)
- ML20073P159 + (08:28:03, 15 December 2024)
- 05000293/LER-1983-013, Forwards LER 83-013/01T-0.Detailed Event Analysis Encl + (08:28:04, 15 December 2024)
- ML20073P149 + (08:28:04, 15 December 2024)
- 05000271/LER-1983-012, Forwards LER 83-012/01P-0 + (08:28:05, 15 December 2024)
- ML20073P138 + (08:28:05, 15 December 2024)
- ML20073P137 + (08:28:06, 15 December 2024)
- ML20073P133 + (08:28:07, 15 December 2024)
- ML20073P128 + (08:28:08, 15 December 2024)
- 05000289/LER-1983-004-03, /03L-0:on 830313,condensation Found in Waste Gas Sys Gas Analyzer While Investigating High Oxygen Alarm. Caused by Failure of Drain Pot Valve to Open Due to Corrosion.Valve Replaced + (08:28:09, 15 December 2024)
- ML20073P123 + (08:28:11, 15 December 2024)
- ML20073P126 + (08:28:11, 15 December 2024)
- ML20073P121 + (08:28:12, 15 December 2024)
- CNL-19-095, Application to Modify the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (SQN-TS-19-04) + (08:28:13, 15 December 2024)
- ML20073P118 + (08:28:13, 15 December 2024)
- ML20073P115 + (08:28:14, 15 December 2024)
- ML20073P112 + (08:28:14, 15 December 2024)
- ML20073P109 + (08:28:15, 15 December 2024)
- ML20073P015 + (08:28:16, 15 December 2024)
- ML20073N917 + (08:28:16, 15 December 2024)
- ML20073N882 + (08:28:17, 15 December 2024)
- ML20073N904 + (08:28:17, 15 December 2024)
- ML20073N632 + (08:28:18, 15 December 2024)
- ML20073N554 + (08:28:19, 15 December 2024)
- NRC-20-0019, Change in DTE Commitment Regarding Containment Coatings and Additional Information + (08:28:23, 15 December 2024)
- 05000324/LER-1983-024-03, /03L-0:on 830321,during Routine Channel Check, Discrepancies in Level Indication of Reactor Level Instrument 2-B21-LT-NO17D-1 & Redundant Instrument Found. Caused by Small Stem Packing Leak.Leak Repaired + (08:28:25, 15 December 2024)
- 05000324/LER-1983-024, Forwards LER 83-024/03L-0 + (08:28:26, 15 December 2024)
- ML20073N216 + (08:28:26, 15 December 2024)
- ML20073N215 + (08:28:27, 15 December 2024)
- ML20073N208 + (08:28:27, 15 December 2024)
- 05000277/LER-1983-006-01, /01T-0:on 830323,investigation of Spike on Torus Level Recorder Determined That Test Apparatus Left in Svc from 830320 W/Instrument Drain Valve Left Open Providing Potential Containment Leak Path.Caused by Personnel Error + (08:28:29, 15 December 2024)
- 05000247/LER-1983-005-03, /03L-0:on 830308,while Bringing Auxiliary Feedwater Pump Up to Operating Speed for Bimonthly Surveillance Testing,Outboard Bearing Started to Smoke. Caused by Pump Bearing Needing Repacking.Pump Repacked + (08:28:31, 15 December 2024)
- 05000277/LER-1983-006, Forwards LER 83-006/01T-0.Detailed Event Analysis Submitted + (08:28:32, 15 December 2024)
- 05000247/LER-1983-005, Forwards LER 83-005/03L-0 + (08:28:33, 15 December 2024)
- ML20073N144 + (08:28:33, 15 December 2024)
- 05000272/LER-1983-019-03, /03L-0:on 830315,diesel Fire Pump 2 Failed to Automatically Start on Decreasing Header Pressure & Declared Inoperable.Caused by Loose Wiring Connection on Diesel Engine Starter.Wiring Connection Retightened + (08:28:35, 15 December 2024)
- RBG-34-970, Special Rept:On 910409,start Time of Div III Emergency Diesel Generator Exceeded Tech Spec Start Time of 10 S. Caused by Field Flash Relay Time Delay & Faulty Air Start Motors.Time Delay Adjusted & Motors Overhauled + (08:28:38, 15 December 2024)
- ML20073N114 + (08:28:39, 15 December 2024)
- ML20073N110 + (08:28:40, 15 December 2024)
- ML20073N111 + (08:28:40, 15 December 2024)
- ML20073N103 + (08:28:44, 15 December 2024)
- 05000361/LER-1983-033-03, /03L-0:on 830315,pilot Flames of Train a & B Toxic Gas Isolation Sys Butane Monitors Extinguished.Caused by Low Pressure in Single Hydrogen Supply Bottle.Bottle Replaced + (08:28:46, 15 December 2024)
- 05000361/LER-1983-033, Forwards LER 83-033/03L-0 + (08:28:47, 15 December 2024)
- 05000311/LER-1983-004-04, /04L-0:on 830317,during Gaseous Effluent Testing, Iodine/Particulate Collection Device Sample Pump Deenergized.Caused by Not Including Pump on Electrical Distribution List.Tagging Sys Will Be Revised + (08:28:48, 15 December 2024)
- 05000361/LER-1983-034-03, /03L-0:on 830319,during Mode 5 Operation,Control Power to P160 (Emergency Chilled Water Pump Train B) Lost. Caused by Operator Charging Control Switch Lamp Which Resulted in Short Circuit & Blown Fuse.Fuse Replaced + (08:28:50, 15 December 2024)
- ML20073N062 + (08:28:51, 15 December 2024)
- 05000311/LER-1983-004, Forwards LER 83-004/04L-0.Detailed Event Analysis Encl + (08:28:52, 15 December 2024)
- ML20073N044 + (08:28:53, 15 December 2024)