ML20073N144

From kanterella
Jump to navigation Jump to search
RO 369/83-13:on 830315,Tech Spec 3.5.1.2 Requiring That Upper Head Injection Accumulator Sys to Be Operable W/Water Filled Accumulator Violated.Items Not Resolved W/ Westinghouse,Therefore Complete Rept Delayed Until 830429
ML20073N144
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 04/15/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-369-83-13, NUDOCS 8304220386
Download: ML20073N144 (1)


Text

.. .

n'A orc 1'jf DUKE Pow:<En t o yGOMPmd' l .

P.O. HOx 'M189 h * " - '

CHARLOTTE, N.C. 28242 HALH. TUCKER Tetzpuoxz

.22."d",'"".- W 7 ~*"

Aprilg5 ppg A $ . ( $

Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II

.101 Marietta Street NW, Suite 2900 Atlanta, Georgia 30303 Re: McGuire Nuclear Station Unit 1 Docket No. 50-369

Dear Mr. O'Reilly:

Reportable Occurrence Report R0-369/83-13 was to have been submitted by April 15, 1983. This 30 day reportable occurrence (pursuant to T.S. 6.9.1.13) concerns T.S. 3.5.1.2, "Each upper head injection accumulator system shall be operable with:. . .b. the water-filled accumulator containing a minimum of 1850 cubic feet of borated water. . .'.', which was violated on March 15, 1983. At this time certain items have not yet been resolved with Westinghouse and, therefore, preparation of a complete report is not possible. It is expected that these items will be resolved and a complete report submitted by April 29, 1983.

Very truly yours, f8. fAM fp Hal B. Tucker PBN:jfw cc: Document Control Desk Records Center U. S. Nuclear Regulatory Commission Institute of Nuclear Power Operations Washington, D. C. 20555 1100 circle 75 Parkway, Suite 1500 l