ML20073N103
| ML20073N103 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 04/14/1983 |
| From: | Miller D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20073N101 | List: |
| References | |
| CSC-6666, NUDOCS 8304220375 | |
| Download: ML20073N103 (1) | |
Text
-=
_,,m2
.,1__
.m.
- e CORSilm0IS Donald 5 Mdler, Jr
[i
.n OY!Er se,, u...,,,
1 Mid!.nd Proj,ct QQ Q
\\_
Midland Project: PO Som 1963, Midland, MI 48640 * (517) 631-8650 April 14, 1983 Mr. J. J. Harrison, Chief Midland Project Section U.S. Nuclear Regulatory Comission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENGERGY CENTER GWO 7020 REMEDIAL SOILS WORK AlTDiORIZATION File:
0485.16 UFI:
42*05*22*04 Serial: CSC-6666 12*32 We have completed our review of the documents for the activity listed below.
Based on our review, we have concluded that we are ready to start the work:
802450005 Exploratory excavation for examination of diesel fuel lines.
According to the NRC/CPCo Work Authorization Procedure, we request author-ization for the above activity.
l J
DBM/DNP/klm i
l l
l l
l 8304220375 830413 DR ADOCK 05000329 PDR l
m _.. _ _ _ _.,
s f
ConSum8IS
'C Power Company Midland Project: PO Som 1963, Midtend, MI 48640.(517) 6314 650 April 6,1983 Mr. Jay Harrison Midland Project Section.
U. S. Nuclear Regulatory Ccmnission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIAND PRCLTECT GO 7020 REMEDIAL SOILS WORK AUDIORIZATICN File:
0485.16 UFI:
42*05*22*04 Serial: CSC-6646 12*32 We have ccnpleted our retriew of the documents for the activities listed below.
Based on our review, we concluded that we are ready to start the work:
155052025 - Drift frcra Pier 9E to Pier 85 155053020 - Excavate Pier 8E 155054020 - Install and load Pier 8E 165052025 - Drift frcru Pier 9W to Pier 8W 165053020 - Excavate Pier Bi*
165054020 - Installeand Load Pier 8W
' 102250201 - Mod.tfy Beam Connections at Elevation 646'(1)
- 102250203 - Modify Beam Connections at Elevation 659'(2)
-102250205 - Modify Beam Connections at Elevation 704'(10)
According to the NPC/CPCo Work Authorization Procedure, we request authorization for the above a
- ties.
t D. B. Miller, Jr.