Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073R058 + (08:23:08, 15 December 2024)
- ML20073R056 + (08:23:09, 15 December 2024)
- 05000331/LER-1983-008-31, /03L-0:on 830326,eight Accessible Hydraulic Snubbers Visually Inspected & Deficiencies Noted. Surveillance Procedure STP 46H002 Revised to Address Mechanical Aspects in Addition to Hydraulic Mechanism + (08:23:10, 15 December 2024)
- 05000331/LER-1983-008, Forwards LER 83-008/03L-0 + (08:23:11, 15 December 2024)
- ML20073R047 + (08:23:12, 15 December 2024)
- ML20073R046 + (08:23:13, 15 December 2024)
- ML20073R045 + (08:23:14, 15 December 2024)
- 05000313/LER-1983-009-03, /03L-0:on 830405,during Hot Shutdown After Refueling Outage,Discovered That Nonqualified Diaphragm Was Used to Repair Pressure Switch PS-7503 in Standby Hydrogen Purge Sys.Qualified Pressure Switch Obtained & Installed + (08:23:15, 15 December 2024)
- 05000318/LER-1983-015-03, /03L-0:on 830321,invalid in-core Detector Linear Heat Rate Alarm Revealed Incorrect Alarm Setpoints Entered on 830307.Caused by Improper Alarm Setpoint Forms.Setpoints Corrected & Forms Clarified + (08:23:17, 15 December 2024)
- 05000318/LER-1983-015, Forwards LER 83-015/03L-0 + (08:23:18, 15 December 2024)
- 05000313/LER-1983-009, Forwards LER 83-009/03L-0 + (08:23:18, 15 December 2024)
- ML20073R030 + (08:23:19, 15 December 2024)
- 05000247/LER-1983-007-03, /03L-0:on 830322,svc Water Pump 26 Removed from Svc Due to Inoperable Strainer.Caused by Sheared Key Connecting Drive Motor to Filter Shaft Due to Excessive Debris Accumulation within Strainer Basket.Basket Cleaned + (08:23:23, 15 December 2024)
- ML20073R022 + (08:23:24, 15 December 2024)
- ML20073R013 + (08:23:25, 15 December 2024)
- 05000247/LER-1983-007, Forwards LER 83-007/03L-0 + (08:23:26, 15 December 2024)
- ML20073R010 + (08:23:26, 15 December 2024)
- ML20073R008 + (08:23:27, 15 December 2024)
- ML20073R004 + (08:23:27, 15 December 2024)
- ML20073R001 + (08:23:28, 15 December 2024)
- 05000324/LER-1983-016-03, /03L-0:on 830323,reactor Bldg Exhaust Ventilation high-high Alarm Occurred Concurrent W/Group 6 Primary Containment Isolation Signal.Caused by Failure of Relay K2 in Indication & Trip Unit D12-K609A.Relay Replaced + (08:23:30, 15 December 2024)
- 05000361/LER-1983-026, Forwards LER 83-026/01T-0.Detailed Event Analysis Submitted + (08:23:34, 15 December 2024)
- 05000324/LER-1983-016, Forwards LER 83-016/03L-0 + (08:23:35, 15 December 2024)
- ML20073Q985 + (08:23:35, 15 December 2024)
- L-83-268, Forwards Vols 1 & 2 to Annual Nonradiological Aquatic Monitoring Rept,1982 + (08:23:36, 15 December 2024)
- 05000455/LER-1990-005, :on 900817,pre-outage Mod Work Initiated W/O Proper Operability Review.Caused by Programmatic Deficiencies.Daily Const Work Authorization Sheet Formalized Specifying Scope of Work + (08:23:38, 15 December 2024)
- DCL-91-140, Forwards Change 6 to Rev 17 to Physical Security Plan.Encl Withheld (Ref 10CFR73.21) + (08:23:39, 15 December 2024)
- ML20073Q930 + (08:23:39, 15 December 2024)
- ML20073Q925 + (08:23:40, 15 December 2024)
- ML20073Q914 + (08:23:41, 15 December 2024)
- ML20073Q903 + (08:23:42, 15 December 2024)
- JPN-91-025, Advises That Plant walk-through for Seismic Verification Per Generic Ltr 87-02 & USI A-46 Deferred Until Generic Implementation Procedure Approved & Various Seismic Issues Resolved + (08:23:43, 15 December 2024)
- ML20073Q899 + (08:23:43, 15 December 2024)
- 05000277/LER-1991-010-01, :on 910426,recirculation Pump Speed Increase Resulted in Increase in Recirculation Loop Temp from 143 F to 251 F.Caused by Failure to Follow procedure.Single-loop Procedure Will Be Reviewed & Revised + (08:23:45, 15 December 2024)
- ML20073Q877 + (08:23:46, 15 December 2024)
- ML20073Q852 + (08:23:47, 15 December 2024)
- ML20073Q862 + (08:23:47, 15 December 2024)
- ML20073Q850 + (08:23:48, 15 December 2024)
- ML20073Q829 + (08:23:49, 15 December 2024)
- ML20073Q826 + (08:23:49, 15 December 2024)
- ML20073Q822 + (08:23:50, 15 December 2024)
- ML20073Q819 + (08:23:51, 15 December 2024)
- ML20073Q815 + (08:23:51, 15 December 2024)
- ML20073Q806 + (08:23:54, 15 December 2024)
- 05000445/LER-1991-017, :on 910429,discovered That Scheduling of TS Surveillance Testing of Containment Hydrogen Monitors Had Not Satisfied Staggered Test Basis Requirement.Caused by Personnel Error.Personnel Trained + (08:23:56, 15 December 2024)
- ML20073Q800 + (08:23:57, 15 December 2024)
- 05000325/LER-1991-011, :on 910424,unexpected Trip on Electrical Protection Assembly Output Breaker in Alternate Power Source Caused Power Loss to Bus B.Caused by Component Failure of Electrical Protection Assembly + (08:23:59, 15 December 2024)
- JAFP-91-0292, Forwards Justification for Continued Operation Re Failure of Licensed Operator Requalification Training Program During Exams Administered Prior to Wk of 910429.List of Corrective Actions & Commitments Also Encl + (08:24:00, 15 December 2024)
- ML20073Q767 + (08:24:00, 15 December 2024)
- ML20073Q740 + (08:24:01, 15 December 2024)
- 05000456/LER-1991-006-04, :on 910427,ESF Actuation Occurred During Surveillance Testing.Caused by Lifted Lead on Undervoltage Relay.Maint Dept & Work Planning Dept Conducted Training + (08:24:03, 15 December 2024)
- ML20073Q714 + (08:24:07, 15 December 2024)