Public Version of Rev 0 to Emergency Plan Implementing Procedures EP-RB-12, Mid & High-Range Vent Monitors & EP G-3, Notification of Offsite Organizations
ML20073Q877
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/06/1983
From:
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML16340D347 List:
References
PROC-830406, NUDOCS 8305030193
Download: ML20073Q877 (19)


Text

. -. -

ATTAOBENT 1 Updates In This Submittal

~

Volume 3A Updated Table of Contents EP G-3 Revision 2 Volume 3B EP R&-12 On-The-Spot Nantre I

r i

O B305030193 830422 PDR ADOCK 05000275 F

PDR

ATTACHMENT 2 Incatim of Bracketed Privacy / Proprietary Informatim Procedure G-3, Revisi m 2:

"Eksergency Offsite Organization Call List", throughout List., " Recovery Manager Mobile Phone and Pager Instructims", Page 1 of 1.

l l

l l

l l

\\

^^'

u....

5 GRRENT EMEIUDICY PLAN

'~

IMPIBENTING PROCEDURES TABLE OF OCPT. ENTS Volume 3A TITLE REV OP-0 Reactor Trip With Safety Injectial 3

OP-1 Ioss of Coolant Accident 5

OP-2 Iess of Secondary Coolant 2

OP-3A Steam Gen Tube Failure 4

OP-3B Minor Steam Gen Tube Failure 1

OP-4 Loss of Electrical Power 3

OP-5 Reactor Trip Without Safety Injection 5

OP-6 Bnergency Boration 5

OP-7 Ioss of Condenser Vacuum 2

OP-8 Control Rom Inaccessibility 5

OF0 Ioss of Reactor Coolant Pump 3

OP-10 Loss of Auxilia:y Salt Water 2

OP-11 Locs of Caponent Cooling Water 2

OP-12 Malfunction of Auto Reactor Control 1

Syste OP-12A Failure of a Control Bk to 2

Move in Auto OP-12B Cont Witndrawal of a Control Rod Bank 3

OP-12C Cont Insertion of a Control Rod Bank 2

OP-12D Control Rod Pos Indication Sys Malfunc 3

OP-12E Control Rod Misaligment 2

OP-12F Drupped Control Rod 2

OP-13 Malfunction of Reactor Press Control Systu:1 2

OP-14 High Activity in Reactor Coolant 2

OP-15 Ioss of Feedwater 4

OP-16 Nuclear Instrumentation Malfunctions 3

OP-17 Malfunction of RHR Syst s 2

OP-18A Ioss of Charging 0

OP-18B Ioss of Nonnal Letdown 0

OP-19 Malfunction of Reactor Makeup Control 2

OP-20 Excessive Reactor Coolant Syste 2

Isakage P


,F-

TITLE REV OP-21 Ioss of A Coolant Loop RTD 2-OP-22 Bnergency Shutdown 1

OP-23 Natural Circulation of Reactor Coolant 2

OP-24 Ioss of Contaiment Integrity 1

OP-25 Tank Ruptures 1

OP-26 Excessive Feedwater Flow 1

OP-27 Irradiated Fuel Damage 1

OP-28 Startup of an Inactive Reactor Coolant Loop 1

OP-29 Excessive Load Increase 1

OP-30 Inadvertent Load Fuel Assly Improper Pos 1

OP-31 Syste Under Frequency 1

OP-32 Rod Ejection 1

OP-33 Ioss of Instrument Air 1

OP-34 Generator Trip - Full Load Rejection 1

OP-35 Ioss of Vital or Non-Vital Instr AC Sys 1

OP-36 Turbine Trip 1

OP-37 Ioss of Protection Systen Channel 1

OP-38 Anticipated Transient Without Trip (A'IYr) 3 OF39 BCP locked Rotor Accident 1

OP-40 Accidental Depress:1rization of MS Syste 1

OP-41 Hydrogen " Explosion" Inside Contaiment 1

OP-44 Gascous Voids in the RCS 2

R-1 Per Injury (Rad Related) And/Or Overexp 8

R-2 Rel of Airborne Radioactive Materials 3

R-3 Rel of Radioactive Liquids 3

R-4 High External Radiation 3

R-5 Radioactive Liquid Spill 3

R-6 Radiological Fire 5

R-7 Transportation Accidents 2

M-1 Euployee Injury (Nonradiological) 8 M-2 Injury to Nonenployee (Third Party) 7 M-3 Chlorine Release 5

M-4 Earthquake 6

M-5 Tsimami Warning 5

M-6 Nonradiological Fire 7

M-7 Oil Spill ISO and Clean Up Procedure 4

M-8 Contairmnent Emergency Personnel Hatch 0

G-1 Accident Classification and Emergency Plan 3

Activation G-2 Establishment of the On-Site Emergency 3

Organization G-3 Notification of Off-Site Organizations 2

G-4 Personnel Accountability and Assenbly 2

G-5 Evacuation of Nonessential Site Personnel O

PGwE DIABLO CANYON POWER PLANT

.% Y[li2)"*

PROCEDURE ON-THE-SPOT CHANGE l,f J;L, EP RL-12 0

n,,,,

  • =.i O 20 ia20 proceen No.

MID AND HIGH RAl1GE PLAilT VENT t10;1ITORS n.

M PERMANENT (yeen)

TEMPORARY (yodow); r.aoiration case Type of Cha 1en:

H. Ferouson Chemistry & Radiation Protection n, wmo, n - ing o

,,n.,,

propo e chanos. (oon vue aner the war. os orgnes p cosau.e?

Yes E No)

(Does it constitute an unreviewee safety / environmental guestion? O YES @ NO)

Change "RX 36" to "RX 40" on the following pages and lines:

PAGE LINE 3

5,10,11,t2,13 and 20 7

Table 2 under RADIONUCLIDES /HIGH RANGE SYSTEMS, and under PARTICULATES/HIGH RANGE SYSTEM.

23 16,19 and 33 24 Figure 3 in upper left corner l

25 3 and 25 e

t 9

26 1

l 27 10,12 and 18 28 11 and 1st. line of foot note 29 20,21,22 and 28 30 15,17 and 34 31 13 and lines 1 and 4 of foot note 32 1,13 33 7,29 36 21 37 9

38 last line 40 Channel No. Designator R en ser enenes:

Designation "RX 36" inadvertantly used vice "RX 40" in initial write up of procedure.

l t

ff W A

3 -1 r-n (e

n

_ f

~

<., ~,

o-r e.4.t..utr4.ution 6 td, controi no

.n. h A s.o o. ors.r..

irec a ns gg = instai outrsoution er:

Distributed To: O contml Room C others yh 7/M ll o.t. n.ceiv ny aci e.,t controi A29/s H5 l

a-.

14.

esac R

e..na,=,. M.n w. o no r

n r.eviour o.se Rj ."aae~*uaw C D - O O O

"'"". O = 0 =

g,,,

'o u

% To w w en.nesO

===am waa===a O g3 Action TamentRomer.s.

.W DISTRIBUTION:

0

  • 4*"* %

O can.

a====

aaaaa=' =aa i

'r 69-10709-1 8/82 (50)

PACIFIC GAS AND ELECTRIC COMPANY PAGE 2 0F 2

DIABLO CANYON POWER PLANT

[)

l PROCEDURE ON-THE-SPOT CHANGE CONTINUATION SHEET PROCEDURE NO.

EP RB-12 REV.

O PROPOSED CHANGE / REASON FOR CHANGE:

PAGE LINE f

43 Once in RADIOI0DIDES and twice in PARTICULATES 48 20 57 Third System 62 13,16,35 and 42 l

63 6,24 and 25 l

64 Twice in figure 1-7 65 Titles for Figures 1-8A and 1-8B 69 2,3,8,19 and 20 70 7,8 and 16 I..)

l l

l l

l

l

/

1.-

F(Hr.mtE Pacific Gas and Electric Company

'W8ER EP G-3 a

REVISON 2 DEPARTMENT OF NUCLEAR PLANT OPE?.ATONS DATE 2/01/83 DIABLO CANYON POWER PLANT UNIT NO(S) 1AND2 PAGE 1 OF g EMERGENCY PROCEDURE N

NOTIFICATION OF OFFSITE ORGANIZATIONS

\\

APPROVED

~PLANTMANAGE@

DATE SCOPE This procedure describes the steps to be taken to provide both the initial and follow-up notifications to Federsi, State, Local, and Company off-site i

emergency organizations following the initiation of one of the four classes of Emergency Action Levels as described in EP G-1 " Accident Classification and Emergency Plan Activation."

Notification of off-site organizations which would respond on-site to specific emergency situations, (security threat, personal injury or fire) i are discussed in the individual procedures dealing with those specific types of emergencies. If required, requests for this assistance receive priority over notification calls.

GENERAL 1.

Notification of San Luis Obispo County stould be made within 15 minutes fer the Unusual Event classification and sooner (consistent with the need for other emergency actions) for other classes. This time is measured from tse time at wnich the Shift Foreman recognizes that events have occurred which make declaration of an emergency appropriate.

2.

Offsite emergency organizations which require prompt notificaticn in an emergency situation are listed on Form 69-10298 " Required Offsite l

Organization Call List. The agencies are listed in the order in which the notifications should be perfcevd. The initial contact with an off-site agency should provide as 62iiinformation concerning the state of the emergency as is available at the time the notification is made, Form 69-10581 " Initial Emergency Notification Form" is provided l

l as a guide to be used in providing the initial notification of an emergency.

It is important that the initial notification of off-site support organizattens be made promptly and with as much pertinent information as is available.

It should not be delayed if all the information contained on Form 69-10581 is not tienediately available.

Figure 1 " San Luis Obispo County Protective Action Zones and Sectors from Plant" and Table 1 "PGardE Recoinnet.ded Initial General Public

(

DC0042 IXI

.m.

.1...

..__e__

l EP G-3 DIABLO CANYON POWER PuMT UNIT NO(S) 1 AND 2 NUMBER 2/41/83 DATE 2

5 3

o PAGE OF TITLE:

NOTIFICATION OF 0FFSITE ORGANIZATIONS Protective Action Criteria" are provided to assist in detemining appropriate protective actions to reconsnend for the general public.

Refer to EP R-2 " Release of Airborne Radioactive Materials" for additional protective action exposure criteria.

3.

Followup status reports should also consider including the information that is appropriate on Fom 69-10262 " Radiological Emergency Status j

Form, Fom 69-10295 " Plant Status Emergency Fom" and Form 69-10296 Onsite/Offsite Radiological Field Monitoring and PIC Emergency Status Fom," where such infomation is requested and not available to the organization by electronic data trarsmission.

4.

All notifications and contacts with off-site emergency organizations made throughout the course of the emergency should be recorded on Fom 69-10298 " Required Offsite Organization Call List" or use Fom 69-9221

" Emergency Notification Record" or similar log.

5.

Primary position holders of certain emergency response positions are provided with VHF radio-equipped company vehicles. Because these persons are essentially on-call at all times, use of these vehicles is warranted in off hours to ensure rapid consnunication and response.

These personnel are identified in Attachment 3 and in the call list 1) for on-site personnel in G-2.

6.

Per Operating Procedure' 0-4 " Operating Order (1-Hour Reporting Requirements to the NRC)" use of any emergency procedure which requires declaration of any emergency condition becomes a " Reportable Significant EvenV and must be reported to NRC headquarters within one hour.

The Shift Foreman will follow Operating Procedure 0-4 and its check list for unusual events. The Site Emergency Coordinator will assure that the required reporting is accomplished for alert or higher l

conditions.

INITIATING CONDITIONS Notification of off-site emergency organizations shall be initiated by the Shift Foreman when he declares an Unusual Event, Alert, Site Area Emersency, or General Emergency in accordance with EP G-1, " Accident Classification and Emergency Plan Activation."

IM'1EDIATE ACTIONS 1.

Upon declaration of an unusual Event, the Shift Foreman, or his designated representative, shall man a telephone in the Control Rcom and proceed to contact off-site organizations.

J DC0042 2XI

~

M P G-3 DIA8LO CANYON POWER PLANT UNIT NO(S) 1 AND,2 REVISCN2 DATE 2/41/83 PAGE 3 OF 5 N

NOTIFICATION OF OFFSITE ORGANIZATIONS,

2.

Upon declaration of an Alert, Site Area Emergency, or General Emergency, the Shift Foreman acting as the interim Site Emergency Coordinator shall appoint an interim Emergency Liaison Coordinator to perform the initial contact of off-site organizations initially from the Control Room and then from the Technical Support Center (TSC).

3.

The San Luis Obispo County Emergency Plan provides that the Sheriff i

will make notifications to the United States Coast Guard (USCG). The situ: tion at the plant requires imediate protective actions on the part of the general public, and the County Emergency Organization has not had time to be activated, the plant should notify the USCG to place them on standby.

In the event a site area emergency (with reconnendation for evacuation) or general emergency is declared and l

the reconnendation for protective action is made within 30 minutes of

?

l the initial notification of the emergency condition.

the l

Shift Foreman or the Interim Emergency Liaison Coordinator will call l

the 24-hour USCG (Marine Safety Office) phone 415/437-3073 and alert i

them to PGandE's reconnendations for protection actions. The USCG should also be infonned that San Luis Obispo County has been informed of the reconnendations and will be calling with a request for assistance with the offshore areas in the vicinity of the plant.

SUBSEQUENT ACTIONS 1.

A verbal sunnary of actions taken to close out an Unusual Event shall be provided each organization notified by the Site Emergency Coordinator or his designated representative.

2.

Innediate notification of a change in emergency classification or change in the potential for a rslease shall be made to San Luis Obispo County. Status updates should be provided approximately every 15 minutes to each organization, for an Alert or higher classification, until the EOF and TSC are manned.

i DC0042 3XI

  • w-

+w m

NUMmEn EP G-3 mAaLO CMON PCMER PLANN NOUB) 1 AND 2 REVWCE2 DATE 2/01/83

)

PAGE 4 OF 5

.j N

NOTIFICATION OF OFFSITE OR,GANIZATIONS I

3.

When personnel are available the TSC will be activated for an Alert or highee classification according to EP EF-1, " Activation of the Techni:a1 Suppcrt Center." The Emergency Liaison Coordinator shall man his post in the TSC Operations Center and assume responsibility for contact with off-site emergency organizations from the person in the Control Room.

4.

Status updates to San Luis Obispo County will be provided by the EOF once it is manned in accordance with Emergency Procedure EF-3

" Activation of the Emergency Operations Facility." Updates to California OES and NRC will continue from the TSC until these organizations establish their own connunication channels and no longer need status reports.

g{: Changes in emergency classification or infomation on the esumated potential for time of or extent of a release will be inimediately provided to offsite organization when authorized.

5.

Status reports to other organizations on Form 69-10298 are only required as detemined necessary by the Site Emergrey Coordinator for

~ )

the organization to provide their support function.

ATTACHMENTS 1.

Figure 1 " San Luis Obispc County Protective Action Zones and Sectors from Plant" 2.

Fom 69-10298 " Emergency Offsite Organization Call List" 3.

Mobile Phone and Pager Instructions 4.

Form 69-10581 " Initial Emergency Notification Form" 5.

Fom 69-9221 " Emergency Notification Record" 1

6.

Fom 69-10262 " Radiological Emergency Status Fam" 7.

Fom 69-10295 " Plant Status Emergency Fom" 8.

Form 18-10296 "Onsite/Offsite Radiological Field Monitoring and PIC Emergency Status Form" DC0042 4XI

NumeER EP G-3 OLAaLO CANYON POWER M. ANT UNIT AS) 1 AND 2 REwsCN2 QATE 2/01/83 PAGE 5 oF 5 N:

NOTIFICATION OF OFFSITE ORGANIZATIONS,

SUPPORTING PROCEDURES EP G-1, " Accident Classification and Emergency Plant Activation" EP EF-1, " Activation of the Technical Support Center" EP EF-3, " Activation of the Emergency Operations Facility EP R-2, " Release of Airborne Radioactive Materials" OP 0-4, " Operating Order (1-Hour Reporting Requirements to the NRC)"

I I

l

(

DC0042 SXI

,--:-----,,..._m.--,m_..

.-_m__ _ -., _.-, _. _,. -

..,,._-_-__,y._

TABLE Page 1 1

PG and E Recommended Initir.1 General Public Protective Action Criteria Emergency g

Releasg Site Appr priate Recommended 3

4 Classification Status Boundary Dose Initial Protective Action B-Alert All NA None C-Site Area Emergency All

<500 mR (Total W.B.)

None B-Potential Release

>500 mR (Total W.B.)

C-Evacuate transients (Montana de Oro Visitors, agricultural workers, etc.) in the low population zone (PAZ's 1 and 2) starting with the affected sector and two

.i adjacent sectors.

C-Inuninent Release B-Evacuation of the Site, and or PAZ 1.

D-Release is Occuring E-Release has Occured but None stopped D-General Emergency A-No Release NA D-Evacuate the site and low or population zone (PAZ's I and 2)

D-Potential Release starting with the affected sector and two adjacent sectors. Alert the public in the basic emergency planning zone using the Early Warning System Sirens and EBS Broadcasts.

D-General Emergency C-Imminent Release NA D-(as above) and shelter or personnel in the affected D-Release is Gccuring sector and two adjacent sectors or to the boundary of the Basic E-Release has Occured but EPZ. Specify a further stopped distance from the plant if a total dose >500 mR is projected at further distances.

1.

Refer to item 6 of Form 69-10581.

2.

Refer to item 4 of Fom 69-10581.

3.

Calculate in accordance with EP R-2.

4.

Refer to item 8 of Fom 69-10581.

DC0042 SI

l d

I. '

S

  • (,,

'\\

, y

\\

N>

\\ ~ '

'p.'

h

/

4B480 S

Vd

~

t.lst of P g{h e

1 i

.. M,i Wl 2004 ge f

~

p td M a

..n

,, x g

w 7

-s[#

\\r somS * ~. '

@ s-'

: ", c l:::'--

\\

gg l*

/

o iv

}/

i @ COW c-

s. s ;,,,,

N.yj 1

n

l aa R,

I

~

k @'

~

su,s oa*

www s

d u

x c'

et u.gh.

gq wp'* 5" "**"*

,,,,,,,s,

'N,T' I

=

, \\

W L

f

,W

~

.p.

".e-

\\. $ *,* I-*.- -

s

(

e p

me.e=-,- 4

  • ****I p***.*~.3, I o, n Ada' o

nn i

c,

'*d"*

g$w

~

s j

=_. -

\\@-'"",.-cO:C~ U I

'" ~

se i e :=~

-pw:

\\,

[

3

,~

f z

l 1

I @ :" d.

gw 4

c.** "c,",._ _s-

".'.N*N, 4***,

1

'n as.

h'*",.-gc, Q; t,

y

~

e 4

G T

    • t g$$ **' #

sse N'gf#a..

k#

e

,apre s

M**

scaw a" # 'a g

    • "[J us *.e******#

O p Sp#

ap p.n.I g,,s tangses tpe* ***,,, e swa"" #

u I

,,,, ss CW88**

.k

,,, i - g

,,g

-?

s.**8 pas 888*#,s,tWap*M, -=,f a***,,,,,

i. IJ

\\

om %",

o

.I p.->

l.

j

'%~,

i hAME PLANT N'UM8ER_S_)

l NOTIFY NRC REGION V[ WALNUT CREEK, CA.

1415 943-3700 IF UNAG E TO hEACH RESIDENT INSPECTOR

' NOTIFY ONL Y IN CASE gugigAL OF RADIOACTIVE RE-

1. 549 3141(NORMAL LEASE INTO THE OCEAN HRS.ONLYI

/SEE EAfERGENCY PRO-

2. REQUEST CALIFORNIA

~

CEDURE R 31 0FFICE OF EMERGENCY f

5. CAL REG:0N AL WATER SERVICES TO PERFORM NOTIFICATION (OFF QUALITY CONTROL BD.

f I

NORMAL HOURS)

! CENTRAL COAST REGION EXECUTIVE OFFICER SEF NO.3 AB0VE TO

+

!f SAN LUIS OBISPC CALL NO TIFY ONL Y FOR AN ALER T OR HIGHER CLASSIFICA TION l____.-_.---------------

i 6. INSTITUTE OF 'JUCLEAR 3

POWER OPERATIONS g

LE AVE MtuAGE WITH n

A,O 3 _, }

AUTOMATIC ANSWERING

$a

\\

SERVICE t0FF-NORMAL EMERGENCY RESPONSE CENTER HOURS) v O A,D A

.i i

NOTIFY ONL Y IF TECHNICAL,0N SITE OR MA TCRIALS ASSISTANCE ON REACTOR SYCTEMS IS NFEDED INITlAL PROVIDE PLANT EAIERGENCY NUAfBER lu.

~ FQR REPL Y. NOTicY ONE WESTINGHOUSE l _

CONTACTONLY USING THE BELOWLISTIN THE ORDER SHOWN.

I. W'ESTINGHOUSE 7

TITLE NAME OFFICE /HOME/HOME HOT LINE ELECTRIC COMPANY RON BUCHHOLZ (

]

1. SITE SERVICES MANAGER

~

NOTE: UNLESS OTyERWISE INDICATED, ALL PHONE NUUSERS BELOW ARE IN ARE A CODEg

'l

2. OPERATING PLANT GIL KU8ANSEK

~ - ~ ~

?

l REGIONAL MANAGER 1st ALTERNATE RICK PEREZ 2nd ALTERNATE JIM REA

3. SERVICE RESPONSE MANAGER B08 STOKES f

1st ALTERN ATE JOHN MILLER 2nd ALTERNATE DAVE CAMP 8 ELL l

4. EMERGENCY RESPONSE TOM ANDERSON DIRECTOR S. EMERGENCY RESPONSE RON LEHR j

DEPUTY DIRECTOR

8. EMERGENCY NEWS MIKE MANG AN COMMUNICATIONS g

l

Page 1 of 1 ATTACHMENT 3 RECOVERY MANAGER MOBILE PHONE AND PAGER INSTRUCTIONS 1.

Mobile Phone Instructions Recovery Manager's mobile radio telephone number: [

) ^'

a.

Dial "0" for operator and ask for the Mobile Conference Operator; then give the phone number and general location of automobile.

When calling from within General Office, dial 7010 and ask PGandE

~

operator to connect with PT&T operator and repeat as above.

2.

Pager Instructions--Nuclear Power Generation a.

Message to be left with the General Office Communications PBX Operator (short tone):

Call "

.nd request that the particular indi-viduaT/beepei cvue be paged. Leave message with operator for the individual you are paging. The Communications PBX Operator will activate the radio pager for that individual by dialing the unique PT&T number (50 mile radius of San Francisco) pager or the extended coverage PT&T number (if in San Luis Obispo area) assigned to that pager.

b.

-Message to be left with the Intrastate Radio-Telephone Commercial

(,

Message Operator (long tone):

r-

"' nd request that the particular beeper code Callgi a

s be paged. Leave message with operator for the individual you are paging.

c.

If you want both short and long tones to be paged for one beeper, you may request the operator in Step 2.a above to pass the message to the operator in Step 2.b above, or vice-versa. Both operators are capable of paging in either tone. The type of tone denotes where the person being paged is to call to receive his message (s).

Unique Extended Coverage d.

Name Beeper Code PT&T Number PT&T Number J. D. Shiffer J. D. Townsend I

i i

DC0042 61V

i 69-10581 1/83- (100)

Page 1 of 2 PACIFIC GAS AND ELECTRIC COMPANY NUCLEAR PLANT OPERATIONS

/_

DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 INITIAL EMERGENCY NOTIFICATION FORM Date

/

/

Time AM/PM Status #

(Form Completed)

(Number Sequentially)

Person Authorizing Report (DCPPOnly)

Site Emergency coordinator Data Sheet Completed By (DCPPOnly)

Identify yourself, state the call is to provide initial notification of an emergency condition at Diaolo Canyon Power Plant, and provide the following infonnation:

1.

D* scribe what happened:

2.

Unit Involved [AJ 1 LB] 2 Time incident started AM/PM 4.

Situation Involves

[AJ No Release

[C]ImminentRelease

[E]Releasehasoccurred,

[B] Potential Release

[0] Release is Occuring 5.

Offsite Assistance Fire (Cal. Dept. of Forestry)

A[Hasbeenrequested Medical (SLO Ambulance / French Hospital)

Has been requested Law Enforcement (SLO County Sheriff)

Is/has been requested 6.

Emergency Classification - Provide standard message or modify as required by the situation. Note any modification made.

Message Classification (for SLO County / Calif. OES)

[A]

Unusual Event Notification of key emergency organization personnel is l

required at this level, but no further response is necessary.

(B]

Alert Notification of all emergency response organizations and i

activation of the EOC and other response centers is required.

I' PGandE is activating the EOF.

i s

DC0042 8VI

< +. -

, +-

-e._

,.--------#,.,-,_.,v, v.

y

,---r

69-10581 1/83 (100)

Page 2 of 2 PACIFIC GAS AND ELECTRIC COMPANY NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2

)

Message Classificaton (for SLO County / Calif. OES)

[C]

Site Area Emergency

'Innediate mobilization of emergency (Consider protective actions response personnel is required.

[B]or[C])

PGandE is activating the EOF.

[D]

General Emergency Imediate mobilization of emergency (Recommendprotectiveaction[D]

response personnel is required.

orLE])

PGandE is activating the EOF.

7.

Affceted sector (check one) - Wind Speed mps (x2.2) =

mph WIND FROM WIND TOWARD AFFECTED DEGREE 5 DIRECTION AFFECTED SECTOR PAZ's (Basic EPZ)'

A'-----------349-11-----------N-------------------S----------

'B' -----------

12-33-----------NNE-----------------SSW--------

I' -----------

34-56-----------NE------------------SW---------

'C'

'D' 57-78-----------ENE-----------------WSW--------

'E' 79-101----------E-------------------W----------

-102-123----------ESE-----------------WNW-----1,2 F

's' _- __-------124-146----------SE------------------NW------1,2 l,Hl -----------147-168----------SSE-----------------NNW-----1,2,5,9


169-191----------S-------------------N-------1,2.5,9

_-_--------192-213----------SSW-----------------NNE-----1,2,5,9 7

~

'l -----------214-236----------SW------------------NE------1,2,4,8


237-258----------WSW-----------------ENE-----1,2,3.4,8


259-281----------W-------------------E-------1,2,3.4,7,8,11


282-303----------WNW-----------------ESE-----1,2.3,6,7,10,11,12

'O'

. __-__----304-326----------NW------------------SE------1,2,12

[P)-----------327-348----------hNW-----------------SSE--------

8.

Recomanded General Public Protective Actions (Refer to Table _1 and Figure 1 of EP G-3)

[A]None

[B] Evacuation of the site, and PAZ 1.

[ Consider notifing U.S. Coast Guard perEPG-3pg.3]

[C] Evacuate transients (Montana de Oro visitors, agriculture workers, etc.)

in the low population zone (PAZ's 1 and 2) starting with the afNcted sector and two adjacent sectors.

LD] Evacuate the low population zone (PAZ's 1 and 2)) starting with the affected sector and two adjacent sectors.

Alert the public in the basic emergency planning zone using the Early Warning System Sirens and EBS Broadcasts. [ Consider notifing U.S.

Coast Guard per EP G-3 pg. 3]

[E] Take actions specified in [D] and shelter personnel in the affected sector and two adjacent sectors in the basic EPZ.

TETATN WII TORM FUR EYERIEVAD.fATTOR - - - - - - - - - - - - - '- -

DC0042 9VI

.m

> ag r -

y w

=.

i I

/

T E

E E

S H

N S

O PS E

R E

TAD S

N N

E 0

V l

I l

G A

D R

R E

ET O

G PN C

A OA E

S L

R S

Tf E

N N

H A R, O

LE I

PW T

O A

R P.

C A

I yF I

A

/

y T

. t

)

NA N

C F

Y Y

O o.

C B

t N

Tu E

NA G

Et R

Mo E

I O

t P

E E

A l

P C

E A

1 E

1 R

EM I

T NO I

TA I

N L

O I

I F

T F

)

A A

0 C

0 I

1 F

(

I T

D 2

N E

8 E

L

/

D L

3 I

AC YC N

N O

E S

1 9

G R

R EP E

96 E

A

~

l

!l1l l

l

i

.69-10262 7/82 (100)

Sheet 1 of 4 PACIFIC GAS AND ELECTRIC COMPANY DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS 1 AND 2 PART A: RADIOLOGICAL EMERGENCY STATUS FORM

~

Provide as much information as is available and appropriate at the time of the status report.

Date:

/

/

Time:

AM/PH Status Rep 9rt #

(Form Completed)

(Number Sequentially)

Person Authorizing Report:

(DCTPonly)

Site Emergency Coordinator Person Transmitting Report:

Location (DCPPonly)

TSC DIST: (9 copies)

EOF DIST:

(10 copies) 1.

Site Emergency Coordinator 1.

Recovery Manager 2.

Emergency Evaluation & Recovery Coord.

2.

UDAC 3.

Emergency Liason Coordinator (2) 3.

Advisor To The County 4.

Emergency Maintenance Coord.

4.

Radiological Emerg., R.M.

5.

Emergency Operations Coordinator 5.

Operations and Analytical, R.M.

6.

Emergency Radiological Advisor 6.

Engineering and Logistics, R.M.

7.

NRC Office 7.

Public Information, R.M.

8.

TSC File S.

Coporate Law Dept. Coord.

9.

TSC Status Board 9.

EOF Status File

10. EOF Emerg. Status Board i

1.

Emergency Classification:

Unusual Event Alert Site Area Emergency General Emergency 2.

Update on Incident: Date

/

/

Time Incident Began:

AM PM l

a.

Site Emergency Signal Sounded YES []

NO []

b.

What Happened:

3.

Radiological Release Information:

(attach isotopic breakdown if available) a.

Time Data Collected:

AM/PM Unit Involved 1

2 b.

Release: _ 0ccurring Anticipated--When:

AM/PM l

c.

Location of Release:

Plant Vent __, Steam Surface Liquid Dch.

d.

Estimated Duration of Release: _ _ Hours DC0042 9V l

69-10262 7/82 (100)

Sheet 2 of 4 DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 e.

Relsase Monitored: by monitors #

f.

Iodine. Est. Total Quantity Ci Release Rate Ci/sec, g.

Particulates: Est. Total Quantity Ci Release Rate Cf/sec, h.

Noble Gases: Est. Total Quantity Ci Release Rate C1/sec, 2

i.

Estimate of Surface C::ntamination:

dpm/100cm Where:

(attach fom 69-10296 for out of plant contamination readings) j.

Unusual Radiation Levels in Plant: Where:

mR/hr:

k.

Radiation Level at site boundary (downwind) mR/hr:

(sector) 1.

Meteorological Date (Use 10m elevation on primary met tower or designate other Scurce

)

m.

Wind Velocity:

m/secx2.2=

mph Direction (from):

deg.

Weather Conditions:

Rain Clear Fog Cloudy n.

o.

Stability:

Class Sigma A (deg):

Delta T:

degrees C/m (10m to 76m or

)

X/Q 800m=

E Mixing Depth m.

n a

p.

Projection Time CENTERLINE (EARS SEU UR C)

DOSE RATE INTEGRATED DOSE DOSE PROJECTIONS PLUME ARRIVAL mR /hr mR AFFECTEI l

(Circle Which)

TIME W.B.

THY W.B.

THY SECTOR 1

l Site Boundary (800m) f 2 Miles (2-5) 6 Miles (5-10) i 10 Miles (10-20)

EARS PLUME CENTER DOSE i

radius 4.

Recomended Emergency Actions / Protective Measures for SLO County or California Department Radiation Health (Provide only new recomendations):

5.

Emergency Response Actions Undemay by PGandE:

6.

Prognosis for Escalation or Temination of Accident:

.)

DC0042 10V

. r

~ 1 -

- ~

'69-10262 7/82 (100)

Sheet 3 of 4 DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT' UNIT NOS. 1 AND 2 PART B: MISCELLANEOUS EMERGENCY INFORMATION FORM Provide as much infonnation as is available and appropriate at the time of the status report.

Date:

/

/

Time:

AM/PM Status #

(Report Completed)

(Number sequentially)

Person Authorizing Repert:

(DCPPonly)

Site Emergency Coordinator Person Preparing Report:

Location (DCPP only)

Time Data Collected AM/PM i

1.

Personnel Injuries: How Many?

a.

Type:

Contamination:

Yes No b.

Injured Person Location:

Plant Ambulance Hospital (which)

Other (where) c.

Ambulance requested Yes No, Location I

2.

Fires:

a.

Location:

Time Reported:

AM/PM b.

Type:

Electrical Fuel (what kind) c.

Contamination Present:

Yes No d.

Fire Assistance Requested:

Yes No e.

Fire Assistance Onsite:

Yes No 3.

Security / Safeguards:

a.

Bomb Threat: Search Conducted:

Yes No Search Results:

Site Evacuated:

Yes _ No b.

Intrusion:

Insider:

Outsider i

Point of Intrusion:

Extent of Intrusion:

Apparent

Purpose:

j DC0042 11V

69-10262 7/82 (100)

Sheet.4 of 4 PACIFIC GAS AND ELECTRIC CDMPANY DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 Part B: Miscellaneous Emergency Information Form c.

Strike / Demonstrations: Size of Group:

Purpose:

d.

Sabotage: Radiological:

Yes No Arson:

Yes No Equipment / Property:

e.

Extortion: Source (phone, letter, etc.):

Location of Letter:

Demands:

f.

General: Firearms Involved:

Yes No Violence:

Yes No Control of Facility Compromised or Threatened:

Yes No

~

Stolen / Missing Material:

Agencies Notified (FBI, State Police, County Sheriff, etc.):

^

(circle agencies onsite) i 4.

Press Informaticn:

~)

Location of Press Release:

San Francisco /

San Luis Obispo i

Other:

(where)

Time of Press Release:

AM/PM News Media Interest:

Yes No Local / National:

Data Received By:

Date:

/

/

Time:

AM/PM l

l RETAIN THIS FORM FOR EVENT EVALUATION l

t l

DC0042 12V 1

e

-_._,y

--___-,--7_--

~__

~69-10295 7/82 (100)

Page 1 of 3 PACIFIC GAS AND CLECTRIC COMPANY DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT-UNIT NOS 1 AND 2 PLANT STATUS EMERGENCY FORM Provide as much infomation as is available and appropriate at the time of the status report.

Date:

/

/

Time:

AM/PM Status Report #

(Fom Completed)

(NumberSequentially)

Person Authorizing Report:

(DCPPonly)

Site Emergency Coordinator Person Transmitting Report:

Location (DCPP cnly)

TSC DIST: 9 COPIES EOF DIST: 10 COPIES 1.

Site Emergency Coordinator 1.

Recovery Manager 2.

Eergency Evaluation & Recovery Coord.

2.

UDA" 3.

Emergency Liaison Coordinator (2) 3.

Advisor To The County 4.

Emergency Maintenance Coord.

4.

Radiological Emerg. R.M.

5.

Emergency Operations Coordinator 5.

Operations and Analytical M.

6.

Emergency Radiological Advisor 6.

Engineering and Logistics M.

7.

NRC Office 7

Public Infomation M.

8.

TSC File 8.

Corporate Law Dept. Coord.

9.

TSC Status Board 9.

EOF Status File

10. EOF Emerg. Status Board 1.

Emergency Classification:

,UnusualEvent [ ] Alert [ ] Site Area Emergency General Emergency i

Time Data Collected:

AM/PM 2.

Plant Status -

Description:

3.

Reactor Status: [] Unit 1

[ ] Unit 2 (Provida a separate fom for the other unit) a.

Power Level: Before

% Current

% Power Range I

amp Int. Range Source Range l

l b.

Fuel Damage: []None

[]Hinor

[] Major 4.

Reactor Coolant System:

l a.

Pressure:

osig Est. RCS Leakage opm. where b.

Loop Status 1

2 3

4 Temp. (hot / cold), F

/

/

/

/

(

Flow 1 DC0042 13V

--e.v---

em-

,w-b

-m

69-10295 7/02 (100)

Page 2 of 3 -

DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT UNIT NOS. 1 AND 2 Plant Status Emergency Form

)

c.

RCP Running: []1 [32 [-]3 []4 d.

Incore Thermocouple (s):

F Hottest, F Average i

e.

Reactor Vessel Level:

f.

Baron Concentration:

ppm g.

Margin to Subcooling:

degrees F h.

RCS Activity Sample Available: []YES Activity.

uci/cc[]NO i.

RV Head Temp. F 5.

Pressurizer:

a.

Level:

I b.

PORV/ Safety Valves: []Open

[] Closed 6.

ECCS:

a.

Operating: [ ] Yes

[]No Letdown Flow, gpm VCT Level, %

b.

Actuation Auto

Man, c.

Cent. Chg. Pun:ps On:

[]1

[]2 Total gpm:

d.

SI Pumps On:

[]1

[]2 Total gpm:

e.

RHR Pumps On:

[]1

[]2 Total gpn:

l RHR Disch. Temp. F.

f.

Accumulators Discharged:

[]YES

[ ] NO g.

Moce: [ ] Inject RWST

% [ ] Recirculation

% Contmt. Level 7.

Containment:

a.

Pressure / Temperature / Humidity:

psig/

F/

dew point b.

Containment Isolation: []Ph.A

[ ] Ph. B c.

Integrity:

d.

Containment Spray Pumps On: []1

[]2 e.

Fan Coolers On: []1

[]2

[]3

[]4

[]5 f.

Rad Monitor:

R/hr (Hi Range)

/

mR/hr(Entry /SealTable)

)

l l

DC0042 14V i

~69-10295 7/82 (100)

Page 3 of 3 PACIFIC GAS AND ELECTRIC COMPANY DEPARTMENT OF NUCLEAR PLANT OPERATIONS DIABLO CANYON POWER PLANT-UNIT NOS. 1 AND 2 Plant Status Emergency Form i

8.

Steam Generators:

a.

Level:

1

% 2

% 3 1 4 b.

Pressure: 1 psig 2 psig 3 osig 4 psig c.

Auxiliary Feedwater Pumps On: [] Turbine []2[]3 Total gpm:

d.

Feedwater Source: []Cond Tk

% [ ] Raw Water

[] Fire Water e.

Steam Dump: [ ] Atm

[] Condenser f.

Safety Valves Closed: []1

[]2

[]3

[]4 g.

MSIV's Closed:

[]1

[]2

[]3

[]4 h.

Est. Primary to Sec. Leakage:

gpm Cooling:

a.

CCW Pumps Flow, gpm: 1 2

3 b.

ASW Pumps On: []1

[]2

10. Electrical:

a.

4KV Bus Energized:

[]F

[]G

[]H b.

Offsite Power Available:

[]YES

[]N0 c.

Diesel Generators On:

[]1

[]2

[]3

11. Other Information:

l j

l l

Data Received By:

Date

/

/

Time AM/PM RETAIN THIS FORM FOR EVENT EVALUATION

)

i DC0042 15V

0 Fcre. -10296 9/81(100)

States i Data:

/

/

Part 2: Onsits/0ffstta Radiolgical Flaid Monittring and PIC Emergency 5tctus Fern Sheet W k...,, 4_

Location Time Data Collected 4.m.

C.R.

a.m.

4.m.

a.m.

a.m.

p.m.

p.m.

p.m.

p.m.

p.m.

p.m.

Team R/hr R/hr R/hr R/hr

_R/br

_R/br.

PIC cpm 3

cpm 3

cpm cpa 3

cgmi 3

cpm 3

e l

pC1/cg pC1/cg 901/

pCl/cq pC1/cg

_pCl/cq l

pCi/m pct /m' 901/

pCl/m' pCl/m'

~ Cl/m' p

pC1/gm 901/gm 90t/gm pC1/gm pCl/gm pCi/gm

-~

a.m.

a.m.

s.m.

a.m.

a.m.

a.m.

p.m.

p.m.

p.m.

p.m.

p.m

  • p.m.

Team

_R/hr R/hr

_R/hr

_R/hr

_R/hr

_R/hr PIC cpm 3

cini 3

cpm cpm cpm 3

cgui 3

pCi/cg 90t/cm pC1/ce*

pC1/

pCl/cm 901/cq pCl/m' pC1/m' pC1/m2 pC1/

pC1/m'.

pC1/m' pC1/gm pct /gm pCl/gm

_ptt/gm ecl/gm pCl/p a.m.

4.m.

a.m.

4.E.

5.m.

8.m.

p.m.

p.m.

p.m.

p.m.

p.m.

p.m.

Team

_R/br

_R/hr

_R/hr

_R/hr

_R/hr

_R/hr h

Plc cpm 3

cgui 3

cpu cgia 3

cpm 3

cpm 3

pCl/cq pCl/cq pct /

pct /cg pCl/cm pC1/cg pct /m' pCl/m' pC!/

pCl/m' pCf/m' pCl/ac sci /gm oC1/gm pCl/gm oC1/gm oC1/gm oc1/gm 5.m.

a.m.

a.m.

a.m.

4.m.

a.m.

p.m.

p.m.

p.m.

p.m.

p.m.

p.m.

' Team

_R/hr

_R/hr

_R/hr

_R/hr

_R/hr

_R/hr PIC cpm

_ cpu 3

cpm 3

clui 3

cpm 3

cini 3

a.C1/

pct /

~

pCl/cg 90t/cq pCi/cq J t/cg pCI/cg pct /m' pCi/nf pct /s' pct /m' pct /m' pC1/gm pCI/gm 9Ct/gm pC1/gm pCl/p pci/gn a.m.

a.m.

a.m.

a.m.

a.m.

a.m.

p.m.

p.m.

p.m.

p.m.

p.m.

p.m.

Team

~

_R/hr

_R/hr

_R/hr

_R/hr

_A/hr

_R/hr PIC cpm 3

cpm 3

cp 3

cpm 3

cgia 3

cgmi 3

pC1/cg 90t/cm pC1/cq pC1/cg ati/c3 901/cq l

pC1/gm 90t/m2 oC1/s pC1/m 901/m' cI/m' pC1/m' c

s pCl/gm pCl/gn pCi/gm pCl/gm pCl/gm i*DataTransmittedRy:

DISTRIBUTION LIST TSC Dist. (5)

EOF Dist. (6)

EOF Status File

21::" '""' "'.ud '"* T site t-rs C-rd-a

=r-cor c-rs stat > Rd-a Emerg. Rad. Advison-Rad. Emerg. Rec. Mgr.

TSC File UDAC TSC Status Bd.

Adv. To County -Emerg. Org.