Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML101160140 + (10:29:07, 14 January 2025)
- Press Release-IV-10-018, NRC to Hold Open House to Discuss 2009 Performance of Callaway Nuclear Plant + (10:29:08, 14 January 2025)
- ML101160135 + (10:29:08, 14 January 2025)
- ML101160106 + (10:29:09, 14 January 2025)
- ML101160095 + (10:29:10, 14 January 2025)
- ML101160078 + (10:29:11, 14 January 2025)
- ML101160053 + (10:29:11, 14 January 2025)
- ML101160047 + (10:29:14, 14 January 2025)
- ML101160042 + (10:29:15, 14 January 2025)
- RNP-RA/10-0031, Report of Changes Pursuant to 10 CFR 50.59, Between April 1, 2008 and April 1, 2010 + (10:29:16, 14 January 2025)
- 05000261/LER-2010-001, For H.B. Robinson, Unit 2, Regarding Emergency Diesel Generator Inoperable in Excess of Technical Specifications Completion Time Due to Output Breaker Failure + (10:29:20, 14 January 2025)
- 05000382/LER-2010-002, For Waterford 3, Regarding Main Feedwater Isolation Valve B Exceeded Allowed Outage Time Due to Tubing Connection Failure + (10:29:26, 14 January 2025)
- ML101160035 + (10:29:28, 14 January 2025)
- 05000269/LER-2010-001, For Oconee, Unit 1, Regarding Standby Shutdown Facility Letdown Line Orifice Strainer Blocked by Valve Gasket Material + (10:29:32, 14 January 2025)
- 05000318/LER-2010-002, For Calvert Cliffs, Unit 2, Regarding Reactor Coolant System Pressure Boundary Leakage in Valve Leakoff Line Weld + (10:29:35, 14 January 2025)
- TSTF-10-07, Transmittal of TSTF-493, Revision 4, Errata, Clarify Application of Setpoint Methodology for LSSS Functions + (10:29:36, 14 January 2025)
- NRC 2010-0068, Revision to License Renewal Regulatory Commitment 29, Reactor Vessel Lnternals Program Implementation + (10:29:39, 14 January 2025)
- BYRON 2010-0034, Annual Dose Report for 2009 + (10:29:40, 14 January 2025)
- ML101130540 + (10:29:41, 14 January 2025)
- ML101130536 + (10:29:42, 14 January 2025)
- ML101130528 + (10:29:43, 14 January 2025)
- ML101130526 + (10:29:44, 14 January 2025)
- ML101130520 + (10:29:45, 14 January 2025)
- ML101130511 + (10:29:45, 14 January 2025)
- ML101130510 + (10:29:46, 14 January 2025)
- ML101130497 + (10:29:47, 14 January 2025)
- L-PI-10-035, Supplement to License Amendment Request for Measurement Uncertainty Recapture - Power Uprate, Withdrawal of Proposed Change to Analysis Methodology for Pressure Temperature Limits Report + (10:29:48, 14 January 2025)
- ML101130451 + (10:29:48, 14 January 2025)
- RA10-019, Annual Dose Report for 2009 + (10:29:49, 14 January 2025)
- ML101130445 + (10:29:50, 14 January 2025)
- ML101130444 + (10:29:51, 14 January 2025)
- ML101130443 + (10:29:52, 14 January 2025)
- IR 05000424/2010301 + (10:29:53, 14 January 2025)
- ML101130417 + (10:29:54, 14 January 2025)
- ML101130402 + (10:29:55, 14 January 2025)
- ML101130393 + (10:29:56, 14 January 2025)
- ML101130372 + (10:29:58, 14 January 2025)
- ML101130371 + (10:30:00, 14 January 2025)
- RS-10-080, License Amendment Request Regarding Reactor Coolant System Pressure and Temperature Limit Curves + (10:30:01, 14 January 2025)
- ML101130368 + (10:30:02, 14 January 2025)
- ML101130362 + (10:30:02, 14 January 2025)
- ML101130351 + (10:30:03, 14 January 2025)
- ML101130336 + (10:30:04, 14 January 2025)
- RA10-022, Cycle 14 Startup Test Report Summary + (10:30:05, 14 January 2025)
- ML101130329 + (10:30:08, 14 January 2025)
- ML101130328 + (10:30:10, 14 January 2025)
- ML101130322 + (10:30:11, 14 January 2025)
- ML101130303 + (10:30:12, 14 January 2025)
- ML101130262 + (10:30:14, 14 January 2025)
- ML101130256 + (10:30:15, 14 January 2025)
- ML101130255 + (10:30:16, 14 January 2025)
- IR 05000289/2010002 + (10:30:18, 14 January 2025)