Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080P103 + (13:53:40, 14 December 2024)
- 05000373/LER-1983-106-03, /03L-0:on 830830,blowdown Flow Recorder Found Reading Low.Caused by Entrapped Air in Transmitter Sensing Lines.Air Removed & Lines Vented + (13:53:42, 14 December 2024)
- 05000280/LER-1984-002-02, :on 840118,control Room Indications & Annunciators Behaved Erratically Due to Voltage Spike.Caused by Cable Falling Out of Breaker Due to Loose Screw.Cable Reconnected + (13:53:44, 14 December 2024)
- ML20080P090 + (13:53:45, 14 December 2024)
- ML20080P093 + (13:53:45, 14 December 2024)
- ML20080P088 + (13:53:46, 14 December 2024)
- ML20080P082 + (13:53:46, 14 December 2024)
- ML20080P079 + (13:53:47, 14 December 2024)
- ML20080P077 + (13:53:47, 14 December 2024)
- ML20080P074 + (13:53:48, 14 December 2024)
- ML20080P067 + (13:53:48, 14 December 2024)
- 3F0295-14, Submits Summary Description of Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.W/One Oversize Drawing + (13:53:49, 14 December 2024)
- ML20080P056 + (13:53:49, 14 December 2024)
- TXX-4108, Deficiency Rept SDAR-126 Re Defective Diesel Generator Engine Push Rods.Defective Push Rods Will Be Removed & Scrapped & Replacements Requisitioned & Installed Before Operation + (13:53:50, 14 December 2024)
- B11016, Forwards Schedule of Meetings to Resolve 831220 Draft SER Open Items.Schedule Will Be Supplemented as Necessary to Support Development of Remaining NRC SER Input + (13:53:51, 14 December 2024)
- ML20080P048 + (13:53:51, 14 December 2024)
- B15131, Submits Suppl to Original Request Made by Util on 941208 Re Change to Alternate Testing Method of Approved Relief Requests + (13:53:52, 14 December 2024)
- 05000370/LER-1983-043-03, /03L-0:from 830627-0707,during Isolation Valve Leak Rate Test,Penetrations M259,M322,M327,M330 & M385 Failed to Meet Tech Specs.Caused by Authorized Mods & Component Malfunction,Respectively + (13:53:54, 14 December 2024)
- ML20080P033 + (13:53:54, 14 December 2024)
- ML20080P030 + (13:53:55, 14 December 2024)
- ML20080P029 + (13:53:56, 14 December 2024)
- ML20080P025 + (13:53:57, 14 December 2024)
- ML20080P020 + (13:53:59, 14 December 2024)
- ML20080P016 + (13:54:00, 14 December 2024)
- ML20080P015 + (13:54:01, 14 December 2024)
- ML20080P014 + (13:54:02, 14 December 2024)
- ML20080P003 + (13:54:03, 14 December 2024)
- ML20080N997 + (13:54:04, 14 December 2024)
- 05000324/LER-1983-082-03, /03L-0:on 830902,suppression Pool Level Exceeded Specs W/Value of -26.25 Inches.Caused by Failure of Operator to Adequately Monitor Level While Instrumentation Out of Svc Due to Plant Mod.Level Returned to Specs + (13:54:05, 14 December 2024)
- ML20080N987 + (13:54:07, 14 December 2024)
- ML20080N988 + (13:54:07, 14 December 2024)
- AECM-84-0066, Advises That Containment,Liner & Penetrations Capable of Withstanding 5 Psid Negative Internal Pressure Due to Hydrogen Combustion,Per NRC Request + (13:54:08, 14 December 2024)
- AECM-83-0630, Responds to 830828 Request Re Reasons for Length of Extended Outage.Substantial Mods to Drywell Cooling Capability Indicated During non-nuclear Heatup.Mods Included Extensive Design & Installation Work + (13:54:08, 14 December 2024)
- ML20080N977 + (13:54:09, 14 December 2024)
- ML20080N970 + (13:54:10, 14 December 2024)
- ML20080N973 + (13:54:10, 14 December 2024)
- BSEP-83-3248, RO Re HPCI Sys,Reported on 830909.Condition Determined Not Reportable + (13:54:11, 14 December 2024)
- ML20080N962 + (13:54:13, 14 December 2024)
- RBG-17-006, Interim Deficiency Rept DR-160 Re Transformer Cable Lead Lugs Supplied by Gould Brown-Boveri.Investigation Continuing.Next Rept Will Be Provided by 840423 + (13:54:13, 14 December 2024)
- ML20080N949 + (13:54:14, 14 December 2024)
- 05000373/LER-1983-108-03, /03L-0:on 830901,during LOS-RH-Q3,RHR a Min Flow Bypass Valve 1E12-F064A Failed to Close.Caused by Broken Tripper Fingers Holding Motor Operator in Handwheel Operation.New Fingers Installed + (13:54:15, 14 December 2024)
- ML20080N945 + (13:54:16, 14 December 2024)
- ML20080N937 + (13:54:17, 14 December 2024)
- 05000397/LER-1984-003, :on 840120,during Initial Low Power Physics Testing,Intermediate Range Monitors A,B & D Did Not Respond to Increasing Neutron Flux,Causing Reactor to Be Shut Down. Caused by Personnel Error + (13:54:19, 14 December 2024)
- ML20080N931 + (13:54:20, 14 December 2024)
- ML20080N924 + (13:54:21, 14 December 2024)
- ML20080N927 + (13:54:21, 14 December 2024)
- ML20080N923 + (13:54:22, 14 December 2024)
- 05000373/LER-1983-107-03, /03L-0:on 830901,w/unit Shutdown for Planned Outage,Determined That Valve Leakage Rate Limits Exceeded.In All Cases at Least One Isolation Valve in Piping Line W/Acceptable Leakage Rate + (13:54:23, 14 December 2024)
- ML20080N910 + (13:54:24, 14 December 2024)
- ML20080N908 + (13:54:25, 14 December 2024)