Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080R903 + (13:35:59, 14 December 2024)
- ST-HL-AE-1055, Final Deficiency Rept Re Reactor Vessel Core Support Tolerance.Initially Reported on 830726.Evaluations Disclosed That out-of-levelness Condition on Reactor Vessel Support Ledge Not Reportable Per 10CFR50.55(e) + (13:35:59, 14 December 2024)
- ML20080R892 + (13:36:00, 14 December 2024)
- ML20080R878 + (13:36:02, 14 December 2024)
- 05000328/LER-1984-002-04, :on 840127,high Radiation Alarm Actuated, Causing Containment Ventilation Isolation to Occur.Caused by Inadvertent Voltage Spike.Alarm Reset & Monitor Returned to Svc + (13:36:03, 14 December 2024)
- ML20080R875 + (13:36:04, 14 December 2024)
- ML20080R874 + (13:36:05, 14 December 2024)
- ML20080R867 + (13:36:05, 14 December 2024)
- ML20080R866 + (13:36:06, 14 December 2024)
- ML20080R861 + (13:36:07, 14 December 2024)
- ML20080R851 + (13:36:08, 14 December 2024)
- ML20080R854 + (13:36:08, 14 December 2024)
- ML20080R848 + (13:36:09, 14 December 2024)
- ML20080R846 + (13:36:10, 14 December 2024)
- ML20080R844 + (13:36:11, 14 December 2024)
- ML20080R843 + (13:36:12, 14 December 2024)
- ML20080R841 + (13:36:12, 14 December 2024)
- AECM-84-0050, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/83-53.Corrective Actions:Candidates Who Passed Exam Will Be Required to Complete Addl Qualification Card Prior to Assuming Licensed Duties + (13:36:13, 14 December 2024)
- ML20080R839 + (13:36:14, 14 December 2024)
- AECM-84-0044, Suppls Response to NRC Re Violations Noted in IE Insp Rept 50-416/83-30.Corrective Actions:Mncr 714-83 Initiated to Resolve Generic Issue of Banana Test Jacks & Safety Evaluation Performed + (13:36:15, 14 December 2024)
- ML20080R834 + (13:36:15, 14 December 2024)
- ML20080R830 + (13:36:16, 14 December 2024)
- ML20080R829 + (13:36:17, 14 December 2024)
- ML20080R827 + (13:36:18, 14 December 2024)
- ML20080R824 + (13:36:19, 14 December 2024)
- 05000369/LER-1984-001-03, :on 840109,valve Support Clamp Found Removed & Support Moved from Normal Position Under Valve 1KC-51A.On 831016 & 1021,tour Pipe Support Restraints Found Removed. Caused by Unauthorized Removal + (13:36:20, 14 December 2024)
- AECM-84-0067, Suppls Response to NRC Re Violations Noted in IE Insp Rept 50-416/83-30.Corrective Actions:Mncr 714-83 Initiated to Resolve Generic Issue of Banana Test Jacks & Safety Evaluation Performed + (13:36:22, 14 December 2024)
- ML20080R820 + (13:36:22, 14 December 2024)
- ML20080R817 + (13:36:23, 14 December 2024)
- ML20080R815 + (13:36:23, 14 December 2024)
- ML20080R813 + (13:36:25, 14 December 2024)
- ML20080R797 + (13:36:26, 14 December 2024)
- ML20080R807 + (13:36:26, 14 December 2024)
- ML20080R791 + (13:36:27, 14 December 2024)
- ML20080R790 + (13:36:28, 14 December 2024)
- 05000361/LER-1984-003-01, :on 840122,containment Purge Isolation Sys Actuated When Gaseous Activity Alarm Setpoint Reached Train a Containment Airborne Monitor 2RT7804.Caused by Increase in Containment Background Radiation + (13:36:29, 14 December 2024)
- ML20080R787 + (13:36:33, 14 December 2024)
- ML20080R785 + (13:36:34, 14 December 2024)
- ML20080R786 + (13:36:34, 14 December 2024)
- ML20080R780 + (13:36:35, 14 December 2024)
- ML20080R778 + (13:36:36, 14 December 2024)
- ML20080R773 + (13:36:36, 14 December 2024)
- ML20080R767 + (13:36:37, 14 December 2024)
- RC-95-0058, Application for Amend to License NPF-12,requesting Discontinuation of Seismic Monitoring Network + (13:36:37, 14 December 2024)
- ML20080R756 + (13:36:38, 14 December 2024)
- 2CAN028406, Notifies That Final Results of Fuel Insp Will Not Be Submitted Until 840330 Due to Addl Time Required for Compilation of Results + (13:36:39, 14 December 2024)
- ML20080R753 + (13:36:39, 14 December 2024)
- 05000298/LER-1984-001, :on 840120,reactor Vessel Water Level Indicating Switch NBI-LIS-101B Failed to Reset When Simulated High Level Signal Removed.Caused by Component end- of-life.Microswitch Replaced + (13:36:41, 14 December 2024)
- ML20080R743 + (13:36:42, 14 December 2024)
- ML20080R737 + (13:36:43, 14 December 2024)
- NRC-84-0035, Forwards Responses to Instrumentation & Control Sys Branch Issues Identified During Audit of Facilities,Covering Automatic Test & Indication Sys & Boron Dilution Mitigating Sys + (13:36:43, 14 December 2024)
- ML20080R732 + (13:36:44, 14 December 2024)