Amend 97 to License NPF-62,modifying Plant TS 3.6.1.3, Primary Containment Isolation Valves, by Changing Frequency of Leak Testing for 36 Inch Supply Exhaust CVI Valves
ML20080R791
Person / Time
Site: Clinton 
(NPF-062)
Issue date: 03/06/1995
From: Pickett D
Office of Nuclear Reactor Regulation
To:
Illinois Power Co
Shared Package
ML20080R794 List:
References
NPF-62-A-097 NUDOCS 9503100080
Download: ML20080R791 (4)


Text

-.

,~

^~

ed.

y S.

I i:7 1*

'EL

- UNITED STATES '

3; i!

NUCLEAR REGULATORY COMMISSION

'g

.. [

WASHINGTON, D.C 20555-0001 i

ILLINDIS POWER COMPANY. ET AL.

" DOCKET NO. 50-461-l l

CLINTON POWER STATION.~ UNIT NO. 1 AMENDMENT TO FACILITY ~0PERATING LIU, TEE s

' Amendment No. - 97 j

f License No. NPF-62 l.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment-by Illinois Power Company *. (IP), and Soyland Power Cooperative, Inc. (the licensees) dated June 13, 1994, complies with the standards and requirements of the Atomic Energy Act of-1954, as-

)

amended (the Act), and the Commission's rules and regulations' set forth in 10 CFR Chapter I;-

B.

The facility will operate in conformity with.the application, the:

provisions of the Act :and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by'this amendment can be conducted without' endangering the health and safety of-the public, and (ii)- that such activities will be conducted in compliance with the_ Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to 'he health and safety of. the'public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51'of the Commission's regulations and all applicable requirements have been I

satisfied.

2.

Accordingly, the license is amended by changes to the Technical-Specifi-l cations as indicated in the attachment to this license amendment, and j

paragraph 2.C.(2) of Facility Operating License No. NPF-62 is hereby amended to read as follows:

i

  • Illinois Power Company is authorized to act as agent for Soyland Power Cooperative, Inc. and has exclusive responsibility and control ovcr the physical construction, operation.and maintenance of the facility.

)

4 9503100000 9 PDR ADOCK 0 1

P PDR

~

~

- - - I

r

--- ~.

r

~

(2)

Technical Specifications and Environmental Protection Plan b

The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised' through Amendment No. 97, are hereby incorporated into this -

license.

Illinois Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment.is effective as of its'date.of issuance.

FOR THE NUCLEAR REGULATORY ~ COMMISSION K

v' T

T Douglas V. Pickett, Senior Project Manager Project Directorate III-3 Division of Reactor Projects - III/IV Office of Nuclear Reactor Ragulation

Attachment:

Changes to the Technical Specifications Date of Issuance: March 6, 1995 4

I

,1

/

~

ATTACHMENT TO LICENSE AMENDMENT N0.'97 FACILITY OPERATING LICENSE NO. NPF-62 I

LOCKET NO.'50-461 Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by amendment' number and

- contains vertical lines indicating the area of change.-

t Remove'Paaes-Insert Paaes.

3.6-17 3.6-17 l

l

)

n i

PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENT 5 (continued) l SERVEILLANCE FREQUENCY f

i SR 3.6.1.3.4 Verify the isolation time of each power In accordance operated and each automatic PCIV, except with the MSIVs,-is within limits.

Inservice Testing Program

.SR' 3.6.1.3.5


NOTE------------------

(-

Only required to be met'.in MODES 1, 2, and 3.

Perform leakage rate testing for each Once within 92 5

primary containment purge-valve with days after resilient seals.

opening the valve AND


NOTE------

i SR 3.0.2 is not applicable.

i In accordance 1

with 10 CFR 50,-

Appendix J, as modified by approved exemptions _

SR 3.6.1.3.6 Verify the isolation time of each MSIV In accordance l

is ;t 3 seconds and s 5 seconds.

with the Inservice.

Testing Program j

i l

SR 3.6.1.3.7 Verify each automatic PCIV actuates to 18 months the isolation position on an actual or i

simulated isolation signal.

i (continued) i CLINTON 3.6-17 Amendment No. B5,97 i