Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20082L393 + (11:53:28, 14 December 2024)
- ML20082L383 + (11:53:28, 14 December 2024)
- BECO-LTR-95-042, Forwards 1994 Annual Rept to Shareholders Boston Edison & Securities & Exchange Commission Form 10-K + (11:53:29, 14 December 2024)
- 05000387/LER-1983-150-03, /03L-0:on 831022,while at 100% Power,Reactor Bldg Heating & Ventilation (H&V) Heaters 1E252A,B,C & D Failed to Energize.Manual Initiation Unsuccessful.Zone 1 H&V Sys Shut Down.Caused by Disengaged Pneumatic Line + (11:53:31, 14 December 2024)
- ML20082L369 + (11:53:32, 14 December 2024)
- ML20082L370 + (11:53:32, 14 December 2024)
- ML20082L360 + (11:53:34, 14 December 2024)
- 05000482/LER-1991-012, :from 910730-31,4 H Comparison of Control Rod Demand Position to Digital Position Indication Not Performed.Caused by Personnel Overlooking Four Failed Pulse Counter Cards on 910718.Personnel Counseled + (11:53:36, 14 December 2024)
- NRC-91-0104, Forwards Semiannual fitness-for-duty Rept for Jan-June 1991. One Rept,Per 10CFR26.73,retracted During Reporting Period + (11:53:44, 14 December 2024)
- NRC-91-0088, Forwards Proposed Changes to QA Program Re Assignment of Responsibilities for Procurement Document Review & Receiving Insp.Review/Insp Functions Can Be Effectively Performed W/O in-line QA Functions + (11:53:45, 14 December 2024)
- ML20082L333 + (11:53:45, 14 December 2024)
- HL-4789, Application for Amend to License NPF-5 Re Elimination of Selected Response Time Testing Requirements from TS + (11:53:46, 14 December 2024)
- ML20082L324 + (11:53:47, 14 December 2024)
- ML20082L323 + (11:53:48, 14 December 2024)
- B10950, Interim Potential Significant Deficiency SD-45 Re Design & Const of Emergency Generator Load Sequencers Supplied by Vitro Labs.Initially Reported on 831017.Vendor Performing Engineering Evaluation + (11:53:49, 14 December 2024)
- ML20082L306 + (11:53:49, 14 December 2024)
- ML20082L303 + (11:53:50, 14 December 2024)
- 05000425/LER-1995-004, :on 950326,DG Voltage Regulator Malfunction Occurred That Resulted in Drop in Voltage on 4160 Volt Bus. Caused by Failure of DG Regulator to Maintain Line Voltage Above Setpoint.Replaced Regulator + (11:53:52, 14 December 2024)
- ML20082L284 + (11:53:53, 14 December 2024)
- ML20082L288 + (11:53:53, 14 December 2024)
- ML20082L277 + (11:53:56, 14 December 2024)
- ML20082L278 + (11:53:56, 14 December 2024)
- ML20082L271 + (11:53:57, 14 December 2024)
- ML20082L276 + (11:53:57, 14 December 2024)
- 05000338/LER-1995-003-01, :on 950327,pressurizer Cooldown & Heatup Temps Exceeded TS Limits Due to Transient.Energized Pressurizer Heaters to Heat Incoming Water to Pressurizer as Result of SI Functional Test + (11:53:59, 14 December 2024)
- 05000440/LER-1991-015, :on 910801,liquid Radwaste Discharge Made W/O Verifying Discharge Line Valving & Channel Improperly Calibr Between 910722-0801.Caused by Personnel Error.Totalizer Recalibr & Technician Counseled + (11:54:01, 14 December 2024)
- ML20082L260 + (11:54:02, 14 December 2024)
- ML20082L250 + (11:54:02, 14 December 2024)
- ML20082L248 + (11:54:03, 14 December 2024)
- ML20082L241 + (11:54:04, 14 December 2024)
- ML20082L244 + (11:54:04, 14 December 2024)
- 05000285/LER-1991-016, :on 910711,roll Pin for Diesel Generator Exhaust Damper Linkage Failed.On 910718,crack Discovered in Roll Pin for DG-1 Linkage.On 910802,util Notified That Crack Due to Mfg Defect.Also Reported Per Part 21 + (11:54:06, 14 December 2024)
- B10944, Forwards Suppl to Reload Safety Analyses for Cycle 6 Operation. Cycle 6 Reload Design Does Not Result in Previously Acceptable Safety Limits for Any Incident to Be Exceeded.Startup Scheduled for 831230 + (11:54:07, 14 December 2024)
- ML20082L236 + (11:54:07, 14 December 2024)
- ML20082L229 + (11:54:08, 14 December 2024)
- ML20082L226 + (11:54:09, 14 December 2024)
- ML20082L219 + (11:54:10, 14 December 2024)
- ML20082L217 + (11:54:11, 14 December 2024)
- ML20082L202 + (11:54:11, 14 December 2024)
- ML20082L200 + (11:54:12, 14 December 2024)
- ML20082L191 + (11:54:16, 14 December 2024)
- ML20082L186 + (11:54:17, 14 December 2024)
- ML20082L178 + (11:54:17, 14 December 2024)
- BECO-LTR-95-048, Responds to Request for Addl Info Re Planned Mod to Core Shroud + (11:54:18, 14 December 2024)
- ML20082L176 + (11:54:19, 14 December 2024)
- ML20082L172 + (11:54:20, 14 December 2024)
- ML20082L169 + (11:54:21, 14 December 2024)
- ML20082L149 + (11:54:23, 14 December 2024)
- ML20082L148 + (11:54:24, 14 December 2024)
- ST-HL-AE-5067, Monthly Operating Repts for Mar 1995 for South Tx Project Units 1 & 2 + (11:54:25, 14 December 2024)
- ML20082L141 + (11:54:25, 14 December 2024)
- ML20082L137 + (11:54:26, 14 December 2024)