SOUTH 'CA"ROLINA ELECTRIC 8c G AS COMPANY POST OFreCE 764 COLUMeiA. south CAROLINA 29218
- ?
O. W. DixON, JR.
VICE PmESIDENT November 17, 1983 NvCLEAR OPEmATIONS Mr. J.
P.
O'Reilly, Regional Administrator U.
S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N.W.
Atlanta, GA 30303
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 NRC IE Bulletin 83-06
Dear Mr. O'Reilly:
South Carolina Electric and Gas Company (SCE&G) has reviewed the list of vendors identified in Nuclear Regulatory Commission (NRC)
IE Bulletin 83-06 as having received ASME material f rom Tube Line Corporation.
The following vendors identified in the subject IE Bulletin have supplied SCE&G with parts / materials on " Quality Related" purchase orders:
Capitol Pipe and Steel Pittsburgh Des Moines Magnetrol Crane Chempump ITT Grinnell Guyon Alloys D.
G.
O'Brien Hub, Inc.
Bingham - Willamette Westinghouse Each of the vendors was requested to complete and return a questionnaire concerning products supplied to SCE&G for use at the Virgil C. Summer Nuclear Station.
With the exception of Westinghouse, all vendors reported that no Tube Line Corporation parts / materials were supplied to SCE&G.
Westinghouse's Water Reactor Division (WRD) submitted a response to SCE&G that did not reflect a complete review of th?.s issue by all appropriate divisions within Westinghouse.
Although remaining responses from Westinghouse have not been received, SCE&G is aware of Tube Line Corporation fittings supplied on a spare reactor coolant pump motor received from Westinghouse's Nuclear Services Integration Division.
i
!l i
lp G312050430 831117 1
PDR ADOCK 05000395 G
}
Mr.
J.
P.
O'Reilly IE Bulletin 83-06 November 17, 1983 Page #2 The fittings as received were made of material consisting of the following:
i Two pieces of SA-105 - 3/4" 600# Sch. 80 Raised face weld neck flanges.
Heat No. EXGA In accordance with Item 4.b. of the subject IE Bulletin, the following actions were taken.
SCE&G Quality Control placed a "QC-Hold" on the uninstalled reactor coolant pump motor.
A SCE&G Nonconformance Notice was issued to ensure that the received material complies with the ASME Code Section III and applicable specification requirements, or to determine if the fittings need to be replaced.
The present schedule for disposition of the Monconformance Notice, based on Westinghouse analysis results, is December 15, 1983.
SCE&G is presently working with Westinghouse to obtain a complete Westinghouse response.
A letter providing details of the disposition of the Nonconfor-mance Notice and the responses of the remaining Westinghouse Divisions will be submitted to Region II following receipt of the necessary information from Westinghouse.
Should you have any questions, please advise.
Very truly yours, fi f.
O.
W.
ixon ssJ WRM:OWD/fje cc:
V.
C.
Summer D.
A.
Lavigne T.
C. Nichols, Jr./O.
W.
Dixon, Jr.
C.
L.
Ligon (NSRC)
E.
H.
Crews, Jr.
G.
J.
Braddick E.
C.
Roberts D. J. Richard s W.
A.
Williams, Jr.
NRC Resident Inspector D.
A.
Nauman J.
B.
Knotts, Jr.
Group Managers I&E Washington O.
S.
Bradham NPCF N.
E.
Clark File R.
B.
Clary