Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000333/LER-1991-013, :on 910731,both Standby Liquid Control Sys Declared Inoperable.Caused by Loss of Pump Discharge Accumulator Precharge.Both Accumulators Immediately Recharged & Placed on Increased Monitoring + (11:29:08, 14 December 2024)
- 05000333/LER-1983-054-03, /03L-0:on 831104,steam Leak Occurred in 3/4-inch Pipe to HPCI Header Vent.Caused by Crack in heat-affected Area of Weld on Short Pipe Nipple.Rhr HX Sys Supports Checked to Verify Correct Installation + (11:29:09, 14 December 2024)
- ML20082R660 + (11:29:10, 14 December 2024)
- ML20082R658 + (11:29:11, 14 December 2024)
- ML20082R655 + (11:29:11, 14 December 2024)
- ML20082R645 + (11:29:12, 14 December 2024)
- ML20082R638 + (11:29:13, 14 December 2024)
- ML20082R641 + (11:29:13, 14 December 2024)
- ML20082R625 + (11:29:14, 14 December 2024)
- 05000293/LER-1995-003, :on 950324,manually Initiated RPS Scram Signal & Scram Occurred.Caused by Deliberate Movement of Reactor Mode Selector Switch from Run Position.Controller & Linkage Being Replaced + (11:29:16, 14 December 2024)
- ML20082R594 + (11:29:17, 14 December 2024)
- ML20082R609 + (11:29:17, 14 December 2024)
- ML20082R593 + (11:29:19, 14 December 2024)
- ML20082R592 + (11:29:20, 14 December 2024)
- 05000247/LER-1983-041-03, /03L-0:on 831029,following Maint Outage,Reactor Coolant Chemical Analysis Indicated Chloride Concentration of 200 Ppb.Caused by Unflushed Anion Demineralizer Placed in Svc.Chloride Concentration Restored + (11:29:21, 14 December 2024)
- 05000272/LER-1983-052-03, /03L-0:on 831104,containment Fan Coil Unit 11 Tripped While Starting in Fast Speed for Daily Surveillance. Caused by Shorted & Grounded Motor Stator Windings.Motor Replaced + (11:29:23, 14 December 2024)
- 05000324/LER-1983-094-03, /03L-0:on 831102,control Rod 38-23 Did Not Have RTGB Position Indication at 12 & Control Rod 30-39 Did Not Have RTGB Position Indication at 04.Caused by Problems on Indication Reed Switch of Each Rod + (11:29:25, 14 December 2024)
- ML20082R583 + (11:29:26, 14 December 2024)
- 05000368/LER-1983-048-03, /03L-0:on 831114,no Response Observed on Startup Channel 1 of Nuclear Instrumentation When Fuel Assembly, Containing Neutron Source,Inserted Into Core.Caused by Problems in Mother Board.Board Replaced + (11:29:27, 14 December 2024)
- 05000416/LER-1983-176-03, /03L-0:on 831031,flow from Reactor Water Cleanup Sys to Reactor Water Sample Station Cut Off for Maint, Preventing Continuous Recording of Reactor Coolant Conductivity.Caused by Procedural Error + (11:29:29, 14 December 2024)
- ML20082R570 + (11:29:30, 14 December 2024)
- ML20082R569 + (11:29:30, 14 December 2024)
- ML20082R565 + (11:29:31, 14 December 2024)
- 05000272/LER-1983-054-03, /03L-0:on 831112,intermediate Range Channel N35 High Flux Bistable Trip Did Not Occur When Power Reached 25%.Caused by Setpoint Drifting Out of Calibr.Channel Recalibr + (11:29:32, 14 December 2024)
- 0CAN128301, Clarifies 830415 Reponse to NUREG-0737,Suppl 1 Re Evacuation of Secondary Technical Support Ctr.Ctr Will Only Be Evacuated When Warranted for Protection of Personnel + (11:29:33, 14 December 2024)
- 05000289/LER-1983-044, Forwards LER 83-044/01T-1.Info Potentially Relevant to Plant Design & Procedures Phase of Proceeding.Svc List Encl + (11:29:34, 14 December 2024)
- ML20082R553 + (11:29:35, 14 December 2024)
- 05000318/LER-1983-061-03, /03L-0:on 831107,during Surveillance Test of ESF Actuation Sys Logic,Lpsi Pump 22 Could Not Be Restarted After Being Stopped on RAS Signal.Caused by Trip Latch Wipe Out of Adjustment + (11:29:36, 14 December 2024)
- ML20082R535 + (11:29:37, 14 December 2024)
- ML20082R523 + (11:29:38, 14 December 2024)
- ML20082R526 + (11:29:38, 14 December 2024)
- 05000327/LER-1983-154-03, /03L-0:on 831106,waste Gas Decay Tanks J & H Discovered to Have High Oxygen Concentrations.Caused by Rupture of Boric Acid Evaporator Diaphragm B,Allowing Air to Enter Tank J + (11:29:40, 14 December 2024)
- ML20082R520 + (11:29:41, 14 December 2024)
- ML20082R516 + (11:29:41, 14 December 2024)
- ML20082R514 + (11:29:42, 14 December 2024)
- ML20082R509 + (11:29:43, 14 December 2024)
- ML20082R513 + (11:29:43, 14 December 2024)
- 05000272/LER-1983-050-03, /03L-0:on 831031,130-ft Elevation Airlock Interior Door Failed Surveillance Test & Declared Inoperable.Caused by Improperly Seated Seal.Personnel Will Be Trained in Proper Airlock Operation + (11:29:45, 14 December 2024)
- ML20082R506 + (11:29:46, 14 December 2024)
- ML20082R505 + (11:29:47, 14 December 2024)
- ML20082R502 + (11:29:48, 14 December 2024)
- ML20082R482 + (11:29:49, 14 December 2024)
- 05000395/LER-1983-126-03, /03L-0:on 831105,during Installation of Electrical Panel Cover,Power Lead Shorted Out,Causing Plus/Minus Rate Trip & Hi Flux Trip on N-44.Caused by Wiring Routed Near Front of Panel.Shorted Lead Repaired + (11:29:50, 14 December 2024)
- ML20082R468 + (11:29:51, 14 December 2024)
- RBG-16-360, Interim Deficiency Rept DR-108 Re Bergen Paterson Supplied Pipe Support Components.Investigation Incomplete.Next Rept Will Be Provided by 831219 + (11:29:51, 14 December 2024)
- ML20082R466 + (11:29:52, 14 December 2024)
- ML20082R461 + (11:29:53, 14 December 2024)
- ML20082R460 + (11:29:53, 14 December 2024)
- ML20082R457 + (11:29:54, 14 December 2024)
- ML20082R453 + (11:29:57, 14 December 2024)
- TXX-4083, Forwards post-accident Sampling Sys Summary Procedure for Estimating Core Damage,Per NRC 830913 Request to Complete TMI Action Item II.B.3.Westinghouse Generic Procedure Scheduled for Completion by Feb 1984 + (11:29:58, 14 December 2024)