Provides Status & Schedule Re Submittal of Proposed Tech Specs for Listed NUREG-0737 Items,As Required by Generic Ltr 83-37
ML20082R594
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/06/1983
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: John Miller
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.1, TASK-2.B.3, TASK-2.E.1.1, TASK-2.F.1, TASK-2.F.2, TASK-3.D.3.4, TASK-TM GL-83-37, LIC-83-301, NUDOCS 8312130229
Download: ML20082R594 (2)


Text

  • ~

Omaha Public Power District 1623 Harney Omaha, Nebraska 68102 402/536-4000 December 6, 1983 LIC-83-301 Mr. J.

R.

Miller, Chief U.

S.

Nuclear Regulatory Commission Of fice of Nuclear Reactor Regulation Division of Licensing Operating Reactors Branch No. 3 Washington, D.C.

20555

Reference:

Docket No. 50-285

Dear Mr. Miller:

NUREG-0737 Technical Specifications Generic Letter 83-37 The following information is provided as required by Generic Letter 83-37, dated November 1, 1983, regarding the submittal of proposed Technical Specifications for the identified NUREG-0737 items scheduled for completion after December 31, 1981.

The pro-posed Technical Specification changes and schedules have been dia-cussed with the Fort Calhoun Station Project Manager, Mr.

E.

G.

Tourigny.

NUREG Schedule Item Item No.

Date Reactor Coolant System Vents II.B.1 January 15, 1984 Post Accident Sampling II.B.3 March 1, 1984 System om Long Term Auxiliary Feed-II.E.1 February 15, 1984 o$$

water System Evaluation cdo wo no Noble Gas Effluent Monitors II.F.1.1 February 15, 1984 i

en 1

O

%g Sampling and Analysis of II.F.1.2 February 15, 1984 gg Plant Effluents no g4 Containment High Radiation II.F.1.3 February 15, 1984

-m Monitor no mat Containment Pressure Monitor II.F.1.4 February 15, 1984 Containment Water Level II.F.1.5 February 15, 1984 Monitor

!0 45 5124 Employment with Equal Opportunity I

l Male; Female

Mr. J. ~ R.

Miller

'LIC-83-301 Page Two NUREG Schedule Item Item No.

Date Containment H2 Monitor II.F.1.6 February 15, 1984 Instrumentation for De-II.F.2 No schedule has tection of ICC been determined for the submittal date at this time.

Submittal will be on a schedule con-sistent with the scheduled install-ation date of 1985.

Control Room Habitability III.D.3.4 No schedule has been determined for the submittal date at this time.

Submittal date will be establish--

ed with the Pro-ject Manager.

It is the District's intention to review the existing Technical Specificationo for the Fort Calhoun Station and modify those specifications as required in order to format the new Technical Specifications.

The existing schedule for the Fort Calhoun Station Technical Specifications will be maintained.

Sincerely, h

W.

C.' ' Jones Divis' ion Manager Proddction Operations WCJ/KJM:jmm cc:

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036 Mr.

E.

G.

Tourigny, Project Manager Mr.

L.

A.

Yandell, Senior Resident Inspector

--