ML20082R509

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-12,submitted in Response to 831123 Safety Evaluation Re Reactor Trip Breaker Automatic Shunt Trip.Westinghouse Owners Group Generic Design Conditions Applicable
ML20082R509
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/08/1983
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20082R511 List:
References
NUDOCS 8312130196
Download: ML20082R509 (3)


Text

.

  • r .

SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 784 CotuusiA. SOUTH CAROLINA 29218 O. W. OIxoN. JR.

v,CE p=ES.oENT December 8, 1983 NUCLEAR OPERATIONS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Reactor Trip Breaker Automatic Shunt Trip

REFERENCE:

Letter dated November 23, 1983, from T. M. Novak to O. W. Dixon, Jr.

Dear Mr. Denton:

The referenced letter identified three confirmatory items which are included in the safety evaluation of the reactor trip breaker automatic shunt trip design modification. The three confirmatory items and the associated response are as follows:

1. Confirm that the environmental conditions defined by the Westinghouse Owner's Group (WOG) generic design are applicable to your application.

A review of the environmental parameters defined by the WOG generic design was performed. It has been evaluated that the conditions defined by the WOG generic design are applicable to the installation of the automatic shunt trip design modification at the Virgil C. Summer Nuclear Station.

2. Confirm that your surveillance test procedure required opening the " block auto shunt trip" switch contacts during the test of the control room manual trip switch to confirm the operability of the manual shunt trip circuit independent of the automatic shunt trip circuit.

The appropriate surveillance test procedures require that the

" block automatic shunt trip" switch contacts are opened during the test of the control room manual trip switch.

8312130196 831208 PDR ADOCK 05000395 P PDR RecM u cAecx 330.vlo Us ha. ao $6dl

/// 2

X . . .- ,

Mr. Harold R. Denton Reactor Trip-Breaker Automatic Shunt Trip Page Two December 8,='1983-4 1

3. Provide proposed Technical Specifications for the modification.

i Provided as Enclosure 1 are proposed changes to the Technical Specifications concerning the surveillance testing of the

. . reactor trip breakers. Upon Nuclear Regulatory Commission (NRC) approval, these revised' Technical Specifications will supersede the surveillance testing requirements outlined in the letters from O. W. Dixon, Jr. to H.- R. Denton, dated May 12, 1983,.and June 8, 1983.

. South Carolina Electric & Gas Company (SCE&G) has determined

that a-finding of no significant hazards is justified in that additional requirements are being added to the Technical Specifications. This' change has been reviewed and approved by 4 the Plant l Saf ety Review Committee (PSRC) and the Nuclear Safety 4 Review Committee (NSRC). A check in the-amount of Four Thousand Dollars ($4,000.00) is enclosed for processing this

! change.

4

) . SCE&G :is a participating member of the Westinghouse Owner's Group, which'is in-the process of developing generic requirements for reactor trip breaker testing and maintenance.

It is expected that the enclosed proposed Technical Specifications will not be approved for implementation until 1

these final generic guidelines are issued, at which time SCE&G

[ may elect to amend this proposal. Until final Technical Specifications are approved and issued, reactor trip breaker maintenance-and testing will continue in accordance with

. commitments described in letters from O. W. Dixon, Jr. to H. R. Denton, dated May 12, 1983, and June 8, 1983.

i-If you have any questions, please contact us at your convenience.

Very truly yours, 4

4 1/ -

O. W. lxon, J .

ARK: AMP:OWD/fjc/dwf

{ cc: See Page Three 4

6

Mr. Harold:R. Denton Reactor Trip Breaker Automatic Shunt--Trip Page Three December 8, 1983 1

cc: V. C. Summer T. C. Nichols, Jr./O. W. Dixon, Jr.

E. H. Crews, Jr.

E. C. Roberts

.W. A. Williams, Jr.-

D. A. Nauman J. P.-O'Reilly Group Managers O. S. Bradham C. A. Price C. L. Ligon (NSRC)

G. J. Braddick D. J. Richards NRC Resident Inspector J. B. Knotts, Jr.

NPCF File

. _ . . . . . _ - --- . . - . , . _ _ . . - - , _ , _ - - _ - . _ . - . - - - . - - . . - , .