Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083H414 + (10:46:40, 14 December 2024)
- ML20083H404 + (10:46:41, 14 December 2024)
- ML20083H412 + (10:46:41, 14 December 2024)
- ML20083H398 + (10:46:42, 14 December 2024)
- 05000237/LER-1983-076-03, Unidentified Drywell Leakage Calculated to Be 3.08 Gpm.Caused by Cut in Seal Ring Seating on Feedwater Check Valve Body.Cut silver-soldered & New Seal Ring Installed + (10:46:43, 14 December 2024)
- 1CAN128310, Notifies That B&W Rept Re NUREG-0737,Item II.K.3.5, Reactor Coolant Pump Trip, Will Not Be Available Until Jan 1984. Addl Time Required to Prepare plant-specific Portion of Submittal.Final Submittal Will Be Provided by 840331 + (10:46:46, 14 December 2024)
- ML20083H377 + (10:46:47, 14 December 2024)
- ML20083H375 + (10:46:47, 14 December 2024)
- 05000315/LER-1983-122-03, /03L-0:on 831212,four Ice Condenser Intermediate Deck Doors Found Frozen Shut.Caused by Ice Accumulation Due to Leaking Drain Lines on Air Handlers 4-2A,4-4A & 1-5B.Ice Removed + (10:46:49, 14 December 2024)
- 05000250/LER-1983-023-03, /03L-0:on 831201,while Unit Shut Down,Discovered Spent Fuel Pit Exhaust Radiation Monitor Deenergized.Cause Undetermined.Sign Will Be Posted Identifying Breaker as Tech Spec Item + (10:46:51, 14 December 2024)
- ST-HL-AE-1041, Final Deficiency Rept Re Installation of Cathodic Protection Devices on Stainless Steel Piping.Initially Reported on 831202.Affected Piping Will Be Cut & Replaced Per ASME Code & Weld Specs.Sys Installation Documents Will Be Revised + (10:46:52, 14 December 2024)
- ML20083H363 + (10:46:52, 14 December 2024)
- RBG-16-609, Interim Deficiency Rept DR-108 Re Bergen-Paterson Pipe Support Components.Investigation Incomplete.Next Rept Will Be Provided by 840208 + (10:46:56, 14 December 2024)
- ML20083H354 + (10:46:57, 14 December 2024)
- ML20083H353 + (10:46:57, 14 December 2024)
- ML20083H340 + (10:46:58, 14 December 2024)
- ML20083H352 + (10:46:58, 14 December 2024)
- RBG-16-668, Forwards Revised FSAR Table 13.3-1, Emergency Action Levels,Initiating Conditions & Emergency Response. Marked Items Being Developed as Part of Tech Specs Scheduled for Submittal in June 1984.Info to Be Included in Revised FSAR + (10:46:59, 14 December 2024)
- ML20083H335 + (10:47:00, 14 December 2024)
- 05000302/LER-1983-062-03, /03L-0:on 831208,recorder for Reactor Bldg Pressure (BS-65-PR) Determined Inoperable.Caused by Procedural Inadequacy.Revised Drawing Used for Mod Omitted Wire to Recorder.Correction Installed 831227 + (10:47:01, 14 December 2024)
- ML20083H329 + (10:47:03, 14 December 2024)
- ML20083H328 + (10:47:04, 14 December 2024)
- NRC-84-0002, Forwards Revised FSAR Page 14.2-62,modifying Accumulator Testing Abstract of safety-related Preoperational Test Procedures.Mod Will Be Included in Rev 13 to FSAR Scheduled for Submittal in Feb 1984 + (10:47:05, 14 December 2024)
- ML20083H319 + (10:47:05, 14 December 2024)
- ML20083H317 + (10:47:06, 14 December 2024)
- ML20083H309 + (10:47:10, 14 December 2024)
- ML20083H306 + (10:47:11, 14 December 2024)
- ML20083H305 + (10:47:11, 14 December 2024)
- ML20083H288 + (10:47:12, 14 December 2024)
- RBG-16-634, Interim Deficiency Rept DR-152 Re Wire Terminations of 480-volt Gould-Brown Boveri Motor Control Ctrs.Investigation Incomplete.Next Rept Expected by 840316 + (10:47:12, 14 December 2024)
- 05000261/LER-1983-032-03, /03L-0:on 831104,during Testing of Porvs,Valve PORV-456 Failed to Meet Required Cycle Time.Caused by Limit Switch Improperly Adjusted.Limit Switch Adjusted & Small Air Leak Repaired + (10:47:14, 14 December 2024)
- 0CAN098305, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/83-17 & 50-368/83-17.Corrective Actions:Energy Supply Procedure (ESP) 202 Reviewed & Revised to Comply W/ AP&L-TOP-1A,effective 830901 + (10:47:15, 14 December 2024)
- IR 05000317/2020301 + (10:47:15, 14 December 2024)
- ML20083H262 + (10:47:16, 14 December 2024)
- ML20083H252 + (10:47:17, 14 December 2024)
- ML20083H249 + (10:47:17, 14 December 2024)
- ML20083H248 + (10:47:18, 14 December 2024)
- 05000328/LER-1983-190-03, /03L-0:on 831211,RCS Subcooling Margin Monitor Declared Inoperable Due to Loss of P-250 Computer.Computer Halt Caused by Programmatic Error.Monitor Returned to Svc + (10:47:19, 14 December 2024)
- ML20083H235 + (10:47:20, 14 December 2024)
- ML20083H233 + (10:47:21, 14 December 2024)
- ML20083H234 + (10:47:21, 14 December 2024)
- ML20083H228 + (10:47:22, 14 December 2024)
- ML20083H216 + (10:47:23, 14 December 2024)
- ML20083H217 + (10:47:23, 14 December 2024)
- RBG-16-710, Final Deficiency Rept DER-105 Re Electrical Separation Between Reactor Protection Sys & Nuclear Steam Supply Shutoff Wiring within Power Generation Control Complex. Condition Not Reportable Per 10CFR50.55(e) + (10:47:24, 14 December 2024)
- ML20083H215 + (10:47:24, 14 December 2024)
- RBG-16-632, Interim Deficiency Rept DR-150 Re Insulation on Posi-Seal Intl Motor Operator Valves.Next Rept Will Be Submitted by 840402 + (10:47:27, 14 December 2024)
- RBG-16-667, Forwards Responses to Open Items Identified in Draft SER & Response to 810805 & 1231 Requests for Addl Info.Responses Will Be Provided in Future FSAR Amend + (10:47:27, 14 December 2024)
- 05000328/LER-1983-179-03, /03L-0:on 831203,during Performance of SI-699.2, Monthly Equipment Rotation, Centrifugal Charging Pump 2B-B Failed to Start.Caused by Broken Microswitch. Microswitch Replaced + (10:47:29, 14 December 2024)
- ML20083H192 + (10:47:30, 14 December 2024)
- BECO-83-297, Discusses Proposed Methods of Implementing Requirements of 10CFR61 & Outlines Addl Actions Taken Prior to Shipment of Radwaste After 831227 + (10:47:31, 14 December 2024)
- ML20083H186 + (10:47:31, 14 December 2024)