ML20083H363
| ML20083H363 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 01/09/1984 |
| From: | Woolever E DUQUESNE LIGHT CO. |
| To: | Harold Denton, Knighton G Office of Nuclear Reactor Regulation |
| References | |
| 2NRC-4-001, 2NRC-4-1, NUDOCS 8401130175 | |
| Download: ML20083H363 (5) | |
Text
_ _ _ _ _ - _
$VL pg 2NRC-4-OsH g
(412) 787 - 5141 Telecopy 412)787 - 629 Nuclear Construction Division 3anuary 9, 1984 Robinson Plaza, Building 2, Suite 210 Pihsburgh, PA 15205 Mr. Harold R. Denton Of fice of Nuc? car Reactor Regulation United States :uclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. George W. Knighton, Chie f Licensing Branch 3 Division of Licensing f
SUBJECT:
Beaver Valley Power Station Docket No. 50-412 Facility Staffing Survey Centlemen:
In res ponc e to your le t ter to me dated December 7, 1983, concerning the Facility Staffing Survey ( at t ached ) on Beave r Valley Unit 2,
I am providing the following information.
Personnel in the operating staf f will meet the qualifications defiaed in Sect ion 4 of ANSI N18.1-1971.
Present information concerning the facility s taf fire is cont ained in FS AR Chap t er 13, Sect ion 1.
More specific info rm a-t ion concerning operating shif ts, experience, and qualifications of personnel will be provided six months prior to the fuel load date of Beaver Valley Unit 2.
DUQUESNE LIGHT COMPANY By Ey J.~ Woole.er Vice President ETE/wjs At t achment cc:
Ms. L. Lazo, NRC Project Manager (w/ attachment)
Mr. G. Walton, NRC Res ident Inspector (w/ attachment)
/$0DI j
'f 8401130175 840109 I
PDR ADOCK 05000412
\\
A PDR
Page 1 of 3 FACILITY STAFFING SURVEY l
Beaver Valley Power Station PLANT - Unit No. 2 Anticipated Licensing Date 12/85 A.
OPERATING SHIFT 1.
No. of Shifts 2.
No. of R0s Assigned to Shift Work No. of Yrs. of Commercial RO experience on BWR PWR Hot plants (post-initial criticality) 3.
No. of SR0s Assigned to Shift Work No. of Yrs of Commercial RO experience on BWR PWR Hot plants No. of Yrs of Commercial SRO (<perience on SWR PWR Hot plants i
t 4
No. of SR0s with 4-yr degree's
. Noh-encineering Engineering 5.
No. of Shift Supervisors (SS)
Non-engineering Engtneering Note: SS is senior authority on shift work.
- Personnel in the operating staff will meet the q'salifications defined in Section 4 of ANSI N18.1-1971.
FSAR Section 13.1.2.3 discusses operating shift crews.
-=
m Page 2 of 3 8.
ON_ SITE liANAGEMENT NOTE: The information in this table has been taken from the FSAR Chapter 13.1 and relates to the qualification requirements to hold the position and does not re fl.e c t the qualifications / experience of the specifi individual that may hold the position.
Fill in Table (Use Appropriate Titles) 1 2
4 8
Operations Assistant Maintenance QA/QC STA Sepervisor Plant Hgr.
Plant Mgr.3 Manager Mgr To liave license at time of OL 30 ye, 30 30 no Possess the Possess the required required a
Previously licensed No SRO experience and experience No training for and training R0/5R0 SRO for SRO Type Plant N/A No. Years N/A l
6 7
8 8
10 7
5 6
No. Years " Hot" Exp.
N/A 8
8 10 7
Degreed Yes No No No No Sci Type (Discipline (s))
or
, Eng_
Level (A/8/M/D) a l.
Nuclear Station Operating Supervisor 2.
Oiief Engineer 3.
Operations Superittenlert 4.
Maintenance Superintendent 5.
8 years of responsible powr plart experierre of sich at least 3 years shall be nuclear p>wer plart aperierre 6.
10 years of responsible power plant experience of Widi at least 3 years shall be nelear power plant exprierce 7.
7 yezrs of @plicable power platt or irdustrial ecperiene of sich at least L year shall be ruclear pacr plart experience 8.
Manager @lity Assurance 9
Page 3 of 3 C.
I CORPORATE NUCLEAR EXPERIENCE (On-Site Management)
Yrs. at Other Operator Lic.
Yrs. a t Nuc. Support /
Degrees (if ever held) Oper. Nuc.
Management Level POSITION
- NAME NUC NAVY R0/SR0/None Stations Position (A/B/M/D)
Discipline (s)
(Yrs)
(On-Site)
(Off-5ite)
VP N/A
- N/A N/A N/A N/A 2
Div VP J..T. Carey o
None B
Elect. Ene.
3 Tech Serv M. coppula, J, O
Naval Reactors B
Elect. Eng.
Mgr Certification.
Maint Mgr vacant 5
Oper Mgr T. D. Jones 0
None B
Mech. Eng.
Asst VP N/A N/A N/A N/A N/A N/A N/A Sta Nuc Eng N. R. Tonet o
None B
Nech. Eng.
6 Mgr 7
A. R. D'Amico 0
None D
Elect. Eng.
Dir Nuc fuel Ser Dir Nuc Lic J. D. Sieber 0
None B
Mech. Eng, QC/QA Mqr C. E. Ewing 0
None B
Mech. Eng.
Other
- Position titles shnwn are illustrative; please enter appropriate titles t
. ~..- ~ -. -.
1
~
ATTACHMENT TO C: " CORPORATE NUCLEAR EXPERIENCE"
- 1. TTh e information contained in this table has been taken from FSAR Chapter 13.1, Tab le - 13.1-1.
. 2. - Vice President - Nuclear Division 3.
Superintendent - Technical Services 4.
Superintendent - Maintenance 5.
Manager -- Nuclear Operations 6.
Manager - Nuclear Engineering Department 7.
Superintendent - Analytical Services 4
8.
Manager - Nucicar Safety and Licensing 9.
. Manager - Quality Assurance I
I i
i l
-