Ro:During Nov Surveillance,Listed Fire Doors Found Inoperable.Caused by Latching Mechanism & Closure Mechanism Failures & Doors Blocked Open for Const Startup & Maint Activities.Design Change Packages Developed
ML20083H353
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/15/1983
From: Haynes J
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8401040474
Download: ML20083H353 (5)


Text

- - - - - - - - - - - --- -

.: :' .r: 3 r- -

Southern California Edison Ca.mp,any , -

c%g:

S AN ONOF RE NUCLEAR GENER A TING S Y A YiON P.O BOA 128 S A N C L E ME N T E. C A LIF OR N'a 92 6 Y2 J G. H AYNE S December 15. 1983 U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region V 1450 Marin Lane, suite 210 Walnut Cteek, California 94596-5368 Attention: Mr. J. B. Martin, Regional Administrator

Dear Sir:

Subject:

Docket Nos. 50-361 and 50-362 30-Day Report, Inoperable Fire Doors San Onofre Nuclear Generating Station, Units 2 and 3

Reference:

Letter, H. B. Ray (SCE) to J. B. Martin (NRC),

dated November 15, 1983 In accordance with our referenced letter, this submittal provides the 30-day written report, pursuant to Technical Specification 6.9.1.13.b, for fire-rated assemblies (specifically fire doors) found inoperable during routine surveillances.

Fire doors found inoperable during the November routine surveillances are identified in the Attachment and include:

11 latching mechanism failures; 22 closure mechanism failures; and 34 doors blocked open typically for construction, startup or maintenance activities. As each of these deficiencies was identified, compensatory fire watches, pursuant to Technical Specification 3.7.9, Action Statement 'a', were established.

As reported previously, Design Change Packages (DCP's) are being developad to upgrade door latches and closures mechanisms into heavier duty hardware and to ensure a constant pressure differential across the access doors in the Radwaste and Control Buildings in order to reduce the door closure problems. The number of inoperable fire doors with these problems is decreasing, as these DCP's are implemented.

8401040474 832215 PDR ADOCK 05000361 S PDR I I (

3f ), A

i Mr. J. B. Martin Ncember 15, 1983 Fire doors impaired for construction or maintenance activities were included in the Fire Barrier Removal and Reinstallacion Request (FBRRR) Procedure effective December 8, 1983, to ensure proper compensatory measures are in place prior to any work performance.

be reported in Results January.of As the effectiveness of this revision will long term corrective action, the installation of utility penetrations adjacent to the doors for the routing of temporary cables, conduits and/or hoses to avoid blocking open the fire doors is under consideration.

Results of surveillances conducted during December 1983 will be reported by January 18, 1983.

If you require any additional information, please so advise.

Sincerely, Q@

Attachment cc: A. E. Chaffee (USNRC Resident Inspector, Units 1, 2 and 3)

J. P. Stewart (USNRC Resident Inspector, Units 2 and 3)

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Division of Technical Information and Document Control Institute of Nuclear Power Operations (INPO)

ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY ,

INOPERABLE FIRE DOORS FOR THE MONTH OF NOVEMBER 1983 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO 2 AND 3, DOCKET NOS. 50-361 and 50-362 1

I. Latching Mechanism Failures:

Number of doors f ailing - 11, as follows:

4 Door Number Inoperable Operable l l

AC-105 11/01 11/09 m.- 11/14 11/17 AC-106 11/01 Work Pending AC-111 11/06 11/07 11/08 11/11 11/14 11/17 11/18 11/21 AC-ll6 11/06 11/11 11/14 11/21 AC-129 11/01 11/11 C2-201 11/21 11/30 AC-301 11/01 11/02 AC-349 11/18 11/29 FH2-403 11/15 11/17 AR-501 11/01 Work Pending AR-504 11/01 Work Pending

ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY  !

INOPERABLE FIRE DOORS FOR THE MONTH OF NOVEMBER 1983 SAN ONOFRE NUCLEAR GENERATING STATION l UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 '

(Continued)

II. Closure Mechanism Failures:

Number of doors failing - 22, as follows:

Door Number Inoperable Operable AR-101 11/30 Work Pending FH2-101 11/01 11/14 11/15 11/18 11/21 Work Pending AR-104 11/22 11/23 11/30 Work Pending AC-115 11/27 11/29 AC-117 11/07 11/11 11/27 Work Pending AC-128 11/27 11/28 DG2-204 11/26 11/27 AC-223 11/02 11/03 AC-301 11/12 11/14 FH2-302 11/01 11/18 11/30 Work Pending FH3-302 11/01 11/27 FH2-303 11/01 11/15 11/16 11/18 11/30 Work Pending AC-304 11/01 11/07 FH2-304 11/23 11/24 AC-338 11/01 11/02 11/11 11/13 11/15 11/16 AC-345 11/01 11/02 11/06 11/07 11/09 11/10 11/11 11/13 11/15 11/16 11/27 11/28 AC-349 11/01 11/10 11/11 11/16 AC-350 11/06 11/07 11/11 11/13 AC-351 11/15 11/17 C2-401 11/18 11/20 FH2-403 11/03 11/13 AR-404 11/24 11/27

  • ATTACHMENT SOUTHERN CALIFORNIA EDISON COMPANY INOPERABLE FIRE DOORS FOR THE MONTH OF NOVEMBER 1983 SAN ONOFRE NUCLEAR GENERATING STATION UNITS NO. 2 AND 3, DOCKET NOS. 50-361 and 50-362 (Continued)

III. Doors Blocked Open:

Number of doors failing - 34, as follows:

Door Number Inoperable Operable AR-101 11/27 Work in Progress DG2-101 11/24 11/25 FH2-103 11/26 11/29 AC-105 11/14 11/27 11/29 Work in Progress AC-111 11/01 11/02 AC-113 11/01 11-07 AC-115 11/17 11/18 11/29 Work in Progress AC-116 11/01 11/04 11/10 Work in Progress AC-125 11/01 Work in Progress AR-203 11/27 Work in Progress DG2-206 11/22 Work in Progress AC-233 11/01 11/11 AC-239 11/18 11/21 AC-259 11/01 Work in Progress AC-260 11/01 Work in Progress AC-303 11/24 11/27 AC-306 11/26 11/27 AC-308 11/22 11/26 11/29 Work in Progress AC-312 11/05 11/11 AR-313 11/21 11/22 AR-315 11/21 1.1/28 AR-318 11/01 11/05 AC-319 11/22 11/26 AC-320 11/26 11/27 AC-331 11/16 11/17 11/18 11/20 AC-338 11/05 11/11 C2-403 11/14 11/18 C2-404 11/03 11/05 11/14 11/16