Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085J808 + (08:18:18, 14 December 2024)
- ML20085J806 + (08:18:18, 14 December 2024)
- U-601892, Proposed Tech Specs 3/4.8.3, Onsite Power Distribution Sys - Distribution - Operating + (08:18:37, 14 December 2024)
- ML20085J790 + (08:18:38, 14 December 2024)
- JSP-666-91, Application for Amend to License NPF-62,changing TS 3/4.8.4.3, RPS Electric Power Monitoring, to Implement Recommendations of Generic Ltr 91-09, Mod of Surveillance Interval for Electrical Protective Assemblies.. + (08:18:39, 14 December 2024)
- ML20085J786 + (08:18:39, 14 December 2024)
- ML20085J782 + (08:18:40, 14 December 2024)
- ML20085J780 + (08:18:41, 14 December 2024)
- ML20085J778 + (08:18:42, 14 December 2024)
- ML20085J772 + (08:18:42, 14 December 2024)
- ML20085J769 + (08:18:43, 14 December 2024)
- ML20085J767 + (08:18:44, 14 December 2024)
- ML20085J766 + (08:18:45, 14 December 2024)
- ML20085J762 + (08:18:46, 14 December 2024)
- ML20085J763 + (08:18:46, 14 December 2024)
- ML20085J761 + (08:18:47, 14 December 2024)
- RBG-16-070, Interim Deficiency Rept DR-130.Investigation Incomplete. Interim or Final Rept Expected by 831122 + (08:18:47, 14 December 2024)
- PY-CEI-NRR-1377, Forwards Application for Amend to CPPR-149,extending Const Completion Date from 911130 to 011130 + (08:18:48, 14 December 2024)
- ST-HL-AE-1008, Supplemental Final Deficiency Rept Re Westinghouse Supplied Pressure & Level Transmitters.Transmitters Will Be Provided for Applications Described in ,Per Westinghouse Group B & WCAP-8587 Generic Qualifications + (08:18:49, 14 December 2024)
- BVY-91-106, Comments on NRC Proposed Amend to Policy Statement Re Cooperation W/States at Commercial Nuclear Power Plants. Consistent W/Mou,Util Established Position of State Liaison Engineer to Communicate W/State of VT + (08:18:56, 14 December 2024)
- ML20085J746 + (08:18:57, 14 December 2024)
- ML20085J743 + (08:19:04, 14 December 2024)
- ML20085J733 + (08:19:11, 14 December 2024)
- ML20085J728 + (08:19:12, 14 December 2024)
- ML20085J729 + (08:19:12, 14 December 2024)
- 3F1091-09, Forwards Relief Request 91-010 from ASME Case Code N-498 Re Hydrostatic Testing of Class 1 & 2 Sys.Alternate Exams Will Be Performed on Class 1 & 2 Sys Starting W/Refuel 8 + (08:19:13, 14 December 2024)
- ML20085J721 + (08:19:14, 14 December 2024)
- ML20085J716 + (08:19:14, 14 December 2024)
- ELV-03106, Forwards Response to Generic Ltr 91-06, Resolution of Generic Issue A-30, Adequacy of Safety-Related DC Power Supplies + (08:19:15, 14 December 2024)
- ML20085J702 + (08:19:19, 14 December 2024)
- ML20085J696 + (08:19:26, 14 December 2024)
- ML20085J694 + (08:19:34, 14 December 2024)
- ML20085J692 + (08:19:41, 14 December 2024)
- ELV-03131, Submits Results of Review of Cycle 4 Core Reload Design & Util Plans Re Implementation.Reload Safety Evaluation Demonstrated That Addl Tech Spec Changes Not Required for Operation During Cycle 4 + (08:19:42, 14 December 2024)
- ML20085J682 + (08:19:42, 14 December 2024)
- ELV-03163, Submits Implementation Plan for ERDS Program,Per NUREG-1394, Rev 1 & 910813 Publication of Final Rule in Fr.All NRC Required Plant Parameters Will Be Transmitted from Existing Emergency Response Facility Computers to Pc Workstations + (08:19:43, 14 December 2024)
- ML20085J680 + (08:19:43, 14 December 2024)
- ML20085J677 + (08:19:44, 14 December 2024)
- ML20085J676 + (08:19:44, 14 December 2024)
- ML20085J672 + (08:19:45, 14 December 2024)
- ML20085J673 + (08:19:45, 14 December 2024)
- TXX-3592, Final Deficiency Rept Re Pipe Wall Thickness of Reactor Coolant Pressurizer Surge Line.Initially Reported on 821101. Deficiency Not Reportable Per 10CFR50.55(e) + (08:19:46, 14 December 2024)
- ML20085J665 + (08:19:47, 14 December 2024)
- ML20085J668 + (08:19:47, 14 December 2024)
- ML20085J664 + (08:19:48, 14 December 2024)
- ML20085J663 + (08:19:48, 14 December 2024)
- ML20085J660 + (08:19:49, 14 December 2024)
- ML20085J659 + (08:19:49, 14 December 2024)
- TXX-4054, Interim Deficiency Rept Re Temp in Excess of FSAR Parameters Experienced in Annulus Between Reactor Vessel Insulation & Shield Wall.Cooling Increased by Reducing Chilled Water Temp & Installing Addl Cooling Coil + (08:19:50, 14 December 2024)
- ML20085J649 + (08:19:51, 14 December 2024)
- ML20085J647 + (08:19:51, 14 December 2024)