Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000482/LER-1992-005, :on 920227,notified That Containment Penetration Vent & Drain Valves May Not Have Been Included in Surveillance Test Procedure STS GP-007 Due to Inadequate Attention to Detail.Subj Procedure Revised + (17:41:49, 13 December 2024)
- ML20091C032 + (17:41:50, 13 December 2024)
- 05000482/LER-1992-004, :on 920229,ESF Actuations Involving Lifting of Lead to Logic Circuit Card Occurred.Caused by Inadequate Procedural Development.Procedures Revised to Direct Control Room Operators to Hold Reset Switch + (17:41:52, 13 December 2024)
- ML20091C028 + (17:41:53, 13 December 2024)
- ML20091C026 + (17:41:54, 13 December 2024)
- ML20091C021 + (17:41:58, 13 December 2024)
- ML20091C018 + (17:41:58, 13 December 2024)
- ML20091C015 + (17:41:59, 13 December 2024)
- ML20091C013 + (17:42:00, 13 December 2024)
- ML20091C014 + (17:42:00, 13 December 2024)
- ML20091C008 + (17:42:01, 13 December 2024)
- ML20091B995 + (17:42:02, 13 December 2024)
- 05000423/LER-1992-004-02, :on 920224,B Train CR Pressurization Bottles Were Found Isolated by Two Manual Valves.Probably Caused by Personnel Error Associated W/Improper self-verification. Commitment Opened to Discuss self-verification + (17:42:04, 13 December 2024)
- 05000285/LER-1992-008, :on 920227,relief Valves on SI Sys Piping Had Been Installed W/Relief Setpoints Not within SI Sys Design. Caused by Inconsistencies Between Relief Valve Spec Sheets. Drawings & Design Basis Documents Updated + (17:42:06, 13 December 2024)
- ML20091B979 + (17:42:08, 13 December 2024)
- 05000282/LER-1992-003-02, :on 920228,procedure Inadequacy Identified in Test Procedure SP1127 Re Radioactive Source Inventory & Smear Test.Caused by Failure to Ensure Proper Method for Fe-55 Detection.Procedure Revised + (17:42:09, 13 December 2024)
- 05000423/LER-1991-022, :on 910820,discovered That Closure of One Camparator Trip Switch Auxiliary Contacts Was Not Being Verified.Caused by Mgt Deficiency.Monthly Surveillances Were Modified to Verify Contact Closure + (17:42:11, 13 December 2024)
- ML20091B970 + (17:42:12, 13 December 2024)
- LD-92-045, Submits Listing of Deviations Between Acceptance Criteria of NRC Std Review Plan & Sys 80+ Design Certification Application & Submits Std Review Plan Comments + (17:42:13, 13 December 2024)
- ML20091B967 + (17:42:14, 13 December 2024)
- B14086, Forwards Changes to Initial Test Program for Item 71 of FSAR Table 14.2-1.Changes Cover Spent Fuel Pool Cooling Sys,Boron Thermal Regeneration Sys,Turbine Generator & CRD Sys + (17:42:17, 13 December 2024)
- ML20091B949 + (17:42:18, 13 December 2024)
- ML20091B945 + (17:42:18, 13 December 2024)
- ML20091B941 + (17:42:20, 13 December 2024)
- 05000325/LER-1992-008, :on 920302,during Hot Shutdown,Spurious Trip of Chlorine Detector Led to AOP & Automatic Isolation of Control Bldg Ventilation.Possibly Caused by Spurious Actuation of Detector.Job Order Initiated + (17:42:22, 13 December 2024)
- ML20091B933 + (17:42:23, 13 December 2024)
- 05000282/LER-1992-002-02, :on 920224,discovered That 4,160-volt Ac Breaker Lockout Relay Reset Circuit for Safeguards Pump Motors Not Completely Protected by Redundant Fusing. Replacement Fuses Staged Near Panels + (17:42:24, 13 December 2024)
- AECM-84-0156, Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-416/83-58.Corrective Actions:Memo Issued to Maint Superintendents Informing of FSAR Requirement & Plant Administrative Procedure 01-S-01-11 Revised + (17:42:25, 13 December 2024)
- ML20091B893 + (17:42:26, 13 December 2024)
- ML20091B892 + (17:42:27, 13 December 2024)
- ML20091B873 + (17:42:27, 13 December 2024)
- ML20091B868 + (17:42:28, 13 December 2024)
- ML20091B866 + (17:42:29, 13 December 2024)
- ML20091B861 + (17:42:30, 13 December 2024)
- ML20091B859 + (17:42:31, 13 December 2024)
- ML20091B858 + (17:42:31, 13 December 2024)
- AECM-84-0260, Forwards Supplemental Response to NRC Re Violations Noted in IE Insp Rept 50-416/83-58.Corrective Actions:Rev 8 Issued to Plant Administrative Procedure 01-S-01-11 & Violation Reviewed by Safety Review Committee + (17:42:32, 13 December 2024)
- 3F0584-09, Forwards Recent Correspondence W/Epa,Per Tech Specs App B, Part Ii,Section 3.2 Re Sample Gathering for 316 Study & Denial of Relief from Delta T Limitations Requested on 840424 + (17:42:33, 13 December 2024)
- ML20091B831 + (17:42:33, 13 December 2024)
- ML20091B821 + (17:42:34, 13 December 2024)
- RBG-17-850, Interim Deficiency Rept DR-134 Re Four Lines Located at Outlet of Each RHR Sys HX Shell.Next Rept Will Be Provided by 840720 + (17:42:35, 13 December 2024)
- PY-CEI-NRR-1460, Forwards Requested Changes to Bases for TSs to Incorporate Miscellaneous Changes Not Associated W/Any Future TS Change Requests + (17:42:35, 13 December 2024)
- ML20091B810 + (17:42:36, 13 December 2024)
- ML20091B800 + (17:42:37, 13 December 2024)
- ML20091B798 + (17:42:39, 13 December 2024)
- AECM-84-0303, Responds to 840508 Request for Addl Info on Proposed Changes to Tech Specs Re Min Suppression Pool Water Level.Response to Item 1.5 of Request for Addl Info & Info Re Safety Review Committee Encl + (17:42:40, 13 December 2024)
- 2CAN070109, Submits Proposed Rev to Tech Specs 3.2.1 & 3.2.4 Re Power Distribution Limits,Per NRC 910429 Request + (17:42:41, 13 December 2024)
- ML20091B789 + (17:42:41, 13 December 2024)
- ML20091B786 + (17:42:42, 13 December 2024)
- ML20091B787 + (17:42:42, 13 December 2024)
- ML20091B784 + (17:42:43, 13 December 2024)