Proposed Tech Specs Pages 3/4 6-11,3/4 6-12 & 3/4 6-15 Re Surveillance Requirements
ML20091C013
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 03/25/1992
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20091C009 List:
References
NUDOCS 9204020235
Download: ML20091C013 (4)


Text

_ - - _ - - - - - _ - - - - - - - - -

glTACith11ELLD UNIT 2 i I

TECilNICAL SI'ECIFICATf0N RINISED l' AGES l

3/4611 3/4612 3/4615 9204020235 920325 PDR ADOCK0500g8 P

CONTAIN_hEtir_ SYSIDAS SURYIIL LANCI_RIQUIRDlDin 1Centinu td)  ;.

b. At least once per refueling interval, during shuti wn, by:
1. Verifying tha'. each automatic valve in the flow path actu-ates to its correct position on 6efety-lejeettefr A+twatien ;;;; ift el. the ypropende. E5rns tes+ mcncd 3
2. Verifying that 'ach spray pump starts automatictily on -e-Otmtatftment-Spfar-Attuation test signal, h cq 9<tp c e d c E5FAs
c. At least once per 5 years by performing en air or smoke flow test through each spray header and verirying each spray nonle is unobstructed.

4

  • - > . . m i

l CALVERT CLIFFS - UNIT 2 l't 6 11 A mend ment-Nor440--4 M-

C;0NTAINMENT SYSTEMS CONTAINMENT C00LitlG SYSTEM

(

LIMITING CONDITION FOR OPERATION 3.6.2.2 Two independent groups of containment air recirculation and cooling units shall be OPERABLE with two units to each group.

APPLICABILITY: MODES 1, 2 and 3.

ACTION:

a. With one group of hequired containment air recirculation and cooling units inoperable and both containment spray systems OPERABLE, restore the inoperable group of air recirculetion and cooling units to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,
b. With three required containment air recirculation and cooling

,  ! units inoperable and both containment spray systems OPERABLE, restore at least one reautred air recirculation and cooling unit to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTDOWN

{ s within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Restore both above required groups of contain- z -

I ment air recirculation and cooling units to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />,

c. With one group of required containment air recirculation and cool-units inoperable and one containment spray system inoperable. '

restore the inoperable containment spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Restore the inoperable croup of containment air recirculation and coolir;9 units to OPERABLE status within 7 days of initial loss or be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE RE0VIREMENTS 4.6.2.2 Each containment air recirculation and cooling unit shall be demonstrated OPERABLE:

a. .At least once per 31 days on a STAGGERED TEST BASIS by:
1. Starti y e r unit from the control room.
2. Verif;,ing that each unit operates for at least 15 minutes.
3. Verifying a cooling water flow rate of > 2000 gom to each cooling unit when the full flow service water outlet valves are fully open.
b. At least once per 18 months by verifying that each unit starts automatically on a--Gent &xnt Spny ttuathm test signal.

% c y apncJe_ E5FAS CALVERT CLIFFS - UNIT 2 3/4 6-12 Mcatent Mc.44 122 f

_ _ _ _ _ _ _ _ - . - - - - - - - - - - - - - - ' - - -"""" - - - - - - - - - -"^ "~ -

~

(v,

/; .

CONTAINMENT SYSTEMS 50RVEILLANCE RE0VIREMENTS (Continued 1 4

Subsequent to reinstalling the adsorber tray used for obtaining the carbon san lf e, the filter train shall- be demonstrated

0PERABLE by also verifying that the charcoal adsorbers-remove 199%'of-a halogenated hydrocarbon refrigerant test gas when
t. hey are tested in-place in accordance with Regulatory Positions C.5.a and C.S.d of Regulatory Cuide 1.52 Revision 2 March 1978 while operating the filter train at a flow-rate of 20,000 cfm i 10%.
d. At least once per refueling interval by:
1. Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is < 6 inches Water Gauge while operating the filter train at a flow rate of 20,000 cfm i 10%.
2. Verifying that the filter train starts nn bnY4IEEd 4 col: tion test signal.

,.s. 4 b

-fi CALVERT CLIFFS - UNIT 2 3/4 6-15 -Amendment,Ne r -fNEyf/1p2F