Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091C174 + (17:41:33, 13 December 2024)
- ML20091C169 + (17:41:34, 13 December 2024)
- ML20091C165 + (17:41:35, 13 December 2024)
- ML20091C156 + (17:41:35, 13 December 2024)
- ELV-02988, Responds to NRC Re Exercise Weaknesses Noted in Insp Repts 50-424/91-08 & 50-425/91-08 on 910513-17. Corrective Actions:Refresher Training Provided to Medical First Aid Personnel Including Proper Transfer of Casualty + (17:41:36, 13 December 2024)
- ML20091C147 + (17:41:37, 13 December 2024)
- ML20091C146 + (17:41:38, 13 December 2024)
- ML20091C143 + (17:41:39, 13 December 2024)
- 2CAN039204, Application for Amend to License NPF-6,revising TS 4.4.5 to Allow Installation of Tube Sleeves as Alternative to Plugging Defective SG Tubes.Encl Rept 51-1212539-00 Withheld + (17:41:40, 13 December 2024)
- NRC-84-0085, Informs That Final Draft Tech Specs Modified to Reflect as-built Conditions Re UHS Retention Pond,Sized for Two Units W/Excess Margin,Despite Unit 2 Cancellation + (17:41:40, 13 December 2024)
- ML20091C085 + (17:41:41, 13 December 2024)
- ML20091C075 + (17:41:43, 13 December 2024)
- ML20091C066 + (17:41:43, 13 December 2024)
- ML20091C050 + (17:41:44, 13 December 2024)
- ML20091C045 + (17:41:45, 13 December 2024)
- AECM-84-0284, Informs That Request for Exemption from GDC 17 Requirements Will Be Submitted by 840604,per Util 840518 Commitment & 840522 Order to Disassemble & Inspect One Standby Diesel Generator + (17:41:46, 13 December 2024)
- ML20091C040 + (17:41:46, 13 December 2024)
- ML20091C036 + (17:41:47, 13 December 2024)
- 05000482/LER-1992-005, :on 920227,notified That Containment Penetration Vent & Drain Valves May Not Have Been Included in Surveillance Test Procedure STS GP-007 Due to Inadequate Attention to Detail.Subj Procedure Revised + (17:41:49, 13 December 2024)
- ML20091C032 + (17:41:50, 13 December 2024)
- 05000482/LER-1992-004, :on 920229,ESF Actuations Involving Lifting of Lead to Logic Circuit Card Occurred.Caused by Inadequate Procedural Development.Procedures Revised to Direct Control Room Operators to Hold Reset Switch + (17:41:52, 13 December 2024)
- ML20091C028 + (17:41:53, 13 December 2024)
- ML20091C026 + (17:41:54, 13 December 2024)
- ML20091C021 + (17:41:58, 13 December 2024)
- ML20091C018 + (17:41:58, 13 December 2024)
- ML20091C015 + (17:41:59, 13 December 2024)
- ML20091C013 + (17:42:00, 13 December 2024)
- ML20091C014 + (17:42:00, 13 December 2024)
- ML20091C008 + (17:42:01, 13 December 2024)
- ML20091B995 + (17:42:02, 13 December 2024)
- 05000423/LER-1992-004-02, :on 920224,B Train CR Pressurization Bottles Were Found Isolated by Two Manual Valves.Probably Caused by Personnel Error Associated W/Improper self-verification. Commitment Opened to Discuss self-verification + (17:42:04, 13 December 2024)
- 05000285/LER-1992-008, :on 920227,relief Valves on SI Sys Piping Had Been Installed W/Relief Setpoints Not within SI Sys Design. Caused by Inconsistencies Between Relief Valve Spec Sheets. Drawings & Design Basis Documents Updated + (17:42:06, 13 December 2024)
- ML20091B979 + (17:42:08, 13 December 2024)
- 05000282/LER-1992-003-02, :on 920228,procedure Inadequacy Identified in Test Procedure SP1127 Re Radioactive Source Inventory & Smear Test.Caused by Failure to Ensure Proper Method for Fe-55 Detection.Procedure Revised + (17:42:09, 13 December 2024)
- 05000423/LER-1991-022, :on 910820,discovered That Closure of One Camparator Trip Switch Auxiliary Contacts Was Not Being Verified.Caused by Mgt Deficiency.Monthly Surveillances Were Modified to Verify Contact Closure + (17:42:11, 13 December 2024)
- ML20091B970 + (17:42:12, 13 December 2024)
- LD-92-045, Submits Listing of Deviations Between Acceptance Criteria of NRC Std Review Plan & Sys 80+ Design Certification Application & Submits Std Review Plan Comments + (17:42:13, 13 December 2024)
- ML20091B967 + (17:42:14, 13 December 2024)
- B14086, Forwards Changes to Initial Test Program for Item 71 of FSAR Table 14.2-1.Changes Cover Spent Fuel Pool Cooling Sys,Boron Thermal Regeneration Sys,Turbine Generator & CRD Sys + (17:42:17, 13 December 2024)
- ML20091B949 + (17:42:18, 13 December 2024)
- ML20091B945 + (17:42:18, 13 December 2024)
- ML20091B941 + (17:42:20, 13 December 2024)
- 05000325/LER-1992-008, :on 920302,during Hot Shutdown,Spurious Trip of Chlorine Detector Led to AOP & Automatic Isolation of Control Bldg Ventilation.Possibly Caused by Spurious Actuation of Detector.Job Order Initiated + (17:42:22, 13 December 2024)
- ML20091B933 + (17:42:23, 13 December 2024)
- 05000282/LER-1992-002-02, :on 920224,discovered That 4,160-volt Ac Breaker Lockout Relay Reset Circuit for Safeguards Pump Motors Not Completely Protected by Redundant Fusing. Replacement Fuses Staged Near Panels + (17:42:24, 13 December 2024)
- AECM-84-0156, Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-416/83-58.Corrective Actions:Memo Issued to Maint Superintendents Informing of FSAR Requirement & Plant Administrative Procedure 01-S-01-11 Revised + (17:42:25, 13 December 2024)
- ML20091B893 + (17:42:26, 13 December 2024)
- ML20091B892 + (17:42:27, 13 December 2024)
- ML20091B873 + (17:42:27, 13 December 2024)
- ML20091B868 + (17:42:28, 13 December 2024)
- ML20091B866 + (17:42:29, 13 December 2024)