Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091D256 + (17:38:12, 13 December 2024)
- ML20091D225 + (17:38:13, 13 December 2024)
- RBG-17-875, Forwards Rev 12 to FSAR (Filed in PDR Category K) & Environ Qualification Document (Filed in PDR Category a) + (17:38:13, 13 December 2024)
- ML20091D224 + (17:38:14, 13 December 2024)
- AECM-84-0310, Withdraws Listed Proposed Tech Specs.Items Will Be Resubmitted by Process Outlined in T Novak + (17:38:15, 13 December 2024)
- ML20091D223 + (17:38:15, 13 December 2024)
- ML20091D218 + (17:38:16, 13 December 2024)
- B11180, Forwards Revised Responses to Power Sys Branch Mechanical Series Questions.Responses Consist of marked-up FSAR Pages + (17:38:17, 13 December 2024)
- ML20091D206 + (17:38:18, 13 December 2024)
- ELV-03618, Comment Supporting Proposed Rule 10CFR2 Re Policy & Procedure for Enforcement Actions + (17:38:19, 13 December 2024)
- ML20091D177 + (17:38:19, 13 December 2024)
- ML20091D176 + (17:38:20, 13 December 2024)
- ML20091D173 + (17:38:21, 13 December 2024)
- ML20091D174 + (17:38:21, 13 December 2024)
- ML20091D172 + (17:38:22, 13 December 2024)
- ML20091D168 + (17:38:23, 13 December 2024)
- ML20091D169 + (17:38:23, 13 December 2024)
- ML20091D166 + (17:38:24, 13 December 2024)
- ML20091D164 + (17:38:26, 13 December 2024)
- ML20091D163 + (17:38:26, 13 December 2024)
- ML20091D162 + (17:38:28, 13 December 2024)
- ML20091D161 + (17:38:30, 13 December 2024)
- ML20091D160 + (17:38:32, 13 December 2024)
- ML20091D153 + (17:38:34, 13 December 2024)
- 05000333/LER-1992-014, :on 920302,primary Containment Drywell High Range Radiation Monitor Trip Signal Caused Automatic Closure of Two Vents.Caused by Susceptability to Electromagnetic Interference.Monitor & Logic Reset + (17:38:36, 13 December 2024)
- ML20091D150 + (17:38:37, 13 December 2024)
- ML20091D147 + (17:38:38, 13 December 2024)
- ML20091D149 + (17:38:38, 13 December 2024)
- ML20091D145 + (17:38:39, 13 December 2024)
- ML20091D140 + (17:38:43, 13 December 2024)
- ML20091D138 + (17:38:44, 13 December 2024)
- ML20091D134 + (17:38:45, 13 December 2024)
- ML20091D121 + (17:38:45, 13 December 2024)
- 05000278/LER-1991-010-03, :on 910707,reactor Scram Occurred as Result of Main Generator Load Reject Trip Signal.Caused by Lightning. Scram & Isolations Reset,Sys Returned to Normal & Damaged Components Replaced + (17:38:47, 13 December 2024)
- B14091, Amends 920203 Application for Amend to License DPR-65, Revising TS Per Generic Ltr 90-09 Re Snubber Visual Insp Intervals.Encl TS Page 3/4 7-32 Inadvertently Omitted from 920203 Submittal + (17:38:52, 13 December 2024)
- ML20091D108 + (17:38:52, 13 December 2024)
- 05000289/LER-1991-001-02, :on 910707,inoperability of Degraded Grid Voltage Relays Resulting from Reinstallation of Volt Breaker.Caused by Physical Configuration of Switchgear Cubicle.Engineering Evaluation Performed + (17:38:54, 13 December 2024)
- 05000321/LER-1991-009-01, :on 910712,main Control Room Environ Control Sys Discovered Not to Comply W/Single Failure Design Criterion.Caused by Inadequate Design of Sys.Design Changes to Sys Being Implemented + (17:38:56, 13 December 2024)
- ET-NRC-91-3612, Requests That Rept NSD-TAP-1093, North Anna Unit 1 Steam Generator Operating Cycle Evaluation Be Withheld (Ref 10CFR2.790) + (17:38:57, 13 December 2024)
- ML20091D096 + (17:38:58, 13 December 2024)
- 05000382/LER-1991-015, :on 910716,failure to Stroke BD-103B Occurred. Caused by Lack of Procedural Compliance.Shift Supervisor Debriefed Per Improving Human Performance Program + (17:39:00, 13 December 2024)
- 05000325/LER-1991-017, :on 910706,auxiliary Operator Found Indicator for Temp Switch/Transmitter Pegged Upscale.Caused by Internal Fault Temp Switch/Transmitter.Temp Switch/ Transmitter Replaced & Returned to Svc + (17:39:02, 13 December 2024)
- 05000219/LER-1991-003-01, :on 910613,locked High Radiation Area Found Unlocked.Caused by Several Personnel Errors.Appropriate Disciplinary Action Taken W/Regard to Personnel Involved in Incident + (17:39:07, 13 December 2024)
- 05000269/LER-1991-009, :on 910703,one of Two Diverse Actuation Sys for Loss of Main Feedwater Mitigation Sys Discovered Inoperable.Caused by Design Deficiency.Investigation Team Formed + (17:39:10, 13 December 2024)
- ELV-03587, Comment Supporting NUMARC Comments Re Special Review of NRC Regulations + (17:39:11, 13 December 2024)
- ML20091D061 + (17:39:12, 13 December 2024)
- W3P84-1480, Forwards Response to Gw Knighton 840514 Request for Addl Financial Info + (17:39:13, 13 December 2024)
- ML20091D054 + (17:39:14, 13 December 2024)
- ML20091D053 + (17:39:14, 13 December 2024)
- ML20091D049 + (17:39:15, 13 December 2024)
- 05000271/LER-1992-009, :on 920313,during Shutdown,Hourly Fire Watch Not Maintained as Required Per TS 3.13.A.2.Caused by Inadequate Communications at Shift Change.Personnel Counselled & Training Matl Revised + (17:39:17, 13 December 2024)