Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-4187, Provides Addl Response to 840424 & 0501 Ltrs Containing List of Allegations Re Issuance of Incomplete Packages to QC & Document Control Clerks Receiving Poor Training + (17:25:53, 13 December 2024)
- ML20091G416 + (17:26:02, 13 December 2024)
- ML20091G413 + (17:26:03, 13 December 2024)
- ML20091G408 + (17:26:03, 13 December 2024)
- W3P84-1542, Advises That Reactor Power Cutback Sys Initiated at Facility to Accommodate Certain Types of Imbalances by Providing Step Reduction in Reactor Power.Inadvertent or Spurious Operation of Subj Sys Will Be Reported to Nrc,Per SER + (17:26:04, 13 December 2024)
- 05000263/LER-1984-018, :on 840425,during Shutdown,Channel B Reactor Bldg Vent Wide Range Gas Monitor Isolated Reactor Bldg Ventilation & Started Standby Gas Treatment Sys When Noise Spike Caused Registration of High Radiation + (17:26:06, 13 December 2024)
- ML20091G405 + (17:26:07, 13 December 2024)
- ML20091G399 + (17:26:08, 13 December 2024)
- ML20091G396 + (17:26:09, 13 December 2024)
- ML20091G391 + (17:26:11, 13 December 2024)
- ML20091G387 + (17:26:11, 13 December 2024)
- ML20091G385 + (17:26:12, 13 December 2024)
- NLS9100742, Forwards Proprietary Fracture Mechanics Analysis Rept, GE-NE-508-014-1191,Rev 1, Analysis of UT Indications in Feedwater Nozzle-to-Vessel Welds N4A,N4C & N4D, Per Performance of ISIs on Feedwater Nozzles.Rept Withheld + (17:26:13, 13 December 2024)
- ML20091G381 + (17:26:14, 13 December 2024)
- 05000352/LER-1991-025-01, :on 911103 & 18,personnel Received Main Control Room Annunciator Alarm Indicating High Toxic Gas Concentration in Fresh Air Intake.Caused by Momentary High Toxic Concentration Indication + (17:26:16, 13 December 2024)
- 05000334/LER-1991-030, :on 911108,identified Unconservative Test Method for Determining SLCRS Filter Efficiency.Caused by Inadequate Testing Procedures.Testing Procedures Were Revised in 1990 to Meet Requirements + (17:26:21, 13 December 2024)
- 05000483/LER-1991-006-01, :on 911105,reactor Trip Occurred Due to Failure of Gating Sequencing Card in Inverter Supplying 120 Volt AC Safety Related Instrument Bus.Cause of Card Failure Unknown. Procedures Will Be Developed + (17:26:26, 13 December 2024)
- 05000414/LER-1991-014-01, :on 911105,ESF Actuation Occurred as Result of Undervoltage Signal Generated on a Train 4160 Volt Essential Bus.Caused by Fuseholder Connection Stabs Not Making Contact W/Essential Bus.Procedures Enhanced + (17:26:29, 13 December 2024)
- 05000254/LER-1991-002-13, :on 911104,heater Failed to Attain 15 F Differential Temp.Cause Unknown.Revised Monthly Surveillance to Incorporate New Requirements.Declared B Train Afu Operable + (17:26:31, 13 December 2024)
- 05000346/LER-1991-006-01, :on 911105,anaylsis of Post Large Break LOCA of Cold Leg Was Potentially non-conservative.Caused by Failure to Recognize Effect of Plenum Cylinder.Procedure Changed.W/ + (17:26:33, 13 December 2024)
- 05000301/LER-1991-005-02, :on 911111,discovered Both High Head saftey- Injection Pump Breakers Were Racked In,Making Both Pumps Cognitive Errror.Review Conducted + (17:26:36, 13 December 2024)
- ML20091G365 + (17:26:37, 13 December 2024)
- ML20091G359 + (17:26:40, 13 December 2024)
- ML20091G360 + (17:26:40, 13 December 2024)
- ML20091G356 + (17:26:41, 13 December 2024)
- ML20091G351 + (17:26:42, 13 December 2024)
- LIC-95-0112, Forwards Application for Amend to License DPR-40 Re Extension of Allowed Outage Time for an Inoperable LPSI Pump from 24 H to Seven Days + (17:26:43, 13 December 2024)
- ML20091G346 + (17:26:43, 13 December 2024)
- ML20091G345 + (17:26:44, 13 December 2024)
- ML20091G341 + (17:26:45, 13 December 2024)
- ML20091G339 + (17:26:45, 13 December 2024)
- ML20091G326 + (17:26:47, 13 December 2024)
- ML20091G318 + (17:26:48, 13 December 2024)
- ML20091G308 + (17:26:49, 13 December 2024)
- ML20091G301 + (17:26:49, 13 December 2024)
- W3P84-1526, Forwards Justification for Interim Operation of Auxiliary Pressurizer Spray Sys,In Further Response to Gw Knighton 840330 Request for Schedule for Resolution of NRC Concerns + (17:26:50, 13 December 2024)
- ML20091G291 + (17:26:51, 13 December 2024)
- 05000327/LER-1984-029, :on 840507,high Radiation Alarm Actuated, Causing Auxiliary Bldg Ventilation Isolation to Occur.Caused by Unstable Detector Output & Conservative Radiation Level Setpoint.Related Incident on 840508 + (17:26:52, 13 December 2024)
- 05000259/LER-1984-020-01, :on 840505,discovered That Paralleling Units 1 & 2 Diesel Generators W/Unit 3 Generators in Presence of Accident Signal Not Possible.Caused by Error in App R Analysis Review.Mod Expected by 840815 + (17:26:55, 13 December 2024)
- ML20091G282 + (17:26:56, 13 December 2024)
- ML20091G283 + (17:26:56, 13 December 2024)
- ML20091G266 + (17:26:57, 13 December 2024)
- B11184, Forwards Status Summary & Responses to Reactor Sys Branch Draft SER Open Items.Summary Reflects Discussions Held W/Nrc at 840509 meeting.Marked-up FSAR Pages Also Encl + (17:26:58, 13 December 2024)
- ML20091G251 + (17:26:59, 13 December 2024)
- RBG-17-929, Forwards Supplemental Response to Question 210.101 Re Min Wall Thickness at Girth Butt Welds from Mechanical Engineering Branch Consultant to Ornl,Ec Rodabaugh Assoc, Inc.Response Will Be Included in Future Amend to FSAR + (17:26:59, 13 December 2024)
- NRC-84-0089, Forwards Addl Responses to 840507 & 14 Requests for Addl Info Re Tech Specs on Dnb.Responses Incorporate Decisions Reached at 840530 Meeting W/Nrc + (17:27:00, 13 December 2024)
- ML20091G207 + (17:27:03, 13 December 2024)
- ML20091G205 + (17:27:04, 13 December 2024)
- ML20091G197 + (17:27:04, 13 December 2024)
- ML20091G177 + (17:27:05, 13 December 2024)
- ML20091G146 + (17:27:06, 13 December 2024)
- ML20091G159 + (17:27:06, 13 December 2024)