Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094A221 + (15:01:13, 13 December 2024)
- ML20094A214 + (15:01:14, 13 December 2024)
- 05000316/LER-1984-026, :on 840821,control Room Cable Vault Supply Fan Fire Damper 2-HV-ACES-2 Closed But Not Latched.Caused by Clearance Between Latch Bolt & Housing Being Greater than Necessary.Personnel Reinstructed + (15:01:19, 13 December 2024)
- 05000315/LER-1984-024-01, :on 841002,during Surveillance Test,Spent Fuel Pool Exhaust Ventilation Sys Dampers Did Not Change Position to Direct Air Flow Through Charcoal Adsorbers.Cause Unknown.Investigation Revealed No Reason + (15:01:21, 13 December 2024)
- ML20094A209 + (15:01:22, 13 December 2024)
- LIC-95-0205, Forwards Rev 1 to EPIP-TSC-2,EPIP Index,Pages 1,2 & 3 & Rev 8 to Radiological Emergency Response Plan, Section P + (15:01:23, 13 December 2024)
- BSEP-84-2235, RO-2-84-11:on 840924,reactor Scram Occurred Due to Reactor Vessel Low Water Level.Ler Will Be Submitted by 841107 + (15:01:24, 13 December 2024)
- 05000373/LER-1984-058-01, :on 841001, Emergency make-up Train B Inadvertently Initiated.Caused by Personnel Being Unaware of Train Status.Train Immediately Secured & Control Switch Taken to pull-to-lock Position + (15:01:26, 13 December 2024)
- ML20094A200 + (15:01:27, 13 December 2024)
- ML20094A202 + (15:01:27, 13 December 2024)
- 2CAN109503, Forwards Rev 0 to 95-R-2003-01, Entergy Operations ANO-2 COLR for Cycle 12 + (15:01:28, 13 December 2024)
- ML20094A198 + (15:01:28, 13 December 2024)
- ML20094A177 + (15:01:29, 13 December 2024)
- ML20094A176 + (15:01:30, 13 December 2024)
- ML20094A172 + (15:01:31, 13 December 2024)
- ML20094A167 + (15:01:31, 13 December 2024)
- ML20094A166 + (15:01:32, 13 December 2024)
- ULNRC-03281, Forwards Revised TS Pages,Relocating Audit Frequencies in Former TS 6.5.2.9 to Operational QA Manual,In Response to NRC & 951010 Telcon W/Nrc + (15:01:33, 13 December 2024)
- NLS8400265, Forwards Revised Page 137A to Proposed Rev 14 to Tech Specs Re Primary Containment Surveillance Instrumentation + (15:01:33, 13 December 2024)
- ML20094A154 + (15:01:34, 13 December 2024)
- ML20094A151 + (15:01:35, 13 December 2024)
- ML20094A150 + (15:01:36, 13 December 2024)
- BECO-84-116, Forwards Response to 840529 Request for Addl Info Re Multi- Plant Action F-55 (TMI Item II.K.3.28), Qualification of Automatic Depressurization Sys Accumulators, Per 10CFR50.54(f).GE Will Provide Addl Info by 841001 + (15:01:37, 13 December 2024)
- AECM-84-0401, Supplemental Ro:On 840726,while Performing Routine Maint on Div 1 Tdi Diesel Engine,Water Observed Coming from Open Cylinder Cock on Left Bank Cylinder Head 7.Caused by 2-inch Crack in Right Exhaust Port Casting.Head Replaced + (15:01:38, 13 December 2024)
- ML20094A146 + (15:01:38, 13 December 2024)
- ML20094A140 + (15:01:39, 13 December 2024)
- W3P84-3098, Submits Evaluation of Explosion Hazards of Existing & Proposed Natural Gas Pipelines.Potential Hazards Less than Events Analyzed in FSAR Section 2.2 & Questions 311.1 & 311.2 + (15:01:40, 13 December 2024)
- TXX-4238, Responds to Re Problems Identified at Bahnson Co, Winston-Salem Facility.No HVAC Equipment Received from Subj Facility.Bahnson Co Solicited to Assess or to Take Any Needed Actions to Improve QA Program + (15:01:40, 13 December 2024)
- ML20094A118 + (15:01:41, 13 December 2024)
- ML20094A116 + (15:01:42, 13 December 2024)
- ML20094A113 + (15:01:42, 13 December 2024)
- 3F1095-06, Requests Concurrence to Perform Surveillance of Eight Exempted Tendons from Fifth Tendon Surveillance W/Sixth Tendon Surveillance Scheduled for Refuel 11 Outage in Spring of 1998 + (15:01:43, 13 December 2024)
- ML20094A106 + (15:01:43, 13 December 2024)
- ML20094A102 + (15:01:44, 13 December 2024)
- 05000293/LER-1984-014, :on 840928,while Shut Down for Refueling, Reactor Scram Signal Generated Through Reactor Protection Sys.Caused by Procedural Inadequacy.New Procedure Drafted to Provide Guidance for cross-tying Buses + (15:01:46, 13 December 2024)
- ML20094A097 + (15:01:47, 13 December 2024)
- ML20094A086 + (15:01:48, 13 December 2024)
- ML20094A084 + (15:01:48, 13 December 2024)
- ML20094A082 + (15:01:49, 13 December 2024)
- 05000327/LER-1984-064, :on 840925,inadvertent Trip Occurred on lo-lo Steam Generator Level in Loop 1.Caused by Pressure Decrease Due to Opening MSIV FCV-1-4 for Loop 1.Precautionary Note Added to GOI-1 + (15:01:51, 13 December 2024)
- BSEP-95-0383, Application for Amends to Licenses DPR-71 & DPR-62,revising Action B of TS 3.4.4 to Allow for Chemical Decontamination of RCS During Refueling Outages + (15:01:52, 13 December 2024)
- ML20094A079 + (15:01:52, 13 December 2024)
- ML20094A071 + (15:01:53, 13 December 2024)
- ML20094A066 + (15:01:54, 13 December 2024)
- ML20094A064 + (15:01:54, 13 December 2024)
- AECM-84-0389, Forwards Addl Info Re Design of Combustion Air Intake & Exhaust Sys for Standby Diesel Generators.Design Provides Assurance That Sys Capable of Performing Function + (15:01:55, 13 December 2024)
- BSEP-95-0531, Forwards Info Re NDE of FW Nozzles & Safe Ends Performed During Bsep,Unit 1 Refueling Outage 9,per NUREG-0619 + (15:01:56, 13 December 2024)
- ML20094A057 + (15:01:56, 13 December 2024)
- ML20094A056 + (15:01:57, 13 December 2024)
- ML20094A055 + (15:01:58, 13 December 2024)
- ML20094A054 + (15:01:58, 13 December 2024)