Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LD-84-051, Discusses Potential Single Failure of Sys 80 Auxiliary Pressurizer Spray Sys.Potential Failure Involves Possibility of Valve CH-240 Sticking in Full Open Position.Info Closes Out CESSAR Confirmatory Issues 1 & 2,per NUREG-0852 + (12:19:19, 13 December 2024)
- ML20097J446 + (12:19:20, 13 December 2024)
- ML20097J444 + (12:19:21, 13 December 2024)
- ML20097J441 + (12:19:28, 13 December 2024)
- 05000366/LER-1984-015-01, :on 840814,surveillance Required by Tech Spec Section 4.7.8.6 Not Performed within Applicable Time Constraints.Caused by Personnel Error.Personnel Instructed + (12:19:32, 13 December 2024)
- HL-5095, Discusses Followup GL 89-10 Closure Insp Conducted at Plant + (12:19:37, 13 December 2024)
- ML20097J439 + (12:19:37, 13 December 2024)
- ML20097J434 + (12:19:38, 13 December 2024)
- ML20097J428 + (12:19:39, 13 December 2024)
- 05000321/LER-1996-001, :on 960104,clogged Servovalve Strainers Resulted in Turbine Control Valve Closure & Automatic Reactor Shutdown.All Servovalves Strainers Replaced + (12:19:41, 13 December 2024)
- ML20097J412 + (12:19:42, 13 December 2024)
- ML20097J403 + (12:19:43, 13 December 2024)
- ML20097J402 + (12:19:43, 13 December 2024)
- ML20097J400 + (12:19:44, 13 December 2024)
- ML20097J399 + (12:19:45, 13 December 2024)
- ML20097J398 + (12:19:46, 13 December 2024)
- ML20097J397 + (12:19:47, 13 December 2024)
- NRC-96-4632, Forwards Nonproprietary & Proprietary Responses to NRC RAIs on AP600 Design Certification Test Program,Notrump Computer Code,Loftran Computer Code & SPES-2 Testing.Proprietary Responses Withheld + (12:19:48, 13 December 2024)
- ML20097J394 + (12:19:48, 13 December 2024)
- ML20097J393 + (12:19:49, 13 December 2024)
- ML20097J389 + (12:19:50, 13 December 2024)
- ML20097J392 + (12:19:50, 13 December 2024)
- ML20097J381 + (12:19:53, 13 December 2024)
- ML20097J373 + (12:19:54, 13 December 2024)
- ML20097J378 + (12:19:54, 13 December 2024)
- ML20097J371 + (12:19:55, 13 December 2024)
- NG-84-3544, Confirms Info Previously Submitted Re Discrepancies Between Some as-installed Seismic Pipe Supports & Associated Design Drawings,Discovered During in-plant Audit of IE Bulletin 79-14 in Conjunction w/10-yr Inservice Insp + (12:19:56, 13 December 2024)
- ML20097J358 + (12:19:56, 13 December 2024)
- ML20097J354 + (12:19:57, 13 December 2024)
- ML20097J333 + (12:19:58, 13 December 2024)
- ML20097J338 + (12:19:58, 13 December 2024)
- ML20097J331 + (12:19:59, 13 December 2024)
- ML20097J329 + (12:20:00, 13 December 2024)
- ML20097J325 + (12:20:01, 13 December 2024)
- ML20097J311 + (12:20:02, 13 December 2024)
- ML20097J280 + (12:20:03, 13 December 2024)
- HL-5094, Responds to RAI Re Third Ten-Year Interval ISI Program for Ei Hatch Nuclear Plant + (12:20:04, 13 December 2024)
- ML20097J276 + (12:20:04, 13 December 2024)
- ML20097J252 + (12:20:05, 13 December 2024)
- ML20097J250 + (12:20:06, 13 December 2024)
- ML20097J245 + (12:20:06, 13 December 2024)
- ML20097J238 + (12:20:07, 13 December 2024)
- ML20097J226 + (12:20:08, 13 December 2024)
- ML20097J215 + (12:20:08, 13 December 2024)
- ENS 57459 + (12:20:08, 13 December 2024)
- ML20097J205 + (12:20:09, 13 December 2024)
- ML20097J192 + (12:20:10, 13 December 2024)
- RS-20-044, Emergency License Amendment Request for a One-Time Extension of the Steam Generator Tube Inspections + (12:20:11, 13 December 2024)
- ML20097J186 + (12:20:12, 13 December 2024)
- ML20097J185 + (12:20:13, 13 December 2024)
- W3P84-2573, Forwards Procedures Generation Package Pages Necessary to Complete NRC Review,Per 840914 Telcon.Submittal Should Remove Impediments to NRC Closure of Procedures Generation Package Review + (12:20:14, 13 December 2024)
- ML20097J184 + (12:20:14, 13 December 2024)