ML20097J389
| ML20097J389 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/19/1984 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20097J377 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.18, TASK-TM NUDOCS 8409210225 | |
| Download: ML20097J389 (2) | |
Text
__
p----
l LOW WATER LEVEL
.NIGN ORYWELL PRESSURE (LEVEL 1)
I g' -
l- -
J q
4 _ _ _ _. - s g t i
i SEAL l
i r---
-7 iN l
BYPASS TIMER l
I I
{ - M (NOMINAL SETTING l
LOW WATER b _ G NINUTES)j LEVEL (LEVEL 1) l CONFlRM WATER LEVEL 13 BELOW LEVEL 1 105-3 ECONO ACTUATION TIMER *
(
LOW PRESSURE l
ECCS PUNPS RUNNING
- 105 SECONO. ACTUATION TIMER WILL I
RESET IF REACTOR' WATER LEVEL
~
f""
"7 RECOVERS A80VE TRlP ELEVATION
,BEFORE IT TIMES OUT.
THE TIMER l N ANU AL INN 181T l WILL RESTART IF THE' LOW REACTOR l
NOT ACTIVATD l NATER LEVEL SIGNAL' 0CCURS AGAIN.
L_
_ _J NOTE:
BROKEN LINES OEPICT'A00lfl0NAL CONTROL LOGIC FEATURES ASSOCIATE 0 AOS WITH PROP 03E0 NG0lFICATION.
!ACTU ATION FIGURE 1 ADS LOGIC N00lFICATl0N NUREG 0737 l TEN II.K.3.18
- PEACH BOTTON ATONIC. POWER STATION 8409210225 840919 DR ADOCK 05000
.l
TABLE 3.2.D l
INSTRUMENTATION THAT INITIATES OR CONTROLS THE CORE AND CONTAINMENT
. i* ', ' '
COOLING SYSTEMS Minimum No.
4 Of Operable Number of Instru-1 Inntrument Trip Function Trip Level Setting ment Channels Pro Remarks Chrnnels Per vided by Design.
Trip System (1) 2 Core Spray Pump 6 +/- 1 sec 4 timers In conjunction with loss Start Timer 10 +/- 1 sec 4 timers of power initiates the starting of CSCS pumps.
I l
2 LPCI Pump Start Timer 5 +/- 1 sec 4 timers j
(Two Pumps)
I I
1 ADS Actuation Timer 90 </= t </= 120 2 timers In conjunction with l
]
seconds Low Reactor Water Level, i
High Drywell Pressure
!i and LPCI or Core Spray Pump-running interlock, I
initiates ADS.
i l
2 ADS Bypass Timer
- 8 </= t </= 10 4 timers In conjunction with j
minutes low reactor water level, i
bypasses high drywell pressure initiation of ADS.
2 RHR (LPCI) Pump 50 +/- 10 psig 4 channels Defers ADS actuation pending confirmation of Discharge Pressure Interlock Low Pressure Core Cooling l
system operation (LPCI Pump running
- i interlock).
i
'h 1
2 Core Spray Pump 185 +/- 10 psig 4 channels Defers ADS actuation i
Discharge Pressure pending confirmation of j
Interlock Low Pressure Core cooling i
system operation (Core Spray Pump running interlock).
- Effective when modification associated with this amendment request is complete.
I
-