c o
.i - 9..
g9 Arizona Public Service Company 4
go' September 4, 1984 ANPP-30420-TDS/KCP U. S.' Nuclear Regulatory Commission
. Region V.
.Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA-94596-5368
' Attention: Mr. T. W. Bishop', Director
' Division of Resident
, Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-63 A 50.55(e) Potentially Reportable Deficiency Relating To
' HPSI Is olation Valves By Borg-Warner Failed To Open Against HPSI,'A' and 'B" Pump Flows.
File:- 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between P. Narbut and R. Tucker on September 20, 1983 (B) ANPP-28072, dated October 24, 1984 (Interia Report)
(C) ANPP-28954, dated February 28, 1984 (Time Extension)
(D) ANPP-29131,. dated March 22, 1984 (Final Report)
(E) Telephone conversation between P. Narbut and T. Bradish on
' April 2, 1984 (F) ANPP-29395, dated April 30,~1984 (Revised Interia Report)
(G) ANPP-29971, dated July 16, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a'potentially reportable deficiency in Reference (A), an Interia Report.was transmitted by Reference (B), a Time Extension.was requested by Reference (C), and a Final Report was
. transmitted by Reference (D)'.
The NRC was notified in Reference (E) that~the corrective action specified in Reference (D) failed to correct the deficiency and the
. subject Dl!R had been re-opened. A revised Interim Report was submitted
.in Reference (F) and a Time Extension was requested in Reference (G). At
~
that time.it was estimated that -a Final Report would be available by August' 31, 1984.
9 i
e g
?
(h N
e
+
8409210139 840904 5
i
- PDR ADOCK 05000528 I Q
~8.-
PDR gg y
.g.
Mr. T. W. Bishop-
-Page Two A Final Report has been submitted.to APS for review. It is expected this Final Report will be transmitted to the NRC by September 21, 1984.
Very truly yours, ans
[
E. E. Van Brunt, Jr. %
APS Vice President i
Nuclear Production ANPP Project Director EEVB/KCP/nj
- ces
. Richard DeYoung, Director
'R Office of Inspection and Enforcement U."S. Nuclear Regulatory Commission Washington, D.r C. 20555
' T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht
- A. C.. Rogers L. A. Souza' D. E. Fowler T. D. Shriver C. N. Russo J. Vorees
- J. R. Bynum J.-M. Allea f-J. A. Brand r,
. D. Canady A.-C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson
- R. W. Welcher
. H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen
-R.- P. Zinserman S.-R.
Frost L. Clyde M. Woods
- T. J.. Bloom Records Center
-Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 TY f
=
f 9't v'
y
'w Y
v yv --
rt 3
wyr-1rry-vrer-ylvw
-'t-y'yp+g y-9 w g-aT-p-w,si++-
g y e*+g-iP4+t'dF--T'tT*P7TW"--tT 7P-*'7'1'P"-WW
+
9 WY