Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099G077 + (11:33:45, 13 December 2024)
- ML20099G072 + (11:33:46, 13 December 2024)
- ML20099G039 + (11:33:47, 13 December 2024)
- ML20099G035 + (11:33:48, 13 December 2024)
- ML20099G027 + (11:33:49, 13 December 2024)
- BECO-85-045, Radioactive Effluent & Waste Disposal Rept Including Radiological Impact on Humans,Jul-Dec 1984 + (11:33:51, 13 December 2024)
- ML20099G020 + (11:33:52, 13 December 2024)
- ML20099F956 + (11:33:52, 13 December 2024)
- 05000397/LER-1984-113, :on 841021,reactor Protection Sys (RPS) Actuation Occurred.Cause Not Stated.Reactor Level Restored, RPS Trip Signal Reset & Plant Cooldown Continued + (11:33:54, 13 December 2024)
- 05000324/LER-1992-020, :on 920710,TS Surveillance CAC SBGTS Heater Indicated That Degraded Voltage Should Have Been Considered. Caused by Degraded Voltage at Mcc.Sbgt Heater Surveillance Will Be Revised to Compensate for Worst Case + (11:33:56, 13 December 2024)
- ML20099F931 + (11:33:57, 13 December 2024)
- 05000244/LER-1984-013, :on 841015,review of 841011 Surveillance Test Revealed Control Rod in Shutdown Bank Failed to Demonstrate Movement of at Least 10 Steps in Any Direction.Caused by Transposing Error.Control Rods Retested + (11:33:59, 13 December 2024)
- DCL-85-090, Semiannual Effluent Rept for Jul-Dec 1984 + (11:34:00, 13 December 2024)
- ML20099F925 + (11:34:01, 13 December 2024)
- ML20099F913 + (11:34:03, 13 December 2024)
- ML20099F900 + (11:34:03, 13 December 2024)
- ML20099F879 + (11:34:04, 13 December 2024)
- ML20099F873 + (11:34:06, 13 December 2024)
- ML20099F871 + (11:34:07, 13 December 2024)
- 05000317/LER-1985-002, :on 850205,reactor Tripped on Low Steam Generator Water Level Condition.Caused by Personnel Error. Event Reviewed & Training Will Be Revised If Necessary + (11:34:09, 13 December 2024)
- ML20099F859 + (11:34:10, 13 December 2024)
- ML20099F863 + (11:34:10, 13 December 2024)
- ML20099F858 + (11:34:11, 13 December 2024)
- 05000249/LER-1984-019-04, :on 841024,addl 49.3 Std Cubic Ft Per Hour Should Have Been Added to as Found Leakage Rate.Caused by Improper Calibr of Two Floor make-up Boxes.Flowmeter Calibr Pressure & Temp Verified + (11:34:13, 13 December 2024)
- 05000361/LER-1985-016, :on 850131,fuel Handling Isolation Sys Train B Actuated Due to Instrument Failure of Fuel Handling Area Vent Radiation Indicator 2R-7823.Caused by High Voltage Power Supply Loss When HV Pushbutton Released + (11:34:15, 13 December 2024)
- 05000388/LER-1985-007-01, :on 850130,during Purge of Containment,One Train of Standby Gas Treatment Sys Became Inoperable.Caused by Annunciation of Standby Gas Treatment Sys B Heater Failure Alarm.Event Reviewed W/Operators + (11:34:16, 13 December 2024)
- RBG-20240, Interim Deficiency Rept DR-263 Re Thermocouple Extension Cable Supplied by Rockbestos Co.Next Rept Anticipated by 850328 + (11:34:18, 13 December 2024)
- ML20099F775 + (11:34:18, 13 December 2024)
- 05000336/LER-1992-011-02, :on 920710,leakage Rate Test of Containment Hydrogen Purge Piping Isolation Valves Exceeded SR 3.6.1.2b.Caused by Failure of Key Connecting Air Operator to Valve Shaft.Damaged Keys Replaced + (11:34:20, 13 December 2024)
- RBG-20241, Interim Deficiency Rept DR-274 Re Field Wiring to Asco & Target Rock Corp Solenoid Valves.Next Rept Anticipated by 850312 + (11:34:21, 13 December 2024)
- ML20099F708 + (11:34:22, 13 December 2024)
- ML20099F703 + (11:34:23, 13 December 2024)
- 05000395/LER-1984-045, :on 841018,power Loss to 120-volt Ac Distribution Panel APN-5901 Deenergized Solid State Protection Sys Channel I.Caused by Personnel Error During Performance of Plant Mod + (11:34:24, 13 December 2024)
- ML20099F692 + (11:34:26, 13 December 2024)
- 05000395/LER-1984-031, :on 840717,discovered Seven Electrical Circuits Penetrating Containment Not Included in Tech Specs.Cause Unknown.Plant Mod Being Processed to Install Overcurrent Protection + (11:34:27, 13 December 2024)
- ML20099F672 + (11:34:29, 13 December 2024)
- RBG-19341, Interim Deficiency Rept DR-221 Re Fire Deck Wall Thickness of Cylinder Heads in Tdi Standby Diesel Generators.Next Rept Will Be Provided by 841220 + (11:34:30, 13 December 2024)
- 05000333/LER-1984-022, :on 841028,full Scram Trip Occurred During APRM Surveillance Testing.Caused by Operator Error Due to Communication Breakdown.Personnel Counseled + (11:34:31, 13 December 2024)
- ST-HL-AE-1145, Final Deficiency Rept Re Defective Rosemount Pressure Transmitters.Initially Reported on 841003.Affected Transmitters Returned to Rosemount for Repair.Item Not Reportable Per 10CFR50.55(e) + (11:34:32, 13 December 2024)
- ML20099F638 + (11:34:33, 13 December 2024)
- ML20099F630 + (11:34:34, 13 December 2024)
- ML20099F623 + (11:34:37, 13 December 2024)
- ML20099F614 + (11:34:38, 13 December 2024)
- 05000301/LER-1984-006, :on 841023,inadvertent Actuation of Emergency Diesel Generator G02 Occurred.Caused by Accidental Closing of Contact on Loss of Voltage Relay 2-271X1/2A05 While Removing Insulating Matl + (11:34:40, 13 December 2024)
- 05000369/LER-1985-005-01, :on 850201,determined Plant Outside Design Analyses Assumptions,Based on Westinghouse Response Re Negative Flux Rate Trip Setpoint.Bistable Setpoint Reduced to 2.5% Rated Thermal Power + (11:34:42, 13 December 2024)
- ML20099F587 + (11:34:44, 13 December 2024)
- ML20099F586 + (11:34:44, 13 December 2024)
- ML20099F585 + (11:34:45, 13 December 2024)
- ML20099F550 + (11:34:46, 13 December 2024)
- ML20099F567 + (11:34:46, 13 December 2024)
- BVY-92-097, Monthly Operating Rept for Jul 1992 for Vermont Yankee Nuclear Power Station + (11:34:47, 13 December 2024)
- ML20099F538 + (11:34:48, 13 December 2024)