ML20099F879

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for June 1992 for Mnps Unit 3
ML20099F879
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/30/1992
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20099F868 List:
References
NUDOCS 9208130269
Download: ML20099F879 (1)


Text

-. - -. _..

I J

~ '

I

              • kRC QPERATING STATUS RE PORT COMPLETED DY RE ACTOR ENGINEERING *******

1.

00CKET.... 50 423 OPERAllWG STATUS 2.

REPoellNG PERIOD... JUNE 1992 OUT AGE + ONLikt 'ADURS..

87.6

+ 632.4

= 720.0 3.

UT il lif CON T ACT................. A. L. E les 203 444 %i68 4.

L I CE N SE D T HE R MAL P0WE R......................................... 3411

  • MILLSTONE
  • 5.

N AME PLAT E R Al l WG ( CR OS $ MWE )................................... 1,253 MW

  • UWlf 3 6.

DE S I GN EL E CT R i tAL R AT I NG (NE T 14E )............................. 1,153.6 7.

MAX I MUM DE PE NDABLE CAPAC11 Y (CROSS MWE )........................ 1,184.2 8.

KAX I MUM DE PE ND ABL E CAP AC lif (NE T MJE ).......................... 1,137. 0 9.

IF CHANGES DCCUR ABOVE SINCE L AST REPORT, RE ASONS ARE...........

N/A

10. POWER LEVEL 10 WHICH RESTRICTED, I F ANY (NET MdE )...............N/A
11. RE ASON F0W RESIRICilDN, if ANY....N/A i

MONTH TEAR TO DATE CUMULAi!VE TO DATE sense e..........a sessanns..........

12. HOURS th REPORTING PER100 720.0 4,367.0 54,263.0
13. NUMBER OF HOURS THE REAC10R WAS CRITICAL 669.9 2,987.9 39,535.2

- 14. REACTOR RESERVE SHUTDOWN HOURS 0.0 828.1 6,466.5 1$. HOURS GENERA 10R ONLINE 632.4 2,8 79.1 38,696.9

16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
17. GROSS THERMAL ENERGY GENERATED (MWH) 2,088,144.5 9,361,849.1 126,305,995.0
18. Gross ELECTRICAL' ENERGY GENERATED (MWH) 714,684.0 3,233,602.5 43,584,864.0
19. NET ELECTRICAL ENERGY GENERATED (MWH) 676,745.4 3,050,775.7 41,464,237.5
20. UNIT SERVICE FACTOR 87.8 65.9 71.3
21. UNIT AVAILABILITY FACTOR-87.8 65.9 71.3
22. UNIT CAPACITY FACTOR (USING MDC NET) 82.7 61.4 67.0
23. UNIT CAPACITY FAC10R (USING DER NET) 81.5 60.6 66.2
24. UNIT FORCED DUTAGE RATE 0.0 26.2 18.4
25. UNIT FORCED OUTAGE HOURS.

0.0 1,020.4.

8,749.5 SMU1 DOWNS SCHEDULED DVER NEXT SIX MONTHS (1YPE, DATE, AND DURATION OF EACH)..............

N/A IF CURRENTLY SHUTDOWN, ESilMATED STARTUP DATE......N/A 9208130269 920011 PDR -ADOCK 05000423 R-PDR

. -_.