Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099G399 + (11:32:23, 13 December 2024)
- ML20099G401 + (11:32:23, 13 December 2024)
- ML20099G394 + (11:32:24, 13 December 2024)
- ML20099G391 + (11:32:25, 13 December 2024)
- ML20099G390 + (11:32:26, 13 December 2024)
- ML20099G388 + (11:32:26, 13 December 2024)
- ML20099G384 + (11:32:27, 13 December 2024)
- ML20099G386 + (11:32:27, 13 December 2024)
- ML20099G377 + (11:32:28, 13 December 2024)
- ML20099G371 + (11:32:29, 13 December 2024)
- ML20099G375 + (11:32:29, 13 December 2024)
- 05000275/LER-1985-010, :on 850205,audit Determined That 6-month Leak Test on 400-mCi Cs-137 Check Source Not Performed within Time Requirement.Caused by Incorrect Classification of Sealed Source.Applicable Records Corrected + (11:32:31, 13 December 2024)
- ML20099G368 + (11:32:32, 13 December 2024)
- ML20099G363 + (11:32:33, 13 December 2024)
- ML20099G365 + (11:32:33, 13 December 2024)
- ML20099G361 + (11:32:34, 13 December 2024)
- ML20099G358 + (11:32:35, 13 December 2024)
- ML20099G359 + (11:32:35, 13 December 2024)
- 05000254/LER-1985-001-08, :on 850205,during HPCI Pump Operability Test,Hpci Turbine Could Not Be Reset from Control Room. Caused by Failure of HPCI Turbine Trip & Reset Solenoid Valves of HPCI Stop Valve.Valves Repaired + (11:32:37, 13 December 2024)
- ML20099G344 + (11:32:38, 13 December 2024)
- BECO-84-197, Informs That Existing Purge/Vent Related Tech Specs Per TMI Item II.E.4.2 Conform W/Model Tech Specs Supplied as Attachment 4 of .Installation of Different Valves Does Not Require Tech Spec Amend + (11:32:39, 13 December 2024)
- ML20099G342 + (11:32:39, 13 December 2024)
- ML20099G336 + (11:32:40, 13 December 2024)
- ML20099G334 + (11:32:41, 13 December 2024)
- ML20099G331 + (11:32:42, 13 December 2024)
- ML20099G330 + (11:32:43, 13 December 2024)
- 2CAN118406, Requests That Portion of 820105 Tech Spec Request,Changing Designation from One Heat Detector to Two Flame Detectors Per Room Be Processed.Processing of Request Would Allow Removal of Fire Watch + (11:32:44, 13 December 2024)
- ML20099G326 + (11:32:44, 13 December 2024)
- ML20099G320 + (11:32:45, 13 December 2024)
- ML20099G315 + (11:32:46, 13 December 2024)
- ML20099G316 + (11:32:46, 13 December 2024)
- RBG-20274, Final Deficiency Rept DR-270 Re Lateral Restraints That Function as Both Deadweight Supports & zero-gap Restraints. Initially Reported on 850115.Engineering & Design Coordination Repts C-6833 & C-6869 Re Restraints Issued + (11:32:47, 13 December 2024)
- ML20099G310 + (11:32:48, 13 December 2024)
- ML20099G305 + (11:32:49, 13 December 2024)
- ML20099G302 + (11:32:50, 13 December 2024)
- ML20099G300 + (11:32:51, 13 December 2024)
- ML20099G298 + (11:32:52, 13 December 2024)
- ML20099G294 + (11:32:53, 13 December 2024)
- ML20099G292 + (11:32:54, 13 December 2024)
- ML20099G288 + (11:32:54, 13 December 2024)
- 05000275/LER-1985-007, :on 850204 & 05,control Room Ventilation Sys Automatically Transferred from Normal Mode to Pressurization Mode.Caused by Contractor Technician Performing Startup Testing on Unit 2 Solid State Protection Sys + (11:32:56, 13 December 2024)
- 05000261/LER-1985-008, :on 850203,short Circuit on Terminal Board for Radiation Monitor R-21 Vacuum Pump Occurred.Caused by Decontamination Activities Using Pressurized Water.Faulty Circuit Isolated & Feeder Breaker Replaced + (11:32:58, 13 December 2024)
- ML20099G282 + (11:32:59, 13 December 2024)
- ML20099G279 + (11:33:00, 13 December 2024)
- GO2-92-189, Forwards Rev 12 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) + (11:33:01, 13 December 2024)
- 05000259/LER-1985-003-03, :on 850205,diesel Generators C & D Inadvertently Started.Caused by Voltage Spike Trip Causing Cooling Tower Transformer Overpressurization Relays to Operate.Caution Signs Posted + (11:33:02, 13 December 2024)
- ML20099G274 + (11:33:03, 13 December 2024)
- GO2-92-188, Forwards Rev 23 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (11:33:07, 13 December 2024)
- ML20099G267 + (11:33:08, 13 December 2024)
- ML20099G265 + (11:33:09, 13 December 2024)
- 05000237/LER-1985-001, :on 850104,4-kV Breaker 2329 Failed to Trip Open During Relay Testing.Caused by Four Disconnected Wires in Trip Logic.Wires Reconnected + (11:33:10, 13 December 2024)
- ML20099G258 + (11:33:12, 13 December 2024)