General Offices
- Seiden Street, Berkn, Connecticut j
[,'e',.
.$7 ~~
HARTFORD CONNECTICUT 06141-0270 P.O. BOX 270
.em an w.
(203) 666-6911 g
g October 1,1984 Docket No. 50-423 A02939 A04238 Director of Nuclear Reactor Regulation Mr. B. J. Youngblood, Chief Licensing Branch No.1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
References:
(1)
W. G. Counsil to D. G. Eisenhut, A02959, dated April 15, 1983.
(2)
W. G. Counsil to B. J. Youngblood, B11111, dated April 19, 1984.
(3)
B. J. Youngblood letter to W. G. Counsil, Issuance of Safety Evaluation Report (NUREG-1031) Millstone Nuclear Power Station, Unit No. 3, dated August 2,1984.
Dear Mr. Youngblood:
Millstone Nuclear Power Station, Unit No. 3 Supplement I to NUREG-0737 Emergency Operating Procedures Generation Package In accordance with our commitment made in References (1) and (2), Northeast Nuclear Energy Company (NNECO) hereby submits the Emergency Operating Procedures Generation Package (PGP) for Millstone Unit No. 3. In addition, we consider this submittal suf ficient to complete NNECO's action for confirmatory item (Table 1.4) number sixty-two (62) described in Reference (3).
The PGP includes a plant-specific writer's guide and descriptions of our training, verification, and validation programs.
The Westinghouse Owners' Group Emergency Response Guidelines, Revision 1, were used to develop the Emergency Operating Procedures (EOPs). The attached PGP describes how the EOPs were developed from these generic technical guidelines and includes justifications for all deviations from these generic technical guidelines.
The EOP Validation Program described in Attachment No. 4 may need to be revised due to potential changes in cur schedule to implement a Safety Parameter Display System.
/v I
,,()d B411270226 841001 PDR ADOCK 05000423
\\
f F
PDR t
..j
- ln addition to the EOPs based upon the generic technical guidelines, five (3) plant-specific EOPs which generally involve actions taken outside the control y
room are also discussed in the PGP for completeness.
-If you have any questions regarding this submittal, please contact our.llcensing representative, Ms. P. Capello-Bandzes at (203) 665-3714.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY, et. al.
BY: NORTHEAST NUCLEAR ENERGY COMPANY, Their Agent-l u) h$
i W. G. Counsil l
Senior Vice President I'
l By: C. F. Sears Vice President cc:
Mr. F. J. Liederbach NRC Procedures and Systems Review Branch STATE OF CONNECTICUT )
) ss. Berlin COUNTY OF HARTFORD
)
Then personally appeared before me C. F. Sears, who being duly sworn, did state I
that he is Vice President of Northeast Nuclear Energy Company, an Applicant herein, that he is authorized to execute and file the foregoing information in the i
name and on behalf of the Applicants herela and that the statements contained in said information are true and correct to the best of his knowledge and belief..
On 2 At o 07tdhd Notary P lic bify Commasten D;!res March 31,1999 l'
- .~
J
g General Offices
- Selden Street, Berlin Connecticut 3
P.O. BOX 270 C.E.72"""
HARTFORD. CONNECTICUT 06141-0270 L
g (203) 666-6911 es==a co, October 1,1984 Docket No. 50-423 A02959 A04258 Director of Nuclear Reactor Regulation Mr. B. J. Youngblood, Chief Licensing Branch No. I Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
References:
(1)
W. G. Counsil to D. G. Eisenhut, A0295.', dated April 15, 1983.
(2)
W. G. Counsil to B. J. Youngblood, Billli, dated April 19, 1984.
(3)
B. J. Youngblood letter to W. G. Counsil, Issuance of Safety Evaluation Report (NUREG-1031) Millstone Nuclear Power Station, Unit No. 3, dated August 2,1984.
Dear Mr. Youngblood:
Millstone Nuclear Power Station, Unit No. 3 Supplement I to NUREG-0737 Emergency Operating Procedures Generation Package In accordance with our commitment made in References (1) and (2), Northeast Nuclear Energy Company (NNECO) hereby submits the Emergency Operating Procedures Generation Package (PGP) for Millstone Unit No. 3. In addition, we consider this submittal sufficient to complete NNECO's action for confirmatory item (Table 1.4) number sixty-two (62) described in Reference (3).
The PGP includes a plant-specific writer's guide and descriptions of our training, verification, and validation programs.
The Westinghouse Owners' Group Emergency Response Guidelines, Revision 1,
were used to develop the Emergency Operating Procedures (EOPs). The attached PGP describes how the EOPs were developed from these generic technical guidelines and includes justifications for all deviations from these generic technical guidelines.
The EOP Validation Program described in Attachment No. 4 may need to be revised due to potential changes in our schedule to implement a Safety Parameter Display System.
- In addition to the EOPs based upon the generic technical guidelines, five (5) plant-specific EOPs which generally involve actions taken outside the control room are also discussed in the PGP for completeness.
If you have any questions regarding this submittal, please contact our licensing representative, Ms. P. Capello-Bandzes at (203) 665-3714.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY, et. al.
BY: NORTHEAST NUCLEAR ENERGY COMPANY, Their Agent W iC. bi W. G. Counsil Senior Vice President C
By: C. F. Sears Vice President cc:
Mr. F. 3. Liederbach NRC Procedures and Systems Review Branch STATE OF CONNECTICUT )
) ss. Berlin COUNTY OF HARTFORD
)
Then personally appeared before me C. F. Sears, who being duly sworn, did state that he is Vice President of Northeast Nuclear Energy Company, an Applicant herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Applicants herein and that the statements contained-in said information are true and correct to the best of his knowledge and belief.
OueAN !/C?
i<d Notary Pgblic y Commission Expires March 31,1983 y'7 I
E g
General Offices
- Seiden Street, Berlin, Connecticut j
P.O. BOX 270
,c,...,
,c co,,,,,,,
HARTFORD. CONNECTICUT 06141-0270 L
g g
(203) 666-6911
- car'<
v' s
cow.,r October 1,1984 Docket No. 50-423 A02959 A04238 Director of Nuclear Reactor Regulation Mr. B. 3. Youngblood, Chief Licensing Branch No. I Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
References:
(1)
W. G. Counsil to D. G. Eisenhut, A02959, dated April 15, 1983.
(2)
W. G. Counsil to B. 3. Youngblood, B11111, dated April 19, 1984.
(3)
B. 3. Youngblood letter to W. G. Counsil, Issuance of Safety Evaluation Report (NUREG-1031) Millstone Nuclear Power Station, Unit No. 3, dated August 2,1984.
Dear Mr. Youngblood:
Millstone Nuclear Power Station, Unit No. 3 Supplement I to NUREG-0737 Emergency Operating Procedures Generation Package In accordance with our commitment made in References (1) and (2), Northeast Nuclear Energy Company (NNECO) hereby submits the Emergency Operating Procedures Generation Package (PGP) for Millstone Unit No. 3. In addition, we consider this submittal sufficient to complete NNECO's action for confirmatory item (Table 1.4) number sixty-two (62) described in Reference (3).
The PGP includes a plant-specific writer's guide and descriptions of our training, verification, and validation programs.
The Westinghouse Owners' Group Emergency Response Guidelines, Revision 1, were used to develop the Emergency Operating Procedures (EOPs). The attached PGP describes how the EOPs were developed from these generic technical guidelines and includes justifications for all deviations from these generic technical guidelines.
The EOP Validation Program described in Attachment No. 4 may need to be revised due to potential changes in our schedule to implement a Safety Parameter Display System.
u
\\
1
- In addition to the EOPs based upon the generic' technical guidelines, five (5) plant-specific EOPs which generally involve actions taken outside the control room are also discussed in the PGP for completeness.
If you have any questions regarding this submittal, please contact our licensing representative, Ms. P. Capello-Bandzes at (203) 665-3714.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY, et. al.
BY: NORTHEAST NUCLEAR ENERGY COMPANY, Their Agent W.b W. G. Counsil Senior Vice President By: C. F. Sears Vice President cc:
Mr. F. 3. Liederbach NRC Procedures and Systems Review Branch STATE OF CONNECTICUT )
) ss. Berlin COUNTY OF HARTFORD
)
Then personally appeared before me C. F. Sears, who being duly sworn, did state that he is Vice President of Northeast Nuclear Energy Company, an Applicant herein, that he is_ authorized to execute and file the foregoing information in the name and on behalf of the Applicants herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.
/0 CX,,4 n #owa)
J Notar lic '
[-
Jc yP c
- ma,m, un. im
.