Text
ll 1
va i-, w..,
,, s n c,..,
Cura:rba hmleur Garretton Drivrtmeist Vicetyn; dent 4 MOO CotswtJ A'vad (en)M).32(u Oflice k?k SC 2M45
@L')All 3126 L t t
DUKl? POWER August 5,1992 U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk Washington, DC 20555
Subject:
Catawba Nuclear Station, Unit 2 Docket No. 50-414 Twenty-third Quarterly Update to Startup Report In accordance with Section 6.9.1.3 of the Catawba Nuclear Station Technical Specifications, find attached the twenty-third quarterly update to the Unit 2 Startup Report.
As indicated in the report, all testing is complete.
Very tally yours, VM 1[)he- %%
M. S. Tt.ckman CRIJ23STUPSR Attachment ~
xc: S. D. Ebneter -
Regional Administrator, Region II
- R. E. Martin. ONRR-W. T. Orders Senior Resident Inspector p
!~
140029 p
1 0
9200140200 920605 jv'A 4
PDR ADOCK 05000414 hgf
.R i:
PDR i
L f
STARTUP REPORT QUARTERLY UPDATE CATAWBA UNIT 2 CYCLE 1 August 5,1992 TESTING COh1PLETED DEtING OUARTER The 2A Diesel Generator piping was ruodified and tested. Vibration levels on tiie 2A Diesel Generator now ineet the acceptance criteria.
S_TA311SSF TESTING NOT COMPLET]3
/.11 testing is complete.
_