- 05000364/LER-1984-012-01, :on 841026,reactor Tripped Due to General Warnings in Both Trains of Solid State Protection Sys. Caused by Operator Error During Operability Test.Operator Counseled + (11:14:00, 13 December 2024)
- ML20099M208 + (11:14:01, 13 December 2024)
- 05000271/LER-1984-022, :on 841022,diesel Generator 1-1-A Experienced Generator Lockout Trip.Caused by Differential Relay Trip, Resulting from Failure of Zener Diode.Relays Repaired.Newer Version of Relay Will Be Installed + (11:14:03, 13 December 2024)
- ML20099M181 + (11:14:04, 13 December 2024)
- ML20099M177 + (11:14:05, 13 December 2024)
- ML20099M175 + (11:14:09, 13 December 2024)
- 05000397/LER-1984-075-01, :on 840709,standby Diesel Generator 1B Incurred High Vibration Alarm.Caused by Slip Ring End Bearing Turning on & Destroying Insulation & Allowing Shaft to Rub on Bearing Housing + (11:14:10, 13 December 2024)
- 05000352/LER-1985-019, :on 850129,discovered HPCI Room Differential Temp Switch W/Reversed Thermocouple Leads.Caused by Unlabeled Reversed Thermocouple Wires.Thermocouple Wire Labeled & Connected to Proper Terminals + (11:14:12, 13 December 2024)
- B11365, Forwards Physical Security Plan for Receipt of Nuclear Fuel. Plan Withheld (Ref 10CFR73.21 & 2.790) + (11:14:14, 13 December 2024)
- ML20099M166 + (11:14:14, 13 December 2024)
- 05000364/LER-1984-011-01, :on 841023,review of 841020 Calibr Test Determined That Potentiometer Settings for Inputs from Power Range Channel N43 to Loop 3 Overtemp Delta T Circuit Not within Tech Specs.Potentiometers Reset + (11:14:16, 13 December 2024)
- ML20099M159 + (11:14:17, 13 December 2024)
- 05000296/LER-1984-006, :on 840517,welds Inspected on Jet Pump Instrument Nozzles.Two Welds Needed Repair.Welds Will Be Repaired by Overlay Procedure Prior to Startup.Insp Plan Underway During Refueling Outage + (11:14:19, 13 December 2024)
- ML20099M146 + (11:14:20, 13 December 2024)
- RBG-20324, Final Deficiency Rept DR-229 Re Installation of Eight Incore Guide Tube Stabilizer &/Or Cross Tie Bars Supplied by Ge. Assembly of Guide Tubes Not Possible Due to Orientation of Cross Tie Bars.Not Reportable Per 10CFR50.55(e) + (11:14:21, 13 December 2024)
- 05000362/LER-1984-035-01, :on 840821,review of Operator Logs Identified Train a HPSI Subgroup Relay Testing Conducted Concurrent W/Draining of Saltwater Side of Train B Component Cooling Water HX + (11:14:23, 13 December 2024)
- ML20099M129 + (11:14:24, 13 December 2024)
- ML20099M124 + (11:14:24, 13 December 2024)
- 3F1295-22, Forwards Evaluation Results Re Insp Rept 50-302/95-22.Rept Included Review of Unauthorized Make-Up Tank Evolutions of 940904-05 & Verified Other Make-up Tank Info Recently Given to Util + (11:14:25, 13 December 2024)
- 05000361/LER-1984-064, :on 841030,train a of Fuel Handling Isolation Sys Inadvertently Actuated.Caused by Personnel Error.All Instrumentation & Control Technicians Cautioned.Keylock Bypass Switch Installation Under Investigation + (11:14:27, 13 December 2024)
- ML20099M101 + (11:14:28, 13 December 2024)
- ML20099M089 + (11:14:28, 13 December 2024)
- ML20099M085 + (11:14:29, 13 December 2024)
- ML20099M082 + (11:14:30, 13 December 2024)
- 05000413/LER-1984-018-02, :on 841023,in-core Thermocouple Tube Leakage Occurred.Caused by Separation of Stainless Steel Conduit from Swagelok Tube Fitting.Thermocouple Replaced + (11:14:31, 13 December 2024)
- ML20099M072 + (11:14:32, 13 December 2024)
- ML20099M063 + (11:14:33, 13 December 2024)
- SNRC-1113, Application for Amend to CPPR-95,extending Const Completion Date from 841231 to 850330,due to Litigation on Tdi Emergency Diesel Generator.Decision Expected in Early 1985 + (11:14:34, 13 December 2024)
- ML20099M060 + (11:14:35, 13 December 2024)
- ML20099M033 + (11:14:35, 13 December 2024)
- ML20099M031 + (11:14:36, 13 December 2024)
- ML20099M016 + (11:14:37, 13 December 2024)
- ML20099M015 + (11:14:38, 13 December 2024)
- ML20099M014 + (11:14:39, 13 December 2024)
- ML20099M012 + (11:14:39, 13 December 2024)
- ML20099M007 + (11:14:42, 13 December 2024)
- ML20099M005 + (11:14:44, 13 December 2024)
- ML20099L994 + (11:14:46, 13 December 2024)
- ML20099L993 + (11:14:47, 13 December 2024)
- ML20099L985 + (11:14:49, 13 December 2024)
- IR 05000282/1984015 + (11:14:50, 13 December 2024)
- ML20099L962 + (11:14:51, 13 December 2024)
- ML20099L958 + (11:14:52, 13 December 2024)
- ML20099L942 + (11:14:52, 13 December 2024)
- ML20099L924 + (11:14:53, 13 December 2024)
- ML20099L921 + (11:14:54, 13 December 2024)
- PY-CEI-NRR-0216, Forwards MDE-10-0185, Perry Plant Unique Encroachments Final Test Rept. Rept Addresses Outstanding Issue 8 in Sser 4.Updated Response Will Be Provided by 850501.Affidavit of R Artigas Encl.Rept Withheld + (11:14:54, 13 December 2024)
- 05000336/LER-1995-044, :on 951129,discovered Surveillance Period for Containment Air Lock Testing Exceeded 25% Extension.Caused by Unclear TS Surveillance Requirements.Changed Manual to Clarify When to Use 4.0.2 Requirement + (11:14:56, 13 December 2024)
- ML20099L906 + (11:14:57, 13 December 2024)
- ML20099L892 + (11:14:58, 13 December 2024)
- ML20099L891 + (11:15:02, 13 December 2024)