List of results
- ML20100H158 + (10:48:33, 13 December 2024)
- RC-96-0048, 1995 Annual Operating Rept VC Summer Nuclear Station. W/ + (10:48:34, 13 December 2024)
- ML20100H156 + (10:48:34, 13 December 2024)
- ML20100H148 + (10:48:35, 13 December 2024)
- ML20100H147 + (10:48:36, 13 December 2024)
- ML20100H142 + (10:48:38, 13 December 2024)
- ML20100H141 + (10:48:38, 13 December 2024)
- ML20100H138 + (10:48:40, 13 December 2024)
- ML20100H137 + (10:48:41, 13 December 2024)
- 05000259/LER-1985-005-03, :on 850227,during HPCI Sys Surveillance Testing,Time to Reach Rated Flow 2 Longer than Surveillance Instruction Spec of 25 S.Caused by Inadvertent Closing of Ball Valve on Turbine Hydraulic Sys + (10:48:43, 13 December 2024)
- 05000296/LER-1985-004, :on 850122,Surveillance Instruction 4.3.A.2 Performed 1 Day Later than Allowed by Tech Specs.Caused by Personnel Error in Interpreting Frequency Requirements. Procedures Re Performance Dates Revised + (10:48:46, 13 December 2024)
- ML20100H132 + (10:48:48, 13 December 2024)
- 05000260/LER-1985-003-04, :on 850227,automatic Scram Occurred When Fuses Removed from Reactor Protection Sys Circuitry During Mod. Caused by Deficient Work Plan.Plan Revised + (10:48:49, 13 December 2024)
- ML20100H127 + (10:48:54, 13 December 2024)
- 05000259/LER-1985-001-01, :on 850121,drywell Leakage Rate in Excess of Tech Specs Noted.Caused by Leak in Temporary Hose Used to Test Check Valve & Small Weld Crack Inside Drywell.Crack Repaired.Procedures Revised + (10:48:56, 13 December 2024)
- ML20100H121 + (10:48:58, 13 December 2024)
- PY-CEI-NRR-2022, Provides Operating Licensing National Exam Schedule,Which Reflects Anticipated Exam Dates for FY96-99 + (10:48:59, 13 December 2024)
- ML20100H112 + (10:49:00, 13 December 2024)
- HL-5116, Forwards Proposed Operator Licensing Schedule for FY96-99. Informs That 1996 Dates for Licensed Operator Requalification Exams Scheduled for Wks of 960812,26,0909, 23 & 1007 + (10:49:01, 13 December 2024)
- 05000251/LER-1985-021, :on 840920,turbine Runback & Reactor Trip Occurred Upon Nis Rod Drop Signal.Caused by Failure of Inverter 4A to Provide Power to Vital 120-volt Instrument Bus,Panel 4P07,due to Blown Fuse + (10:49:03, 13 December 2024)
- 3F0296-16, Forwards Completed NRC Form 536, Operator Licensing Exam Data for Facility as Requested in Administrative Ltr 96-01, Including Info Re Estimated Number of Candidates to Be Examined During Visits to Site + (10:49:04, 13 December 2024)
- U-602556, Forwards Initial Operator Exam Schedule Requested in NRC Administrative Ltr 96-01.Next Operator Requalification Exam as Listed + (10:49:05, 13 December 2024)
- ML20100H092 + (10:49:07, 13 December 2024)
- ML20100H096 + (10:49:07, 13 December 2024)
- ML20100H088 + (10:49:08, 13 December 2024)
- ML20100H086 + (10:49:10, 13 December 2024)
- ML20100H085 + (10:49:11, 13 December 2024)
- 05000269/LER-1985-003-01, :on 850222,emergency Safeguard Features Actuation Sys Setpoint for Initiation of HPI Set Too Low. Caused by sensor-instrumentation Error.Hpi Actuation on Low RCS Pressure Setpoint Reset + (10:49:13, 13 December 2024)
- NLS8500048, Public Version of Rev 3 to General Ofc Guidelines Manual for Emergency Response Activities + (10:49:14, 13 December 2024)
- ML20100H077 + (10:49:15, 13 December 2024)
- ML20100H068 + (10:49:18, 13 December 2024)
- 05000416/LER-1995-012, :on 951102,discovered That Allowable Opening Area for CR Envelope Boundary Exceeded.Caused by Inaffective or Incomplete C/A of Previous CR Envelope Event.Wos for Control Bldg Verified & Access Panels Labeled + (10:49:20, 13 December 2024)
- 05000325/LER-1985-013, :on 850307 & 22,control Bldg HVAC Sys Manually Isolated Due to Receipt of High Chlorine Alarms at Chlorination Sys Storage Location.Cause Not Determined + (10:49:22, 13 December 2024)
- 05000261/LER-1985-010, :on 850301,reactor Tripped from 52% Power Due to Loss of Feed Flow to Steam Generator B.Caused by Air Line Separation from Feedwater Regulating Valve Due to Valve Vibrations.Valve Internals to Be Replaced + (10:49:24, 13 December 2024)
- ML20100H060 + (10:49:26, 13 December 2024)
- 3F0296-08, Provides Brief Discussion of Facility Refueling Outage 10 Activities of Mutual Interest + (10:49:27, 13 December 2024)
- ML20100H051 + (10:49:28, 13 December 2024)
- ML20100H050 + (10:49:29, 13 December 2024)
- ML20100H049 + (10:49:30, 13 December 2024)
- 05000454/LER-1985-026, :on 850228,radiation Monitor 1PR11J Left Isolated from Containment Atmosphere After Maint Activity on Valve 1PR001B.Administrative Controls Implemented to Ensure Sys Integrity/Proper Restoration After Maint + (10:49:35, 13 December 2024)
- ML20100H025 + (10:49:37, 13 December 2024)
- 05000395/LER-1996-002, :on 960126,voluntary Entry Into TS 3.0.3 Made to Recover Train a Chillwater Due to Equipment Problem on Chiller a Which Was Supplying Train a ESF Equipment.No Specific Corrective Action for Event Warranted + (10:49:39, 13 December 2024)
- LIC-96-0015, Requests NRC Approval to Implement Provisions of ASME Code Case N-533 in Lieu of Requirements Stated in Article IWA-5242(a),re Insulation Removal for Class 1 pressure- Retaining Bolted Connections + (10:49:40, 13 December 2024)
- 05000446/LER-1996-002, :on 960126,noted That TS Surveillance for Turbine Overspeed Missed Due to Oversight in Rescheduling Required Surveillance by Cognizant Personnel.Test Completed on 960126 & Event Reviewed as Lesson Learned + (10:49:42, 13 December 2024)
- 3F0296-09, Requests Exemption from Section III.G.2 of 10CFR50,App R Re Certain Redundant Cables & Equipment in Reactor Containment Bldg at Facility + (10:49:44, 13 December 2024)
- ML20100G994 + (10:49:45, 13 December 2024)
- ML20100G970 + (10:49:45, 13 December 2024)
- 05000395/LER-1996-001, :on 960119,discovered Condition Not Covered by Plant Operating Emergency Procedures.Caused by Personnel Error.Use of Charging/Si Pump C on ESF Train B Administratively Restricted + (10:49:47, 13 December 2024)
- ML20100G967 + (10:49:49, 13 December 2024)
- ML20100G956 + (10:49:50, 13 December 2024)
- 0CAN029612, Forwards Corrected Page 15 of 17 of Attachment to 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Correcting Last Sentence of Last Paragraph as Listed + (10:49:50, 13 December 2024)