ML20100H049

From kanterella
Jump to navigation Jump to search
Forwards Callaway Nuclear Plant FFD Program Performance Data for Six Months Period Jul-Dec 1995
ML20100H049
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/16/1996
From: Peevy J
UNION ELECTRIC CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3335, NUDOCS 9602270012
Download: ML20100H049 (5)


Text

..

i Callaway Plant

. Post Oltice Box 620 x_.

' fulton. Missouri 65251 r

Union February 16,1996 Etscraic UtxRC-3335 P3 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attention:. Document Control Desk MailStop P1-137 Washington,DC 20555

Gentlemen

i In complying with the Fitness For Duty Rule,10CFR26.71(d), Recordkeeping Requirements, please find enclosed Union Electric's Callaway Nuclear Plant Fitness For

^

Duty Program Performance Data for the six (6) month period beginning July L 1995 and ending on December 31,1995.

Enclosures include:

Attachment A - Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (2 pages) i Attachment B - Fitness For Duty Management Action (1 page)in regards to:

1 Initiatives Taken Reportable Fitness For Duty Events Under 10CFR26.73.

l If you have any questions in regard to the Performance Data Reported, please f

contact me at (314) 676-8246.

[

t Sincerely, i

b-

)

v)

\\pww ames R. Peevy

- Manager, Emergency Preparedness Organization Support Fitness For Duty Manager

%b l

JRP/RGR/PJD/djr-r$01 W f

. Enclosures f

~

9602270012 960216 I

PDR ADOCK 05000483 i

i R

PDR i

l c

i w/ attachments I

cc:

L. J. Callan, Regional Administrator

. U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 l

Arlington, TX 76011-8064 l

D. G. Passehl/F. L. Brush Resident NRC Inspector, Callaway Plant l

Callaway Resident Office t

U. S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077-1302 L. R. Wharton (2 Copies)

Licensing Project Manager, Callaway Plant t

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission i

Mail Stop 13-E-21 Washington,DC 20555

' Missouri Public Service Commission i

Manager, Electric Department P.O. Box 360 JeffersonCity,MO 65102 Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street, N.W.

Washington,DC 20037 P

r 5

e

Fitzess Fcr Duty Pr: gram

/

Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92)

Union Electric July - December 1995 Company 6 Months Callaway Plant Location Patricia Davis. R. N.

(573)676-4300 Contact Name Phone (Include Area Code)

Cutoffs: Screen / Confirmation (ng/ml)

O Appendix A to 10CFR26 Marijuana 20/

15 Amphetamines 1000/ 250 Barbiturates 300/ 150 Cocaine 300/

150 Phencyclidine 25/

25 Benzodiazepines 300/ 150 Opiates 300/

150 Alcohol

(.04% BAC)

Long-Term i

Short-Term Testing Results License Employees Contractor-Personnel Contractor-Personnel Average Number with Unescorted Access 917 145 153 Categories Tested Positive Tested Positive Tested Positive Pre-Access 10 0

0 0

73 1

Post Accident 0

0 0

0 0

0 Observed Behavior 0

0 0

0 0

0 Random 232 1

33 0

23 0

Follow-up 4

0 0

0 1

0 Other 2

0 1

0 0

0 TOTAL 248 1

34 0

97 1

Attachment A Page 1 of 2

Breakdown of Confirmed Positive Tests for Specific Substances

- 1.-

2-Cocame Opiates

  • A..c,.... m.

Phencydidine Alcohoi RefusaltoTest Barbeurales

'~

ucensee-1 Employees Long-Term contractors Short-Term -

1 Contradors 1

0 1

0 0

0 0

0 0

  • Left Side - Record of test results that would have been Positive at the NRC cutefflevel.

Right Side - Record of Confirmed Positives based on Union Electric's more stringent cutofflevel.

Category: OTIIER 1 Test For Cause 1 Call-Out 1 Reason - to - Believe Attachment A Page 2 of 2

-e--

%g=-_

w m

7 t

=

+t P'

m ee M

vsei r-M a

v u

1

-w*-----

'- W

ULNRC-3335 February 16,1996 i

e Initiative Taken j

No significant Fitness For Duty Program changes occurred.

j i

l Reportable Fitness For Duty Events Under 10CFR26.73 One significant event occurred during this reporting period. The specimen temperature, of a random collection, was outside the parameters specified by 10CFR26.

j 1

9 f

?

e t

(

+

4 t

Attachment B Page 1 of1 l

- - -- :