Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101E397 + (10:03:35, 13 December 2024)
- ML20101E394 + (10:03:36, 13 December 2024)
- ML20101E389 + (10:03:36, 13 December 2024)
- ML20101E385 + (10:03:37, 13 December 2024)
- 1CAN069204, Monthly Operating Rept for May 1992 for Arkansas Nuclear One Unit 1 + (10:03:38, 13 December 2024)
- ML20101E377 + (10:03:39, 13 December 2024)
- 2CAN069202, Monthly Operating Rept for May 1992 for Arkansas Nuclear One Unit 2 + (10:03:40, 13 December 2024)
- ML20101E373 + (10:03:40, 13 December 2024)
- ML20101E366 + (10:03:41, 13 December 2024)
- 05000315/LER-1984-025-01, :on 841108,firewater Ring Header Valve Surveillance Not Performed Per Tech Spec Requirements.Caused by Misidentification & Poor Labeling of Valves.Pipes & Valves Properly Labeled & Diagrams & Descriptions Corrected + (10:03:43, 13 December 2024)
- ML20101E357 + (10:03:44, 13 December 2024)
- ML20101E354 + (10:03:45, 13 December 2024)
- 05000315/LER-1984-027, :on 841111,fire Watch Performed 25 Minutes Late in Hourly Insp of Inoperable Fire Door Protecting Reactor Cable Tunnel.Caused by Personnel Unfamiliarity W/Bldg Layout & Inadequate Briefings + (10:03:49, 13 December 2024)
- 05000315/LER-1984-026-01, :on 841108,8 H Grab Sample Not Taken & Analyzed for Gross Activity Per Tech Spec Requirements. Caused by Deficiency in Communications.Personnel Reinstructed on Notification Procedures + (10:03:51, 13 December 2024)
- ML20101E326 + (10:03:53, 13 December 2024)
- ML20101E314 + (10:03:54, 13 December 2024)
- ML20101E301 + (10:03:55, 13 December 2024)
- ML20101E300 + (10:03:56, 13 December 2024)
- ML20101E291 + (10:03:57, 13 December 2024)
- RBG-19691, Interim Deficiency Rept DR-218 Re Piston Rods in Brown- Boveri Electric,Inc Type 5HK Circuit Breakers.Next Rept Will Be Provided by 850228 + (10:03:58, 13 December 2024)
- ML20101E284 + (10:03:59, 13 December 2024)
- ML20101E280 + (10:03:59, 13 December 2024)
- RBG-19664, Interim Deficiency Rept DR-210 Re Model 510 DU Card Files Supplied by Rosemount.Next Rept Will Be Provided by 850227 + (10:04:00, 13 December 2024)
- ML20101E264 + (10:04:07, 13 December 2024)
- RBG-19689, Interim Deficiency Rept DR-173 Re Elbows Supplied by GE for Main Steam Supply.Next Rept Will Be Provided by 850110 + (10:04:13, 13 December 2024)
- LIC-96-0034, Submits Annual 10CFR50.46 Summary Rept for 1995.Summary Rept Updates Identified Changes/Error in Loca/Eccs Codes & Methods Used by Westinghouse to Model Unit 1 + (10:04:16, 13 December 2024)
- PY-CEI-NRR-1512, Monthly Operating Rept for May 1992 for Perry Nuclear Power Plant + (10:04:17, 13 December 2024)
- ML20101E208 + (10:04:18, 13 December 2024)
- NRC-92-0059, Monthly Operating Rept for May 1992 for Fermi 2 + (10:04:18, 13 December 2024)
- RBG-19690, Interim Deficiency Rept DR-204 Re Conductor Jacket on 2/c 16 Cable Supplied by Rockbestos.Next Rept Will Be Provided by 850228 + (10:04:19, 13 December 2024)
- ML20101E204 + (10:04:20, 13 December 2024)
- ML20101E203 + (10:04:21, 13 December 2024)
- ML20101E196 + (10:04:22, 13 December 2024)
- RBG-36963, Monthly Operating Rept for May 1992 for River Bend Station + (10:04:22, 13 December 2024)
- ML20101E189 + (10:04:23, 13 December 2024)
- RBG-19663, Interim Deficiency Rept DR-263 Re Thermocouple Extension Cable (NGS-01) Supplied by Rockbestos Co.Next Rept Will Be Provided by 850227 + (10:04:24, 13 December 2024)
- 05000301/LER-1984-008, :841005,containment Isolation Valve Leakage in Excess of Tech Specs.Caused by Worn Bushing in Valve Assembly Causing Valve to Stick Open.Valve Repaired.W/ + (10:04:25, 13 December 2024)
- ML20101E185 + (10:04:30, 13 December 2024)
- ML20101E180 + (10:04:31, 13 December 2024)
- ML20101E178 + (10:04:33, 13 December 2024)
- 05000454/LER-1984-008-07, :on 841115,fire Watch in Diesel Storage Tank Rooms Terminated Before Fire Protection Foam Sys Reestablished.Caused by Poor Communication.Fire Watch Established & Sys Returned to Svc + (10:04:35, 13 December 2024)
- ML20101E170 + (10:04:36, 13 December 2024)
- ML20101E166 + (10:04:37, 13 December 2024)
- ML20101E155 + (10:04:38, 13 December 2024)
- ML20101E149 + (10:04:39, 13 December 2024)
- 3F1184-20, Responds to NRC Re Violations Noted in Insp Rept 50-302/84-28.Corrective Actions:Procedures EM-203 & EM-207 Verified to Be Removed from All Controlled Copies + (10:04:40, 13 December 2024)
- 05000249/LER-1984-018-03, :on 841020,reactor Scram Occurred Due to Low Feedwater Level.Caused by Bad Switch in Master Controller & Broken Valve.New stem-disc Assembly Installed + (10:04:42, 13 December 2024)
- ML20101E132 + (10:04:43, 13 December 2024)
- PY-CEI-NRR-1514, Requests That Svc List Be Updated,Changing Addressee from DE Burke to Me Oreilly + (10:04:44, 13 December 2024)
- ML20101E126 + (10:04:47, 13 December 2024)
- ML20101E119 + (10:04:49, 13 December 2024)