Text
..-
Il I
DukeibwerCornpany M S naarx P.0 Box 1006 Senior Vice President Onarforte, NC282014006 NuclearGeneration (700182220000 ice (704)3824360 Fax 1le-March 15,1996 U.
S.-Nuclear Regulatory Commission l
Washington, D.
C.
20555 Attention:
Document Control Desk
Subject:
Duke Power Company McGuire Nuclear Station Docket Numbers 50-369 and -370 Catawba Nuclear Station Docket Numbers 50-413 and -414 Safety Valve Modeling
References:
- 1) November 15, 1995 letter from W. R. McCollum (DPC) to NRC, " Proposed Technical Specifications (TS) Changes."
- 2) December 19, 1995 letter from M.
S.
Tuckman (DPC) to NRC, " Minor Change to NRC-Approved Methodology."
The purpose of this letter is to provide additional information concerning the two submittals referenced above.
The intent of the' November 15, 1995 submittal was to pursue an increase in the main steam code safety relief valve setpoint tolerance for the current plant configuration.
As i
such, the transient analyses discussed in the technical justification section were those based on the existing Model D steam generator design.
This submittal is completely independent of steam generator replacement, although the i
approval of the submittal will affect the replacement steam gener' tor licensing plan as described below.
The a
corresponding McGuire submittal was approved by the NRC on 4
i August 2, 1994.
The December 19, 1995 submittal seeks NRC concurrence for a l
revision to the pressurizer'and main steam safety valve lift t
modeling in NRC-approved analysis methodologies.
This revision will use a pop-open modeling approach rather than a linear ramping open approach.
This change was made necessary primarily by the turbine trip transient, which was i
reanalyzed in support of the steam generator replacement.
During the course of this reanalysis, it was discovered that due to the increased heat transfer area of the replacement j
steam generator, the peak secondary pressure case did not 4
l 9600220166 960315 PDR ADOCK 05000369 i
P PDR
- i PhntM on renowtpger
S l
meet the acceptance criterion.
Below is a summary of the l
peak secondary pressure results for the pertinent analysis cases:
Acceptance criterion (110% of 1185 psig) 1303.5 psi 9 Model D S/G:
+3% setpoint drift, original lift 1295 setpoints, linear ramp model psig Replacement S/G:
+3% setpoint drift, original lift
>1311 setpoints, linear ramp model psig
+3% se.tpoint drift, reduced lift 1295.8 setpoints, linear ramp model psig
+3% setpoint drift, original lift 1285.7 setpoints, pop-open model psig The revised modeling assumes that the safety valves pop open to a full open position in 0.5 seconds after the drifted lift setpoint is reached.
This assumption is based on the attached documents, in which the valve manufacturers, Crosby and Dresser, and the McGuire/ Catawba valve engineering staff concur that this modeling is adequate to conservatively bound the performance of both the pressurizer and main steam safety valves.
Approval of the increased setpoint tolerance and NRC concurrence with the revised pop-open modeling approach is requested.
No additional Technical Specification changes or engineering effort are necessary to resolve this issue with this approach.
There are no NUREG-0737 commitments regarding the trancient analysis modeling of the safety valves that conflict with this request.
If the increased setpoint tolerance is approved and the valve pop-open modeling is not, the main steam safety valve setpoints will have to be lowered in conjunction with the steam generator replacement.
This will require submittal of additional Technical Specification revisions.
If the increased tolerance is not approved, the turbine trip analysis will not necessitate any setpoint or valve mode. ling changes.
However, the consequence of this course of act2on will be a continuation of licensee reports and engineering evaluations due to the safety valves failing their Technical Specification surveillance and being declared inoperable.
If you would like to discuss this letter further, please call Scott Gewehr at (704) 382-7581.
Very truly yours, faS WG AMahn M. S. Tuckman l
.. ~. _
i cc:
Mr. V. Nerses, Project Manager Office of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D. C.
20555 Mr. R. E. Martin, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 14H25, OWFN Washington, D. C.
20555 i
Mr. S. D. Ebneter, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 i
i Mr. G.
F. Maxwell l
Senior Resident Inspector McGuire Nuclear Station Mr. R. J. Freudenberger Senior Resident Inspector l
Catawba Nuclear Station l
I l
l l
l l
l l
i l
i i
i
l A%cknteni-I
.g
- twrn,
, ca. -. - nmo em unn
- r I wnn
' nnp raw w
nmar _ i J
hoyword: 6ecoWiFV 4td mmt E
P August 29,1995 g
Christy Ray Al)G g 1995 NGD Safety Analysis Group DUKE POWgg N
Re:
McGuire Nuclear Station MSSV Opening Response Time Tech Spec Submittal l
This is to summarize the expected opening response times of the McGuire's Main Steam Safety Valves and to demonstrate that they will open fully within the 0.5 seconds assumed in the Safety Analysis. The l
following valves were manufactured by Crosby and are the subject of this review.
Slyk Siza Set Pressure Open Time Tag Nos HA-65-FN 6Q8 1170 psig*
0.160 sec 1/2 SV2,8,14,20 HA-65-FN 6Q8 1190 psig*
0.090 sec 1/2 SV3,9,15,2i i
HA-75-FN 6R10 1205 psig*
0.110 sec 1/2 SV4,10,16,22 HA-75-FN 6R10 1220 psig*
0.060 sec 1/2 SVS,11,17,23 HA-75-FN 6R10 1225 psig unavailable 1/2 SV6,12,18,24 All valves at McGuire were tested at Crosby's high flow test loop to determined unique ring setting for each valves to assure blowdown performance within a range less than or equal to 10%. 'Ihe tests simultaneously recorded 1) inlet pressure,2) outlet pressure and 3) spindle position on Crosby's Data Acquisition System.
l Although the test was not specifically intended to demonstrate the opening response time for the valves, the i
data did record the opening time for each valve at test conditions with its own unique ring settings.
(
Crosby recently provided one set of test curves, for one valve at each set pressure indicated above with an asterisk (*). These curves (Attachment 1) show typical response time for valves installed at McGuire.
Crosby has not yet provided curves for all valves but has indicted that these curves should represent the opening response of all MSSV's at McGuire.
Since the Crosby tests were intended primarily to validate ring settings for blowdown performance, the inlet pressure ramp rate was not varied to study its effect on opening times. EPRI, however, conducted extensive tests on Pressurizer Safety Valves as required by NUREG-0737. These test by EPRI on a Crosby style HB-BP-86, size 6N8, demonstrated no appreciable relationship between inlet pressurization rate and opening times. With ramp rates varrying between 2 psi /sec and 325 psi /sec, opening times varied little between 0.018 and 0.021 seconds. See Attachment 2, tables 4-2 and 4-3.
Although the Pressurizer Valve tested by EPRI and the Main Steam Saftey Valves tested at Crosby are different styles, they both have a two-ring internal design and are similar in body size. Tests also I
demonstrate that both style valves, under varying conditions, open with a rapid " pop" at valve setpoint.
t We would expect similar inlet pressurization rates to have little effect on the opening time of the MSSV's.
Therefore, the tests performed by Crosby, coupled with those performed by EPRI demonstrate valve opening response times under various inlet conditions, are well within the assumed time of 0.500 seconds.
If you wish to discuss this subject further, please contact the undersigned at 875-5627.
% 4.
Grant Cutri McGuire Valve Engineering
(
Attachments (2)
I I.
',FROM sCROSDY POWER ORCup 5083843152 1995,00-29 09:10 stG55 P.04/05
'\\'"
"Chr'isty Ray
- 8/2'9/95 Attachment i sh 2 of 5
(
10.'0 1: y at car
= 1225.49 2: y at osr = 0.05 in.psig 1: x at car
= 0.52 SEC.
3: y at car
= 0.0 psig
/
1 I
1: MaxY 1251.28
=
2: MaxY 1.04 in.p a
V 1150.0--
(9 4
)
i h $&
O
_ /o' f
- 8 C J e c.
9 I
200.01 2 3 _ _ __1 k
-1.0 r
(VdlW SEC*
l 5.39 f/At NdQ 9.5~f ~ p/ - 00 2 r D en C
A' to G es e ; 5. W see Se t Awu n = iz zo,,,,-
0-
.J/e e f
/ a //
l.
l FROM sCROSDY POWCR GROUP 5003043152 1995.08-29' 09s10 ilG55 P.05/05 I
,dhr.'isty Ray 8/29/95 Attachment I sh 3 of 5 1
( 00.c -
l l
l
, 12 y at car 1210.11 psig
==
j, 2: y at car 7.937E-003 in
=
1: x at car 0.47 SEC.
=
3: y at car 0.0 psig
=
\\
\\
h t
! 11 o,n =_
\\
_-= -
'.9
=
1: MaxY
= 1263.
2: MaxY
= 1.07
\\
Q,,r;.+o
.TV s'or. /7
/. /.1" =. M sec J
,e. 1 23
-1.0
(
\\
SEC.
V s /r.e 5.35i S/ t/ N C09ff 47-
/
D-J'en< vec = oO 3 V h,.s - fo -
c
<a p
s.
- 5. 79 Jce e
>>os~
~ f a ef l o bb i
l
7 9 scnopDY P NG" sesse43ts2 tess.ee-29 09:09 ttGSG P.02/e5
' Christy Ray 8/29/95
. 8h 4.of 5 i
( 30.0 1
i
\\
l 1: MaxY 1218.61 a
2: Maxy
= 0.9 in. ps 1: y at csr
= 1170.84 1: MaxY
= 1218.61 2: y at csr = 0.06 in. psi
)
2: MaxY
= 0.9 in. ps 1: x at csr
= 0.66 SEC.
i 3: y at csr
= 0.0 psig
\\
1150.0 =
paig l-
^
\\
=
k k.
i O
- M - fa ~,9 9 *% c. Y fi L S f,
- =
M s e c.
I,
- 4 t
C00.01 2 3 --*
~ ~
)
~1.O SEC.
S.39
'Va!be T/Ar N SC 9 3) - d/- no o /
S Y fr e
er.r y e a-JJ 7 o (I<y r/, <t.1
.t z-
4 "FRON sCROSDY' POWER GROUP 5083843152 1996.06
'9 09310 lat.>bS P. O 5/Ob
.
- Christy Ray
. 8/29/95 sh 5 of 5 (00.0 1: MaxY 2: MaxY
= 1242.71 psi
= 0.91 in.
1: y at car 1192.97
=
i 2: y at car.
0.05 in,psig
=
1: x at csr 0.74 SEC.
=
3: y at csr 0.0 psig
=
Ir v
t i
A150.0 f
=
( '.g 69 "f:A.69,We/ ~
J.f
.09.rce N
t i
N 000.01. 2 3
.--c,_we.
ml
-1.0
(
.SEC.
V s lV e f /Af A'J T 9 3 7 - of -
5.39 0 0 o J~'
0p.? b-c se ; &' 2 7, Cec S @
Se f fress a r-'
5.deef /s f/
)) ya ff*)
i o
l AHachmend 2.
- 3.,n ng1[ $g g g _ gy r.
w
...., v:
,?
- u
- *.=
.m DPc - 1552. o?- 60 -olb5 p..
X,w
.) UKE POWER April 12,1995 Rolland S. Huffman, Senior Engineer Dresser Industries '
PO Box 1430 l
Alexandria, LA 71309
Subject:
MSSV (Dresser Model 3787) Opening Times File No: CN1205.09 l
Dear Sir,
Due to a historical trend of Main Steam Safety Valve (MSSV) setpoint drift outside of
+/- 1% and a recent trend of performance outside of +/- 3 %, Catawba has initiated a-comprehensive safety analysis considering the potential impact of MSSV setpoint drift.. A significant contributor to our computer modeled analysis is the valve " opening" time.
Catawba Engineering believes that Duke Power assumed an overly conservative MSSV Opening Time during the initial safety analysis. Based on review of extensive, well documented EPRI Safety Relief Valve Test Data performed after TMI, as required by NUREG-0737; the
(
opening times of Dresser Pressurizer Safety Valves (PSV) was consistently shown to be less than 0.1 of a second. Multiple tests were performed with Dresser Model 31709na and 31739a i
PSV's under varied conditions of pressurization rate, system media, ring positions, etc. and i
validate this position.
In addition, Crosby spring actuated safety valves of similar design, j
model HB-BP-86 6N8, also hac' ope'ning times of less than 0.1 of a second. The " POP" action of these safety valves is clearly demonstrated by review of these comprehensive EPRI Test j
Reports.
i i
l
' Attached are excerpts from the EPRI Test Reports representing typical test data and graphical plots of both stem position and steam flow vs time. These two parameters dirtinctly define the valve opening time. A summary of test results are documented on the Test Matrix Table noting the valve " simmer" time, " POP" time, pressurization rate, test media, etc. br each test run. In addition, plots for stem movement and steam flow for Dresser test number 503,606,611,and 1305 which are typical and notably represent varied conditions of pressurization ( from 2.9 to 322 psi /sec ) are attached.
i 4
,\\
l l
.,,.m, m.
The following information is a simple summary of key parameters of stem travel, steam flow, and i
time.which have been recorded from the attached test data / plots.
Time to Full Stem Travel Time to Maximum Steam Flow Pressurization Rate Simmer + POP Time
(> rated steam flow of 508k Ib/hr)
(psi /sec)
( Rated lift Of.588 *)
603
.016 sec .080 see 2.9 606
.020 sec .075'see 296 611
.031 see
.082 sec 308 1202
.020 sec' not available 2.0 1207
.019 sec not available 317 I
l i
Catawba does not have actual full flow test data for the Dresser 3787 MSSV's to support the position of valve opening times of.1 of a second, but CNS Engineering believes that the extensive PSV test data adequately demonstrates the " pop" action of a safety valve of this design and that the MSSV opening times will also be less than.1 seconds. Conservatively, Catawba proposes to model the valves with an opening time of.5 of second or over 500% of the slowest time observed for the PSV.
As per our telephone conversation, please review Catawba's Engineering Evaluation of MSSV opening times and the attached supporting documentation. As the original OEM of Catawba's MSSV's, we need your concurrence of our evaluation that the valves will open in less than.5 seconds, if you concur with the our evaluation please sign below and return
- otherwise, provide comments as to your position and the expected opening time we should assume for our analysis.
{
M' ell i lo l
D eP k r/M uipme t Engineer i
4 i
OEM (Dresser) Engineering Concurrence R.S. Huffman Dresser Industries /SR. Engineer
'k 2
1 5
b
..PR 41 H
' 'J: D US UVH1 LfblNLLR DLPI P.2 The following information is a simple summary of key parameters of stem travel, steam flow, and tithe which have been recorded from the attached test data / plots.
Time to Full stem Travel Time to Maximum Steam Flow Pressurization Rate Simmer + POP Time
(> rated steam flow of 508kItVhr)
(psi /sec)
( Rated lift of.588 *)
603
.016 see
.080 sec 2.9 606
.020 see
.075 sec 296 611
.0315ec
.082 sec 308 1202
.020 see not available 2.0 129/
.019 sec not available 317 l
l Catawba does not have actual full flow test data for the Dresser 3787 MSSVs to support the position of valve opening times of.1 of a second, but CNS Engineering believes that the extensive PSV test data adequately demonstrates the " pop" action of a safety valve of this design ano that the MSSV opening times will also be less than.1 seconds. Conservatively, Catawba proposes to model the valves with an opening time of.5 of second or over 500% of j
the slowest time observed for the PSV.
i As per ourtelephone conversation, please review Catawba's Engineering Evaluation of MSSV opening times and the attached supporting documentation. As the original OEM of Catawba's MSSVs, we need your concurrence of our evaluation that the valves will op,en in less than.5 seconds. If you concur with the our evaluation please sign below and return
- otherwise, provide comments as to your positiert and the expected opening time we should l
assume for our analysis.
i i
~(h N
Kelly i Duke owe / MC quip nt Engineer i
m le ss %gn Yhd Safe)) valve,, 3 D7 w di opm We, agvec.
, 0.u se.e.co l s.
h$Y i
OEM (Dresser) Engineerifi(cot 1currence R.S. Huffman Dresser Industries /SR. Engineer
'(
1 2