ML20101E155

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1992 for Catawba Nuclear Station,Units 1 & 2
ML20101E155
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/31/1992
From: Moser S, Simmons N, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20101E137 List:
References
NUDOCS 9206230085
Download: ML20101E155 (10)


Text

. . .- - .. .- - - - - . . . - . . . - - . - ..

5 CPERATING DATA REFORI 5

DOCKET NO 50-413 DATE June 15. 1992 ODERATINGSTATV1- COMPLETED BY R.A. Willians 5LEPHONE 704-373-5987-

' T 1. Unit Names Catawba 1

2. Reporting feriedt M y 1, 1992-May 31, 1992

- 3.-Licensed Thersal Power (MWt!t 2411 4.'Naseplate Rating (Bross MWeh 1305* Notes *Naeeplate Rating-

5. Design Electrical Rating (Net MWeh  !!45 (Bross MWel calculated as

.6. liarisus Dependable Capacity (Bross MWe):  !!92 1450.000 MA x .90 power

.7. Maxinus Deper.dable Capacity (Net MWe) 1129 fact;r per Page lit,

9.- If Changes Occitr. in Capacity Ratings (! tees Nuster 3 Through 7) Since Last NUEEB-0020, i Report.GiveRersonsi
_

~

9, Power Level To Which Restricted, if Any (Net MWe):

10. Reason for Resi ictiers, If any: _,.

- r-This Month Yr.-to-Date Cueulative

.11. Hours In Reporting Period _ ._

744.0 3647.0 60596.0 12.= Number Of Hours Reactor Was Critical 744.0 3647.0- 46037.2

13. fienctet Reserve Shutdown Hours --0-- ~0 - - --0--

R *iours Generator On-Line . 744.0 3647.0 45042.9

15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Stoss Thersal Energy Becerated (Nil .

24i3584-- 12192238 145678543

17. Gross Electrical Energy Generated (MWH) 985337 4335378 51204792
19. Net Electrical Energy 6ererated (NH) 83?BB5 4113147 4B046841-
19. Unit Service Factor 100.0 100.0 74.2

- 26. Unit Availability Factor-- -100.0 100.0- 74.2

21. Unit Capacity Facter;(Using MDC Net) 100 f, 99.9 69.8

-22.iUnit Capacity Facter (Using DER Net)- 98.6 98.5 69.1 -

23. Unit Forced Dutage Rate; 0.0 0.0 10.7-20 Shutdown Sc6eduled Over Next 6 Months (Type, Date, and Duration of Each):

Re fueline - July 10. 1992 '- 68' days 25 -If Shut Down At End Of Report Feriod. Estimated Date of Startup:

.26.' units In Test ? %tus (Prior to Cossercial Operation): Foiecast A:nieved INITIAL CRITICALITY-INITIAL ELECTRICliV COM*ERCIAL 0? ERAT!0N 9206230085 920615 PDR ADOCK 05000413

_R PDR-

,c , . . . . .. . - . . ~. - - - . - - - . - . , . . - . - . - . . . . . . . - . . . .

- a , a

~

\

2-- .

  • ' - l OPFMTING DATA REPORT

. _ . , DOCKET NO 50-413 -

UNIT Catawba 1 DATE hoe 15, 1992 COMPLETEDBf R.A. Willi ns TELEPHONE 704-373+5987 -)

1.

. GCNTH ; = May,1992 ,

1

= LA1 = AYERABE DAILY POWER LEVEL EA1 AVERAGE DAILY F0WER LEVEL (MWe-Net) (MWe-Net)

(1_ 1131 17~ 1125 2' '1128 18 1124

  • 3 -

'1125 19  !!24

0 '1130- 20 -1132

. -[5 ' 1122 - 21 1131 6, 1133 .22 1135 7 -1135 ' 23 1132

'c-

-8 1137 24 1129 9 {-. 1133 25-  !!25 10 1129 26 '1130 f!! 1131' 27 1131

12. 1127- -- 20 1132 513:- 1127 29 1134 14 1128- 30 1130

-155 l'128 31 1128-

-16 -1103 1

' UNIT SHUTDOWNS AND' POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME CATAwtSA 1 .

DATE UE71d/ 92 REPORT MONTH May 1992 COMPLETED BY s. W. Musta TELEPHONE t/us)-;/3-d/oz __

(1) 2) _

(4) (5)

E HOD T A OF LICENSE N 'Y S SHUT EVENf SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE

'NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Mainte nance or test C-Re f uel ing 2-Manual Scram Ent W Sheets For Licansee Event Report (LER 3-Automatic Scram D-Regulatery Restriction , ,

4-Other (Explain) File (NUEG-Ol61) )

E-Opera'.or Training & License Examination F-Admir istrative (5)

G-Operator Error H-Other (Explain) (Explain) ' Exhibit I - Same Source

a

,.g DOCKET NO: 50 413 UNIT: Catawba 1 DATE: 6/13/92 w

NARRATIVE SUK%RY MONTH: May 1992 Catawba Unit 1 began the month of May operating at 100% full power.

The unit operated at or near 100% full power for the entire month.

1 i

e Prepared by: N. C Simmons Telephone: /04-382-5263 l

l l

t

~

liq 1LTHLY REFUELING INFORMATION REQUEST

._1 . LFacility name: Catawba. Unit 1

2. Scheduled next refueling shutdown: July 1992 3.- Scheduled restart following refueling: SeDtember 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. :Will refueling or resumption or operation thereafter require a technical-specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(n) for submitting proposed licensing action and supporting information.
6. Important lic' nsing considerations (new or different design or supplier, unraviewed design or srfornance analysis methods, significant changes in design or nt operating procedures).
7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 336
8. Present Licensed fuel pool capacity: 1418 Size of requested or plannel increase: -
9. Projected date of last refueling which can be accommodated by present licensed capacity: Sentomber 2009 DUKE POWER COMPANY DATE: June 15. 1992 Name of

Contact:

k. A. Williams Phone: 704-382-5346 l

- ~ , - , . , .. ~ =_. - ~ -, - ..- ~ . ~ ~ . . , ~ . . - .

a . ..

OPERATING DATA REFORT DOCKET WD 50-414 L ATE June 15. 1992 OPEPATINS STATUS - COMPLETEDltY R.A. Willians

. TELEPHONE -704-373-5987

1. Unit Name: Catawba 2 2.; Reporting Period: May 1, 1992-May 31, 1992 3.' Licensed Theraal Power (MWtl's P.!! '
4. Nameplate Rating (Gross MWe): 13054 Notes INameplateRating 5J Desiga Electrical Ratie (Net MWe): 1145 : (Bross MWel calculated as
6. Manisus Dependable Capa. sty _ j6ross MWe): 1192 1450.000 MVA : .90 power
7. Marious Dependable Capacity (Net MWelt 1129c factor per Page. lit,

. 0, if Changes Occur in Capatity Ratings (Itess Nusber 3 Through 7) Since Last HURE6-0020.

= Report.'Give Eeasonst-

- 9. Power Level Te Which Restricted, If Any (Net MWe):

10; Reason For Restrictions,'lf any 1

This Menth Yr.-to-Date Cuaulative 11.: Hours in Reporting Period .

744,0 - 3547.0 -50712.0

12. Number Of Hours Reactor Was. Critical 744,0 3624.4 VNCM

.13. Reactor Reserve Shutdown' Hours -0~ --0-- --0--

.14. Hours Benerator On-Line. 744.0 ?593.9 37157.1

15. Unit Reserve Shutdonn Hours- --0-- --0-- --0--

!.16.16tossTherealEnergyGenerated(MWH): 2504639 11994100 117120277 17.-GrossElectricalEnergyGenerated(MWHI- 290701 4274103 41450008

-18. Net Electrical Energy Generated (MWH) 846305- 4056972 38910841 19.UnitServiceFactor. 100.0 98.5 73.3

20.'UnitAvailabilltyFacter 100.0 98.5 73.3 121.-Ifnit Capacity. Factor 10 sing MDC Neti

~

100.0 99.5 67.7

22. ' Unit Capacity Fatter (Using DER Net) 99.3 97.2 67.0-
23. Unit Forced Dutage Rate- 0.0 1.1- 12.1 24J Shutdown Scheduled Dver Next 6 Nonths (Type, Date, and Duration of Each):

'None' _

"23.=If Shut Down At End Of Report Period. Estiaated Date of Startep:

26. Units'in Test Status (Frior to Cessercial Operation): Forecast Achieved

- IN!I!AL CRITICALITY

. INITIAL ELECTRICITY COMERCIAL OPERAll0N e v w--n, ,-rn.+r. ~md m- e . - - . . + . ,, .-,.,..m- ..-~--...m .-.---.----...--.-4, - ,- *

,, . .. , ,n .. . ~ . . . ~- .. .-... . ~. . .. ~ . ~ .. , , . . . .

O W

Idl . ,

OPERATIN6 DATA REPORT 4

DOCKET NO - 50-414' UNIT Catawba 2-

' DATE June 15.1992 COMPLETED BY P.A. Willia's

-TELEPHONE 704-373-5987 4

RONTH '- May. 1992'

- pf1.- AVERAGE DAltJ F0WER LEVEL E AVERAGE DAILY F0WER LEVEL (MWe-Nat). (MWe-Net).

-1 1149 17 '!!33

E- 1139 10 1131

!3'  !!40 19 1135

'4 1143 20 1143

.5 1142 21 ,

1141 i f6L 1149 22 1135 7 ~1151 23 1106

B 1150 24 1139 t

-9 1147 25 1137 ,

.10 l'143 ' -26 1140 j .s -l'l -- 1144 27  !!43 l-l- ? 1134 2B  !!40

- 13 :

!!37 -

29 1144

' 14 -- -

!!26 30 1140 15I 1102 31 1139 i 16 f122 ~

l i .'

l~

l I

DOCKET NO. 50-414 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME CATAWBA z .

DATE Ue/1d/9z May 1992 COMPLETED BY s. w. Musta REPORT MONTH TELEPHONE t/ue)-J/J-diez (1) 2) (4) (5)

E HOD T A OF LICENSE Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE N TEM COMPONENT ACTION TO O P DURATION O DOWN REPORT NO. CODE CODE PREVENT RECURRENCE

. DATE E HOURS N R/X NO SHUTDOWNS OR REDUCTION S l

(3) (4)

(1)

F Forced (2)

Reason- Method: Exhibit G - Instructions for Preparation of, Data A-Equipment Failure (Explain) 1-Manual S Scheduled B-Maintenance or test 2-Manual Scram EntW Sheets For Licensee Event Report (LER C-Refueling 3-Automatic Scram File (NUREG-OI61))

D-Regulato n R9striction , ,

4-Other (Explain)

E-Operator Training & License Examination ( 5 ).

F-Administrative Exhibit I - Same Source G-Operator Error H-Other (Explain) (Explain) l l

4 o

DOCKET No: 50-414

!" UNIT: Catawba 2 DATE: 6/13/92 NARRATIVE

SUMMARY

MONTH: May 1992 Catawba Unit 2 began the month of May operating at 100% full power.

The unit operated at or near 100% full power for the entire month.

Prepared by: N. C. Simmons

-Telephone:- 704-38'-5263 l

I l

e

4 MONTHLY REFUELING INFORMATION REOUES_T

. l. Facility name: Catawba, Unit 2

2. Scheduled next refueling shutdown: February 1993
3. Scheduled restart following refueling: Aoril 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 T!iOUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Wi' .1 refueling or resumption of operation thereafter require a to:hnical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Lafety Review Committee regarding unreviewed safety questions?

5. Schedulc0 daie(s) for submitting proposed licensing action and supporting i'.. formation.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: ,113 (b) in the spent fuel pool: 280
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9. Projected date - of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE: June 15, 1992 Name of

Contact:

R. A. Williams Phone: 704-382-5346