MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
. . .- - .. .- - - - - . . . - . . . - - . - ..
5 CPERATING DATA REFORI 5
DOCKET NO 50-413 DATE June 15. 1992 ODERATINGSTATV1- COMPLETED BY R.A. Willians 5LEPHONE 704-373-5987-
' T 1. Unit Names Catawba 1
- 2. Reporting feriedt M y 1, 1992-May 31, 1992
- 3.-Licensed Thersal Power (MWt!t 2411 4.'Naseplate Rating (Bross MWeh 1305* Notes *Naeeplate Rating-
- 5. Design Electrical Rating (Net MWeh !!45 (Bross MWel calculated as
.6. liarisus Dependable Capacity (Bross MWe): !!92 1450.000 MA x .90 power
.7. Maxinus Deper.dable Capacity (Net MWe) 1129 fact;r per Page lit,
- 9.- If Changes Occitr. in Capacity Ratings (! tees Nuster 3 Through 7) Since Last NUEEB-0020, i Report.GiveRersonsi
- _
~
9, Power Level To Which Restricted, if Any (Net MWe):
- 10. Reason for Resi ictiers, If any: _,.
- r-This Month Yr.-to-Date Cueulative
.11. Hours In Reporting Period _ ._
744.0 3647.0 60596.0 12.= Number Of Hours Reactor Was Critical 744.0 3647.0- 46037.2
- 13. fienctet Reserve Shutdown Hours --0-- ~0 - - --0--
R *iours Generator On-Line . 744.0 3647.0 45042.9
- 15. Unit Reserve Shutdown Hours --0-- --0-- --0--
- 16. Stoss Thersal Energy Becerated (Nil .
24i3584-- 12192238 145678543
- 17. Gross Electrical Energy Generated (MWH) 985337 4335378 51204792
- 19. Net Electrical Energy 6ererated (NH) 83?BB5 4113147 4B046841-
- 19. Unit Service Factor 100.0 100.0 74.2
- 26. Unit Availability Factor-- -100.0 100.0- 74.2
- 21. Unit Capacity Facter;(Using MDC Net) 100 f, 99.9 69.8
-22.iUnit Capacity Facter (Using DER Net)- 98.6 98.5 69.1 -
- 23. Unit Forced Dutage Rate; 0.0 0.0 10.7-20 Shutdown Sc6eduled Over Next 6 Months (Type, Date, and Duration of Each):
Re fueline - July 10. 1992 '- 68' days 25 -If Shut Down At End Of Report Feriod. Estimated Date of Startup:
.26.' units In Test ? %tus (Prior to Cossercial Operation): Foiecast A:nieved INITIAL CRITICALITY-INITIAL ELECTRICliV COM*ERCIAL 0? ERAT!0N 9206230085 920615 PDR ADOCK 05000413
_R PDR-
,c , . . . . .. . - . . ~. - - - . - - - . - . , . . - . - . - . . . . . . . - . . . .
- - a , a
~
\
2-- .
- ' - l OPFMTING DATA REPORT
. _ . , DOCKET NO 50-413 -
UNIT Catawba 1 DATE hoe 15, 1992 COMPLETEDBf R.A. Willi ns TELEPHONE 704-373+5987 -)
1.
. GCNTH ; = May,1992 ,
1
= LA1 = AYERABE DAILY POWER LEVEL EA1 AVERAGE DAILY F0WER LEVEL (MWe-Net) (MWe-Net)
(1_ 1131 17~ 1125 2' '1128 18 1124
'1125 19 !!24
- 0 '1130- 20 -1132
. -[5 ' 1122 - 21 1131 6, 1133 .22 1135 7 -1135 ' 23 1132
'c-
-8 1137 24 1129 9 {-. 1133 25- !!25 10 1129 26 '1130 f!! 1131' 27 1131
- 12. 1127- -- 20 1132 513:- 1127 29 1134 14 1128- 30 1130
-155 l'128 31 1128-
-16 -1103 1
' UNIT SHUTDOWNS AND' POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME CATAwtSA 1 .
DATE UE71d/ 92 REPORT MONTH May 1992 COMPLETED BY s. W. Musta TELEPHONE t/us)-;/3-d/oz __
(1) 2) _
(4) (5)
E HOD T A OF LICENSE N 'Y S SHUT EVENf SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE
'NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Mainte nance or test C-Re f uel ing 2-Manual Scram Ent W Sheets For Licansee Event Report (LER 3-Automatic Scram D-Regulatery Restriction , ,
4-Other (Explain) File (NUEG-Ol61) )
E-Opera'.or Training & License Examination F-Admir istrative (5)
G-Operator Error H-Other (Explain) (Explain) ' Exhibit I - Same Source
a
,.g DOCKET NO: 50 413 UNIT: Catawba 1 DATE: 6/13/92 w
NARRATIVE SUK%RY MONTH: May 1992 Catawba Unit 1 began the month of May operating at 100% full power.
The unit operated at or near 100% full power for the entire month.
1 i
e Prepared by: N. C Simmons Telephone: /04-382-5263 l
l l
t
~
liq 1LTHLY REFUELING INFORMATION REQUEST
._1 . LFacility name: Catawba. Unit 1
- 2. Scheduled next refueling shutdown: July 1992 3.- Scheduled restart following refueling: SeDtember 1992 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. :Will refueling or resumption or operation thereafter require a technical-specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(n) for submitting proposed licensing action and supporting information.
- 6. Important lic' nsing considerations (new or different design or supplier, unraviewed design or srfornance analysis methods, significant changes in design or nt operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 336
- 8. Present Licensed fuel pool capacity: 1418 Size of requested or plannel increase: -
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: Sentomber 2009 DUKE POWER COMPANY DATE: June 15. 1992 Name of
Contact:
k. A. Williams Phone: 704-382-5346 l
- ~ , - , . , .. ~ =_. - ~ -, - ..- ~ . ~ ~ . . , ~ . . - .
a . ..
OPERATING DATA REFORT DOCKET WD 50-414 L ATE June 15. 1992 OPEPATINS STATUS - COMPLETEDltY R.A. Willians
. TELEPHONE -704-373-5987
- 1. Unit Name: Catawba 2 2.; Reporting Period: May 1, 1992-May 31, 1992 3.' Licensed Theraal Power (MWtl's P.!! '
- 4. Nameplate Rating (Gross MWe): 13054 Notes INameplateRating 5J Desiga Electrical Ratie (Net MWe): 1145 : (Bross MWel calculated as
- 6. Manisus Dependable Capa. sty _ j6ross MWe): 1192 1450.000 MVA : .90 power
- 7. Marious Dependable Capacity (Net MWelt 1129c factor per Page. lit,
. 0, if Changes Occur in Capatity Ratings (Itess Nusber 3 Through 7) Since Last HURE6-0020.
= Report.'Give Eeasonst-
- 9. Power Level Te Which Restricted, If Any (Net MWe):
10; Reason For Restrictions,'lf any 1
This Menth Yr.-to-Date Cuaulative 11.: Hours in Reporting Period .
744,0 - 3547.0 -50712.0
- 12. Number Of Hours Reactor Was. Critical 744,0 3624.4 VNCM
.13. Reactor Reserve Shutdown' Hours -0~ --0-- --0--
.14. Hours Benerator On-Line. 744.0 ?593.9 37157.1
- 15. Unit Reserve Shutdonn Hours- --0-- --0-- --0--
!.16.16tossTherealEnergyGenerated(MWH): 2504639 11994100 117120277 17.-GrossElectricalEnergyGenerated(MWHI- 290701 4274103 41450008
-18. Net Electrical Energy Generated (MWH) 846305- 4056972 38910841 19.UnitServiceFactor. 100.0 98.5 73.3
- 20.'UnitAvailabilltyFacter 100.0 98.5 73.3 121.-Ifnit Capacity. Factor 10 sing MDC Neti
~
100.0 99.5 67.7
- 22. ' Unit Capacity Fatter (Using DER Net) 99.3 97.2 67.0-
- 23. Unit Forced Dutage Rate- 0.0 1.1- 12.1 24J Shutdown Scheduled Dver Next 6 Nonths (Type, Date, and Duration of Each):
'None' _
"23.=If Shut Down At End Of Report Period. Estiaated Date of Startep:
- 26. Units'in Test Status (Frior to Cessercial Operation): Forecast Achieved
- IN!I!AL CRITICALITY
. INITIAL ELECTRICITY COMERCIAL OPERAll0N e v w--n, ,-rn.+r. ~md m- e . - - . . + . ,, .-,.,..m- ..-~--...m .-.---.----...--.-4, - ,- *
,, . .. , ,n .. . ~ . . . ~- .. .-... . ~. . .. ~ . ~ .. , , . . . .
O W
Idl . ,
OPERATIN6 DATA REPORT 4
DOCKET NO - 50-414' UNIT Catawba 2-
' DATE June 15.1992 COMPLETED BY P.A. Willia's
-TELEPHONE 704-373-5987 4
RONTH '- May. 1992'
- pf1.- AVERAGE DAltJ F0WER LEVEL E AVERAGE DAILY F0WER LEVEL (MWe-Nat). (MWe-Net).
-1 1149 17 '!!33
- E- 1139 10 1131
!3' !!40 19 1135
'4 1143 20 1143
.5 1142 21 ,
1141 i f6L 1149 22 1135 7 ~1151 23 1106
- B 1150 24 1139 t
-9 1147 25 1137 ,
- .10 l'143 ' -26 1140 j .s -l'l -- 1144 27 !!43 l-l- ? 1134 2B !!40
- 13 :
!!37 -
29 1144
' 14 -- -
!!26 30 1140 15I 1102 31 1139 i 16 f122 ~
l i .'
l~
l I
DOCKET NO. 50-414 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME CATAWBA z .
DATE Ue/1d/9z May 1992 COMPLETED BY s. w. Musta REPORT MONTH TELEPHONE t/ue)-J/J-diez (1) 2) (4) (5)
E HOD T A OF LICENSE Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE N TEM COMPONENT ACTION TO O P DURATION O DOWN REPORT NO. CODE CODE PREVENT RECURRENCE
. DATE E HOURS N R/X NO SHUTDOWNS OR REDUCTION S l
(3) (4)
(1)
F Forced (2)
Reason- Method: Exhibit G - Instructions for Preparation of, Data A-Equipment Failure (Explain) 1-Manual S Scheduled B-Maintenance or test 2-Manual Scram EntW Sheets For Licensee Event Report (LER C-Refueling 3-Automatic Scram File (NUREG-OI61))
D-Regulato n R9striction , ,
4-Other (Explain)
E-Operator Training & License Examination ( 5 ).
F-Administrative Exhibit I - Same Source G-Operator Error H-Other (Explain) (Explain) l l
4 o
DOCKET No: 50-414
!" UNIT: Catawba 2 DATE: 6/13/92 NARRATIVE
SUMMARY
MONTH: May 1992 Catawba Unit 2 began the month of May operating at 100% full power.
The unit operated at or near 100% full power for the entire month.
Prepared by: N. C. Simmons
-Telephone:- 704-38'-5263 l
I l
e
4 MONTHLY REFUELING INFORMATION REOUES_T
. l. Facility name: Catawba, Unit 2
- 2. Scheduled next refueling shutdown: February 1993
- 3. Scheduled restart following refueling: Aoril 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 T!iOUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Wi' .1 refueling or resumption of operation thereafter require a to:hnical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Lafety Review Committee regarding unreviewed safety questions?
- 5. Schedulc0 daie(s) for submitting proposed licensing action and supporting i'.. formation.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: ,113 (b) in the spent fuel pool: 280
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
- 9. Projected date - of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE: June 15, 1992 Name of
Contact:
R. A. Williams Phone: 704-382-5346