Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101H931 + (09:45:29, 13 December 2024)
- ML20101H930 + (09:45:30, 13 December 2024)
- ML20101H929 + (09:45:31, 13 December 2024)
- ST-HL-AE-5321, Forwards Revised STP Electric Generating Station Operations QA Plan, Incorporating Methodology for Implementation of STP Graded QA Program.Draft Procedures Also Encl + (09:45:32, 13 December 2024)
- L-84-149, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-11 & 50-251/84-11.Corrective Actions:Personnel Counseled Re Valve Clearance Procedure & Initial Air Aerosol Mixing Uniformity Test Procedures Developed + (09:45:38, 13 December 2024)
- ML20101H905 + (09:45:38, 13 December 2024)
- ML20101H895 + (09:45:44, 13 December 2024)
- ML20101H893 + (09:45:50, 13 December 2024)
- ST-HL-AE-5323, Forwards ANI to Maelu Policy 96-201,NEIL-III Policy UX95-075 & NEIL-III Policy UX95-075,per 10CFR50.54(w)(2) + (09:45:51, 13 December 2024)
- ML20101H872 + (09:46:00, 13 December 2024)
- ML20101H867 + (09:46:00, 13 December 2024)
- ML20101H852 + (09:46:01, 13 December 2024)
- 05000249/LER-1984-022-04, :on 840317,reactor Scrammed While Adjusting Mode Switch in Attempt to Clear Rod Block.Caused by Operator Error When Mode Switch Inadvertently Moved to Shutdown Position.Operator Counseled + (09:46:08, 13 December 2024)
- ML20101H830 + (09:46:09, 13 December 2024)
- ELV-03648, Forwards Response to Rev 1 to Generic Ltr 92-01 Re Reactor Vessel Structural Integrity.Heat Number of Each Beltline Plate Located on C-E Matl Certification Repts Maintained by Westinghouse + (09:46:10, 13 December 2024)
- 05000249/LER-1984-021-04, :on 840307,reactor Scrammed During Surveillance Testing.Caused by Bad Jumper Wire.Jumper Discarded & Personnel Reinstructed on Using Jumper Wire Const for Surveillance Test + (09:46:16, 13 December 2024)
- ML20101H820 + (09:46:18, 13 December 2024)
- 05000336/LER-1996-007, :on 960220,discovered RCS C/D Rate Exceeded TS Limit.Caused by Use of Wrong Temp Sensor.Plant Operating Procedures,Heatup/C/D Monitoring Computer Program & Operator Training Involving These Events Revised + (09:46:24, 13 December 2024)
- 1CAN069203, Forwards Arkansas Nuclear One,Unit 1 Reactor Containment Bldg Integrated Leakage Rate Test Rept, for Apr 1992 + (09:46:25, 13 December 2024)
- ML20101H804 + (09:46:26, 13 December 2024)
- ML20101H801 + (09:46:32, 13 December 2024)
- ML20101H795 + (09:46:38, 13 December 2024)
- ML20101H791 + (09:46:39, 13 December 2024)
- ML20101H784 + (09:46:40, 13 December 2024)
- ML20101H782 + (09:46:40, 13 December 2024)
- ML20101H769 + (09:46:46, 13 December 2024)
- ML20101H763 + (09:46:47, 13 December 2024)
- ML20101H759 + (09:46:48, 13 December 2024)
- 05000412/LER-1992-008, :on 920526,closing Springs on Quench Spray Pump a Breaker Found Discharged from 920423-0526.Caused by Failed Breaker Control Device.Breaker Replaced W/Spare & Sample of 4 Kv Breakers Will Be Inspected + (09:46:54, 13 December 2024)
- ML20101H732 + (09:46:55, 13 December 2024)
- ML20101H731 + (09:46:56, 13 December 2024)
- ML20101H725 + (09:46:57, 13 December 2024)
- 05000254/LER-1987-016, :on 870912,determined That Measured Combined Leakage Rate from All Penetrations & Valves Exceeded TS Limit of 293.75 Scfh.Caused by Rust on Valves & Valve Stuck Open.Gates Valves Will Be Replaced + (09:47:03, 13 December 2024)
- 05000373/LER-1992-007-06, :on 920531,spurious auto-start of Control Room Ventilation Emergency Makeup Train Occurred Due to High Radiation Spike.Detectors Taken Apart,Cleaned & Inspected & Chart Recorders Connected + (09:47:19, 13 December 2024)
- ML20101H674 + (09:47:21, 13 December 2024)
- U-601997, Rev 11 to Revised Inservice Testing Program for Cps + (09:47:22, 13 December 2024)
- ML20101H667 + (09:47:23, 13 December 2024)
- ML20101H658 + (09:47:24, 13 December 2024)
- JPN-96-011, Forwards Application for Amend to License & Proposed TS, Supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day + (09:47:25, 13 December 2024)
- 05000289/LER-1984-007-02, :on 841116,once-through Steam Generator a Tubes Identified as Defective During Eddy Current Testing.Cause Not Finalized.Defective Tubes Removed from Svc + (09:47:31, 13 December 2024)
- ML20101H652 + (09:47:32, 13 December 2024)
- ML20101H638 + (09:47:33, 13 December 2024)
- ML20101H628 + (09:47:34, 13 December 2024)
- 05000382/LER-1996-004-01, :on 960228,failed to Meet Intent of TS Surveillance Due to Inadequate Corrective Actions.Changed Design of ACCW Sys & Reviewed Surveillance Procedures for Unidentified Work Arounds + (09:47:40, 13 December 2024)
- ML20101H611 + (09:47:49, 13 December 2024)
- ML20101H610 + (09:47:50, 13 December 2024)
- 05000424/LER-1992-005-03, :on 920604,containment Isolation Occurred Due to Inadvertent Grounding of Radiation Monitor Power Panel. Caused by Personnel Error.Personnel Will Receive Review of Event & Training Re Proper Use of Jumpers + (09:47:57, 13 December 2024)
- ML20101H606 + (09:47:58, 13 December 2024)
- L-84-176, Forwards Summary of Efforts Taken to Minimize Recurrence of Procedural Noncompliances & to Establish long-term Implementing Policy + (09:47:59, 13 December 2024)
- ML20101H588 + (09:48:00, 13 December 2024)
- ML20101H589 + (09:48:00, 13 December 2024)