Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101J920 + (09:42:30, 13 December 2024)
- ML20101J912 + (09:42:30, 13 December 2024)
- 1CAN128408, Informs That Util Unable to Complete Inservice Insp of Reactor Coolant Pump Casing Weld During Refueling Outage Due to Equipment Malfunctions.Schedular Relief Requested to Allow Exam to Be Deferred for One Cycle of Operation + (09:42:31, 13 December 2024)
- ML20101J909 + (09:42:32, 13 December 2024)
- B15464, Application for Amend to License DPR-65,revising TS Section 3.7.7, Sealed Source Contamination & Bases + (09:42:33, 13 December 2024)
- ML20101J897 + (09:42:33, 13 December 2024)
- RBG-42678, Forwards Revised NRC Service List Due to Recent Organizational Changes + (09:42:34, 13 December 2024)
- ML20101J878 + (09:42:35, 13 December 2024)
- NRC-2020-0052, Comment (13) of Martin Kral on Holtec International HI-STORE Consolidated Interim Storage Facility Project + (09:42:35, 13 December 2024)
- NPL-96-0102, Forwards Table 1 Containing List of Plant Radiation Monitors,In Response to Inquiry as to Which Radiation Monitors Affected by TS Change Request 172,modifying TS Section 15.4.1, Operational Safety Review + (09:42:36, 13 December 2024)
- ML20101J841 + (09:42:37, 13 December 2024)
- ML20101J840 + (09:42:38, 13 December 2024)
- 05000333/LER-1996-004-01, :on 960228,multiple SRV Pilot Solenoid Failed Due to Foreign Matls,Vendor Deficiencies & Procedural Errors.Replaced Pilot Solenoid Valve W/Another Rebuilt Assembly + (09:42:44, 13 December 2024)
- ML20101J831 + (09:42:45, 13 December 2024)
- ML20101J827 + (09:42:46, 13 December 2024)
- ML20101J806 + (09:42:47, 13 December 2024)
- ML20101J788 + (09:42:48, 13 December 2024)
- ML20101J793 + (09:42:48, 13 December 2024)
- ML20101J787 + (09:42:49, 13 December 2024)
- ML20101J785 + (09:42:50, 13 December 2024)
- ML20101J775 + (09:42:50, 13 December 2024)
- RBG-19-753, Responds to Instrumentation & Control Sys Branch Request for Addl Info Re Adequate Voltage to Reactor Protection Sys Scram Pilot Valve Solenoids.Response Closes Out Confirmatory Item 24 of SER Table 1.4 + (09:42:51, 13 December 2024)
- ML20101J768 + (09:42:52, 13 December 2024)
- ML20101J762 + (09:42:52, 13 December 2024)
- ML20101J761 + (09:42:53, 13 December 2024)
- ML20101J753 + (09:42:54, 13 December 2024)
- ML20101J732 + (09:42:55, 13 December 2024)
- ML20101J736 + (09:42:55, 13 December 2024)
- ML20101J723 + (09:42:56, 13 December 2024)
- ML20101J719 + (09:42:58, 13 December 2024)
- ML20101J709 + (09:43:01, 13 December 2024)
- ML20101J701 + (09:43:02, 13 December 2024)
- RBG-19-755, Forwards Description of Results of Comparison Study Demonstrating That Structural Integrity Not Compromised Under Existing Support Design,In Response to 840927 Request. Response to SER Confirmatory Item 7 Complete + (09:43:03, 13 December 2024)
- ML20101J672 + (09:43:03, 13 December 2024)
- ML20101J667 + (09:43:04, 13 December 2024)
- 05000443/LER-1992-005, :on 920529,two Out of Three Pressure Code Safety Valves Failed Required Setpoint Testing.Caused by Leakage in 1 Valve & Cause Unknown in Other Valve.Valves Retested & Reworked as Needed + (09:43:07, 13 December 2024)
- ML20101J634 + (09:43:14, 13 December 2024)
- ML20101J609 + (09:43:15, 13 December 2024)
- ML20101J599 + (09:43:16, 13 December 2024)
- ST-HL-AE-5330, Requests That Distribution Lists for Transmittals Re Plant Be Changed as Listed + (09:43:17, 13 December 2024)
- ML20101J587 + (09:43:18, 13 December 2024)
- ML20101J583 + (09:43:20, 13 December 2024)
- ML20101J559 + (09:43:21, 13 December 2024)
- ML20101J552 + (09:43:21, 13 December 2024)
- ML20101J551 + (09:43:22, 13 December 2024)
- ML20101J549 + (09:43:23, 13 December 2024)
- NRC-96-0040, Provides Current Level of Property Damage & Decontamination Insurance for Facility,Per 10CFR50.54(w)(3) + (09:43:24, 13 December 2024)
- PY-CEI-NRR-2040, Forwards,Per 10CFR50.54(w)(3) Requirements,Property Insurance Coverage Info for Perry Nuclear Power Plant/ Davis-Besse Nuclear Power Station + (09:43:24, 13 December 2024)
- ML20101J507 + (09:43:25, 13 December 2024)
- ML20101J506 + (09:43:26, 13 December 2024)
- ML20101J505 + (09:43:27, 13 December 2024)
- ML20101J502 + (09:43:27, 13 December 2024)